CDOT contract C25826 bid tabulation
VASQUEZ BLVD - I270 TO 64TH - PACKAGE 1. Let by Colorado DOT on May 23, 2025. 1 bid received; low bid $10,683,069 by Jalisco International, Inc., -0.0% against the engineer's estimate of $10,683,069.
- Owner
- Colorado DOT
- Letting
- 23 MAY 2025
- Pay items
- 191
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jalisco International, Inc. | $10,683,069 | Low | 0.0% |
Engineer's estimate: $10,683,069.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jalisco International, Inc. |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $34,702 | $34,702 |
| 2 | Removal of tree (202-00010) | EACH | 6 | $893.83 | $893.83 |
| 3 | Removal of inlet (202-00019) | EACH | 6 | $3,107.20 | $3,107.20 |
| 4 | Removal of fire hydrant (202-00031) | EACH | 1 | $1,438.52 | $1,438.52 |
| 5 | Removal of pipe (202-00035) | LF | 128 | $78.26 | $78.26 |
| 6 | Removal of delineator (202-00090) | EACH | 18 | $17.06 | $17.06 |
| 7 | Removal of median cover (202-00195) | SY | 2,647 | $15.37 | $15.37 |
| 8 | Removal of sidewalk (202-00200) | SY | 1,309 | $16.95 | $16.95 |
| 9 | Removal of curb (202-00201) | LF | 1,837 | $9.99 | $9.99 |
| 10 | Removal of gutter (202-00202) | LF | 110 | $10.09 | $10.09 |
| 11 | Removal of curb and gutter (202-00203) | LF | 5,985 | $11.37 | $11.37 |
| 12 | Removal of concrete curb ramp (202-00206) | SY | 184 | $32.35 | $32.35 |
| 13 | Removal of concrete pavement (202-00210) | SY | 49 | $13.22 | $13.22 |
| 14 | Removal of asphalt mat (202-00220) | SY | 15,225 | $16.28 | $16.28 |
| 15 | Removal of asphalt mat (planing) (202-00240) | SY | 13,044 | $3.32 | $3.32 |
| 16 | Removal of pavement marking (202-00250) | SF | 2,094 | $3.39 | $3.39 |
| 17 | Removal of ground sign (202-00810) | EACH | 21 | $187.68 | $187.68 |
| 18 | Removal of sign panel (202-00821) | EACH | 10 | $568.71 | $568.71 |
| 19 | Removal of pull box (202-00827) | EACH | 3 | $230.21 | $230.21 |
| 20 | Removal of traffic signal equipment (202-00828) | LS | 1 | $19,594 | $19,594 |
| 21 | Removal of guardrail type 3 (202-01130) | LF | 524 | $8.46 | $8.46 |
| 22 | Removal of guardrail type 7 (202-01170) | LF | 1,543 | $62.95 | $62.95 |
| 23 | Removal of end anchorage (202-01300) | EACH | 2 | $507.81 | $507.81 |
| 24 | Clean culvert (202-04002) | EACH | 25 | $1,111.15 | $1,111.15 |
| 25 | Clean valve box (202-04005) | EACH | 12 | $222.23 | $222.23 |
| 26 | Unclassified excavation (complete in place) (203-00010) | CY | 8,232 | $56.12 | $56.12 |
| 27 | Unsuitable material (203-00050) | CY | 500 | $50.29 | $50.29 |
| 28 | Blading (203-01500) | HR | 40 | $182.24 | $182.24 |
| 29 | Combination loader (203-01594) | HR | 40 | $159.03 | $159.03 |
| 30 | Potholing (203-01597) | HR | 250 | $277.33 | $277.33 |
| 31 | Structure excavation (206-00000) | CY | 164 | $55.37 | $55.37 |
| 32 | Structure backfill (class 2) (206-00200) | CY | 3 | $176.67 | $176.67 |
| 33 | Filter material (class A) (206-00510) | CY | 3 | $949.88 | $949.88 |
| 34 | Topsoil (onsite) (207-00700) | CY | 1,500 | $32.60 | $32.60 |
| 35 | Topsoil (offsite) (207-00702) | CY | 2,030 | $57.67 | $57.67 |
| 36 | Subgrade soil preparation (207-00704) | SY | 8,960 | $2.05 | $2.05 |
| 37 | Erosion log type 1 (12 inch) (208-00002) | LF | 7,500 | $6.49 | $6.49 |
