CDOT contract C25826 bid tabulation

VASQUEZ BLVD - I270 TO 64TH - PACKAGE 1. Let by Colorado DOT on May 23, 2025. 1 bid received; low bid $10,683,069 by Jalisco International, Inc., -0.0% against the engineer's estimate of $10,683,069.

Owner
Colorado DOT
Letting
23 MAY 2025
Pay items
191
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Jalisco International, Inc.$10,683,069Low0.0%
CDOT contract C25826: bids by rank

Engineer's estimate: $10,683,069.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Jalisco International, Inc.
1Clearing and grubbing (201-00000)LS1$34,702$34,702
2Removal of tree (202-00010)EACH6$893.83$893.83
3Removal of inlet (202-00019)EACH6$3,107.20$3,107.20
4Removal of fire hydrant (202-00031)EACH1$1,438.52$1,438.52
5Removal of pipe (202-00035)LF128$78.26$78.26
6Removal of delineator (202-00090)EACH18$17.06$17.06
7Removal of median cover (202-00195)SY2,647$15.37$15.37
8Removal of sidewalk (202-00200)SY1,309$16.95$16.95
9Removal of curb (202-00201)LF1,837$9.99$9.99
10Removal of gutter (202-00202)LF110$10.09$10.09
11Removal of curb and gutter (202-00203)LF5,985$11.37$11.37
12Removal of concrete curb ramp (202-00206)SY184$32.35$32.35
13Removal of concrete pavement (202-00210)SY49$13.22$13.22
14Removal of asphalt mat (202-00220)SY15,225$16.28$16.28
15Removal of asphalt mat (planing) (202-00240)SY13,044$3.32$3.32
16Removal of pavement marking (202-00250)SF2,094$3.39$3.39
17Removal of ground sign (202-00810)EACH21$187.68$187.68
18Removal of sign panel (202-00821)EACH10$568.71$568.71
19Removal of pull box (202-00827)EACH3$230.21$230.21
20Removal of traffic signal equipment (202-00828)LS1$19,594$19,594
21Removal of guardrail type 3 (202-01130)LF524$8.46$8.46
22Removal of guardrail type 7 (202-01170)LF1,543$62.95$62.95
23Removal of end anchorage (202-01300)EACH2$507.81$507.81
24Clean culvert (202-04002)EACH25$1,111.15$1,111.15
25Clean valve box (202-04005)EACH12$222.23$222.23
26Unclassified excavation (complete in place) (203-00010)CY8,232$56.12$56.12
27Unsuitable material (203-00050)CY500$50.29$50.29
28Blading (203-01500)HR40$182.24$182.24
29Combination loader (203-01594)HR40$159.03$159.03
30Potholing (203-01597)HR250$277.33$277.33
31Structure excavation (206-00000)CY164$55.37$55.37
32Structure backfill (class 2) (206-00200)CY3$176.67$176.67
33Filter material (class A) (206-00510)CY3$949.88$949.88
34Topsoil (onsite) (207-00700)CY1,500$32.60$32.60
35Topsoil (offsite) (207-00702)CY2,030$57.67$57.67
36Subgrade soil preparation (207-00704)SY8,960$2.05$2.05
37Erosion log type 1 (12 inch) (208-00002)LF7,500$6.49$6.49
38Erosion log type 1 (20 inch) (208-00013)LF50$11.78$11.78
39Silt fence (208-00020)LF500$2.84$2.84
40Aggregate bag (208-00035)LF252$16.15$16.15
41Pre