| 38 | Erosion log type 1 (20 inch) (208-00013) | LF | 50 | $11.78 | $11.78 |
| 39 | Silt fence (208-00020) | LF | 500 | $2.84 | $2.84 |
| 40 | Aggregate bag (208-00035) | LF | 252 | $16.15 | $16.15 |
| 41 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 3 | $4,251.32 | $4,251.32 |
| 42 | Storm drain inlet protection (type I) (84 inch) (208-00053) | EACH | 7 | $397.60 | $397.60 |
| 43 | Storm drain inlet protection (type II) (208-00054) | EACH | 21 | $472.46 | $472.46 |
| 44 | Storm drain inlet protection (type I) (144 inch) (208-00057) | EACH | 7 | $374.29 | $374.29 |
| 45 | Pre-fabricated vehicle tracking pad (208-00075) | EACH | 2 | $14,637 | $14,637 |
| 46 | Removal and disposal of sediment (labor) (208-00103) | HR | 80 | $48.27 | $48.27 |
| 47 | Removal and disposal of sediment (equipment) (208-00105) | HR | 60 | $114.64 | $114.64 |
| 48 | Sweeping (sediment removal) (208-00106) | HR | 120 | $215.08 | $215.08 |
| 49 | Removal of trash (208-00107) | HR | 20 | $224.22 | $224.22 |
| 50 | Erosion control management (208-00207) | DAY | 303 | $279.33 | $279.33 |
| 51 | Reset radio communication antenna (210-00479) | EACH | 1 | $1,551.65 | $1,551.65 |
| 52 | Reset light standard (210-00750) | EACH | 4 | $2,122.65 | $2,122.65 |
| 53 | Reset ground sign (210-00810) | EACH | 9 | $625.58 | $625.58 |
| 54 | Reset sign panel (210-00815) | EACH | 14 | $284.35 | $284.35 |
| 55 | Reset fire preemption unit and timer (210-00866) | EACH | 2 | $835.06 | $835.06 |
| 56 | Portable pan-tilt-zoom camera (reset) (210-00892) | EACH | 1 | $311.45 | $311.45 |
| 57 | Adjust manhole (210-04010) | EACH | 3 | $658.01 | $658.01 |
| 58 | Adjust manhole (special) (210-04011) | EACH | 8 | $1,673.02 | $1,673.02 |
| 59 | Modify manhole (210-04015) | EACH | 2 | $5,610.23 | $5,610.23 |
| 60 | Adjust valve box (210-04050) | EACH | 12 | $274.16 | $274.16 |
| 61 | Dewatering (211-03005) | LS | 1 | $16,378 | $16,378 |
| 62 | Compost (mechanically applied) (212-00701) | CY | 100 | $97.43 | $97.43 |
| 63 | Mycorrhizae (212-00704) | LB | 250 | $23.69 | $23.69 |
| 64 | Seeding (native) hydraulic (212-00707) | ACRE | 1.85 | $1,327.34 | $1,327.34 |
| 65 | Spray-on mulch blanket (213-00012) | ACRE | 1.85 | $5,623.35 | $5,623.35 |
| 66 | Mulch tackifier (213-00061) | LB | 370 | $6.15 | $6.15 |
| 67 | Deciduous tree (2.5 inch caliper) (furnish only) (214-00227) | EACH | 6 | $1,017.28 | $1,017.28 |
| 68 | Wildlife biologist (240-00000) | HR | 40 | $195.64 | $195.64 |
| 69 | Removal of nests (240-00010) | HR | 40 | $184.13 | $184.13 |
| 70 | Prairie dog management (240-00100) | LS | 1 | $17,723 | $17,723 |
| 71 | Aggregate base course (class 6) (304-06007) | CY | 7,415 | $70.73 | $70.73 |
| 72 | Reconditioning (306-01000) | SY | 26,880 | $9.02 | $9.02 |
| 73 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 595 | $107.91 | $107.91 |
| 74 | Hot mix asphalt (grading S) (100) (PG 64- 22) (403-33841) | TON | 5,510 | $101.08 | $101.08 |
| 75 | Hot mix asphalt (grading SX) (100) (PG 76- 28) (403-34871) | TON | 3,394 | $136.21 | $136.21 |
| 76 | Emulsified asphalt (slow-setting) (411-10255) | GAL | 3,821 | $6.05 | $6.05 |
| 77 | Concrete pavement (8 inch) (412-00800) | SY | 142 | $131.48 | $131.48 |
| 78 | Drilled shaft (18 inch) (503-00018) | LF | 25 | $432.20 | $432.20 |
| 79 | Drilled shaft (36 inch) (503-00036) | LF | 18 | $709.81 | $709.81 |
| 80 | Drilled shaft (48 inch) (503-00048) | LF | 62 | $890.96 | $890.96 |
| 81 | Drilled shaft (54 inch) (503-00054) | LF | 42 | $1,152.17 | $1,152.17 |
| 82 | Masonry landscape wall (dry stack) (504-08255) | SF | 61 | $160.07 | $160.07 |
| 83 | Riprap (9 inch) (506-00209) | CY | 8 | $229.08 | $229.08 |
| 84 | Concrete slope and ditch paving (reinforced) (507-00100) | CY | 1.30 | $900.35 | $900.35 |
| 85 | 18 inch reinforced concrete pipe (complete in place) (603-01185) | LF | 54 | $233.93 | $233.93 |
| 86 | 24 inch reinforced concrete pipe (complete in place) (603-01245) | LF | 275 | $238.30 | $238.30 |
| 87 | 23X14 inch reinforced concrete pipe elliptical (complete in place) (603-02185) | LF | 63 | $382.54 | $382.54 |
| 88 | 30X19 inch reinforced concrete pipe elliptical (complete in place) (603-02245) | LF | 166 | $351.38 | $351.38 |
| 89 | Inlet type D (5 foot) (604-00505) | EACH | 1 | $14,250 | $14,250 |
| 90 | Inlet type 16 (double) (5 foot) (604-16505) | EACH | 2 | $15,001 | $15,001 |
| 91 | Inlet type 16 (triple) (5 foot) (604-16605) | EACH | 1 | $19,734 | $19,734 |
| 92 | Inlet type R L 5 (10 foot) (604-19110) | EACH | 1 | $12,982 | $12,982 |
| 93 | Inlet type R L 10 (5 foot) (604-19205) | EACH | 6 | $16,344 | $16,344 |
| 94 | Manhole slab base (5 foot) (604-30005) | EACH | 3 | $11,490 | $11,490 |
| 95 | Manhole slab base (10 foot) (604-30010) | EACH | 3 | $12,167 | $12,167 |
| 96 | Guardrail type 3 (31 inch midwest guardrail system) (606-00302) | LF | 537.50 | $43.73 | $43.73 |
| 97 | Guardrail type 3 (double)(6-3 post spacing)(special) (606-00355) | LF | 37.50 | $145.01 | $145.01 |
| 98 | Guardrail type 7 (style CA) (606-00710) | LF | 10 | $254.82 | $254.82 |
| 99 | Guardrail type 9 (style CA) (606-00910) | LF | 641 | $113.85 | $113.85 |
| 100 | Guardrail type 9 (style CD) (special) (606-00931) | LF | 183 | $278.80 | $278.80 |
| 101 | End anchorage type 3D (606-01340) | EACH | 1 | $2,386.71 | $2,386.71 |
| 102 | Transition type 3G (606-01370) | EACH | 4 | $8,407.10 | $8,407.10 |
| 103 | Median terminal (606-01460) | EACH | 3 | $13,767 | $13,767 |
| 104 | End anchorage (nonflared) (606-02003) | EACH | 1 | $4,739.57 | $4,739.57 |
| 105 | Fence (plastic) (607-11525) | LF | 1,000 | $3.23 | $3.23 |
| 106 | Concrete sidewalk (6 inch) (608-00006) | SY | 2,880 | $74.62 | $74.62 |
| 107 | Concrete curb ramp (608-00010) | SY | 364 | $212.60 | $212.60 |
| 108 | Curb and gutter type 2 (section I-B) (609-21010) | LF | 7,167 | $28.93 | $28.93 |
| 109 | Curb and gutter type 2 (section II-B) (609-21020) | LF | 4,265 | $31.24 | $31.24 |
| 110 | Gutter type 2 (8 foot) (609-24008) | LF | 160 | $121.01 | $121.01 |
| 111 | Curb (median) (special) (609-40120) | SY | 21 | $188.06 | $188.06 |
| 112 | Median cover material (concrete) (610-00030) | SF | 31,168 | $15.11 | $15.11 |
| 113 | Delineator (type I) (612-00001) | EACH | 50 | $36.40 | $36.40 |
| 114 | Delineator (type II) (612-00002) | EACH | 25 | $36.40 | $36.40 |
| 115 | Delineator (type III) (612-00003) | EACH | 10 | $36.40 | $36.40 |
| 116 | Location marker (fiber optic)(dome) (612-00260) | EACH | 8 | $194.10 | $194.10 |
| 117 | 2 inch electrical conduit (bored) (613-00206) | LF | 6,800 | $24.83 | $24.83 |
| 118 | 3 inch electrical conduit (bored) (613-00306) | LF | 1,100 | $39.50 | $39.50 |
| 119 | 2 inch electrical conduit (plastic) (613-01200) | LF | 1,205 | $25.96 | $25.96 |
| 120 | 3 inch electrical conduit (plastic) (613-01300) | LF | 190 | $45.14 | $45.14 |
| 121 | Type four pull box (613-07004) | EACH | 13 | $3,432.80 | $3,432.80 |
| 122 | Type five pull box (613-07005) | EACH | 6 | $5,026.20 | $5,026.20 |
| 123 | Pull box (11"X18"X12") (613-07011) | EACH | 4 | $886.97 | $886.97 |
| 124 | Wiring (613-10000) | LS | 1 | $40,685 | $40,685 |
| 125 | Luminaire (LED) (special) (613-13000) | EACH | 6 | $1,033.68 | $1,033.68 |
| 126 | Light standard foundation (613-40010) | EACH | 4 | $3,925.94 | $3,925.94 |
| 127 | Transformer base aluminum (613-40020) | EACH | 4 | $1,258.25 | $1,258.25 |
| 128 | Service meter cabinet (613-80130) | EACH | 2 | $3,712.67 | $3,712.67 |
| 129 | Sign panel (class I) (614-00011) | SF | 500 | $27.88 | $27.88 |
| 130 | Sign panel (class III) (614-00013) | SF | 207 | $56.30 | $56.30 |
| 131 | Steel sign support (2-inch round)(post & socket) (614-01502) | LF | 138 | $34.12 | $34.12 |
| 132 | Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01572) | LF | 325 | $59.72 | $59.72 |
| 133 | Illuminated sign (614-10130) | EACH | 5 | $7,496.42 | $7,496.42 |
| 134 | Monotube overhead sign cantilever (24 inch diameter) (614-32400) | EACH | 1 | $58,743 | $58,743 |
| 135 | 1310NM SFP optic module (614-70024) | EACH | 5 | $722.22 | $722.22 |
| 136 | Optical attenuator (614-70030) | EACH | 5 | $212.16 | $212.16 |
| 137 | Pedestrian signal face (16) (countdown) (614-70150) | EACH | 7 | $899.39 | $899.39 |
| 138 | Traffic signal face (12-12-12) (614-70336) | EACH | 22 | $1,265.02 | $1,265.02 |
| 139 | Traffic signal face (12-12-12-12) (614-70448) | EACH | 4 | $1,640.80 | $1,640.80 |
| 140 | Conflict monitor (614-72836) | EACH | 2 | $1,908.24 | $1,908.24 |
| 141 | Pedestrian push button (614-72860) | EACH | 7 | $1,840.53 | $1,840.53 |
| 142 | Pedestrian push button post assembly (614-72863) | EACH | 1 | $1,161.20 | $1,161.20 |
| 143 | Fire preemption unit and timer (614-72866) | EACH | 4 | $4,350.26 | $4,350.26 |
| 144 | Traffic signal vehicle detector (micro wave type) (614-72884) | EACH | 7 | $12,932 | $12,932 |
| 145 | Microwave vehicle radar detector (614-72887) | EACH | 4 | $11,951 | $11,951 |
| 146 | Traffic signal controller cabinet (install only) (614-75855) | EACH | 2 | $7,040.52 | $7,040.52 |
| 147 | Traffic signal-light pole steel (1 mast arm) (install only) (614-81011) | EACH | 5 | $1,858.59 | $1,858.59 |
| 148 | Traffic signal pedestal pole steel (614-84000) | EACH | 3 | $5,116.48 | $5,116.48 |
| 149 | Traffic signal controller (type 2070LC) (614-86248) | EACH | 2 | $9,744.35 | $9,744.35 |
| 150 | Uninterrupted power supply (614-86800) | EACH | 2 | $9,396.78 | $9,396.78 |
| 151 | Fiber optic cable (single mode) (12 fiber) (614-87010) | LF | 155 | $25.96 | $25.96 |
| 152 | Fiber optic termination panel (12 fiber) (614-87012) | EACH | 2 | $1,173.61 | $1,173.61 |
| 153 | Closed circuit television camera (traffic surveillance) (614-87333) | EACH | 2 | $6,477.41 | $6,477.41 |
| 154 | Test fiber optic cable (614-87350) | LS | 1 | $11,925 | $11,925 |
| 155 | Fiber optic cable (single mode) (96 strands) (614-87496) | LF | 5,810 | $5.64 | $5.64 |
| 156 | Ethernet switch type II (614-87692) | EACH | 2 | $9,629.24 | $9,629.24 |
| 157 | Connect to existing waterline (619-00007) | EACH | 1 | $2,301.64 | $2,301.64 |
| 158 | 6 inch ductile iron pipe (619-06060) | LF | 10 | $471.83 | $471.83 |
| 159 | 6 inch gate valve (619-75048) | EACH | 1 | $4,718.35 | $4,718.35 |
| 160 | 6 inch fire hydrant (619-78048) | EACH | 1 | $9,321.62 | $9,321.62 |
| 161 | Sanitary facility (620-00020) | EACH | 2 | $2,424.53 | $2,424.53 |
| 162 | Detour pavement (621-00450) | SY | 645 | $87.73 | $87.73 |
| 163 | 15 inch drainage pipe (class 7) (complete in place) (624-27016) | LF | 232 | $255.78 | $255.78 |
| 164 | 18 inch drainage pipe (class 7) (complete in place) (624-27019) | LF | 236 | $227.01 | $227.01 |
| 165 | 18 inch equivalent drainage pipe elliptical (class 7) (624-47018) | LF | 141 | $397.32 | $397.32 |
| 166 | 24 inch equivalent drainage pipe elliptical (class 9) (complete in place) (624-49025) | LF | 64 | $360.49 | $360.49 |
| 167 | Construction surveying (625-00000) | LS | 1 | $143,101 | $143,101 |
| 168 | Mobilization (626-00000) | LS | 1 | $666,264 | $666,264 |
| 169 | Mobilization (without autopay) (626-00100) | LS | 1 | $1,730,954 | $1,730,954 |
| 170 | Public information management (tier III) (626-01113) | DAY | 521 | $96.46 | $96.46 |
| 171 | Modified epoxy pavement marking (627-00008) | GAL | 156.10 | $203.63 | $203.63 |
| 172 | Pavement marking paint (waterborne) (627-00011) | GAL | 25 | $96.16 | $96.16 |
| 173 | Preformed plastic pavement marking (word-symbol)(type I)(inlaid) (627-30323) | SF | 599 | $45.25 | $45.25 |
| 174 | Preformed plastic pavement marking (xwalk-stop line)(type I)(inlaid) (627-30328) | SF | 4,370 | $16.97 | $16.97 |
| 175 | Flagging (630-00000) | HR | 160 | $41.03 | $41.03 |
| 176 | Uniformed traffic control (630-00003) | HR | 160 | $227.93 | $227.93 |
| 177 | Traffic control inspection (630-00007) | DAY | 266 | $455.86 | $455.86 |
| 178 | Traffic control management (630-00012) | DAY | 250 | $1,413.15 | $1,413.15 |
| 179 | Barricade (type 3 M-A) (temporary) (630-80335) | EACH | 15 | $227.93 | $227.93 |
| 180 | Pedestrian barricade (ADA) (630-80340) | LF | 500 | $39.89 | $39.89 |
| 181 | Construction traffic sign (panel size A) (630-80341) | EACH | 58 | $91.17 | $91.17 |
| 182 | Construction traffic sign (panel size B) (630-80342) | EACH | 39 | $91.17 | $91.17 |
| 183 | Construction traffic sign (panel size C) (630-80343) | EACH | 3 | $91.17 | $91.17 |
| 184 | Construction traffic sign (special) (630-80344) | SF | 48 | $28.49 | $28.49 |
| 185 | Vertical panel (630-80350) | EACH | 50 | $51.28 | $51.28 |
| 186 | Portable message sign panel (630-80355) | EACH | 6 | $10,827 | $10,827 |
| 187 | Advance warning flashing or sequencing arrow panel (C type) (630-80358) | EACH | 1 | $5,470.29 | $5,470.28 |
| 188 | Drum channelizing device (630-80360) | EACH | 150 | $51.28 | $51.28 |
| 189 | Concrete barrier (temporary) (furnish and install) (630-80372) | LF | 5,800 | $70.37 | $70.37 |
| 190 | Traffic cone (630-80380) | EACH | 50 | $11.40 | $11.40 |
| 191 | Impact attenuator (temporary) (630-85010) | EACH | 6 | $11,444 | $11,444 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of May 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.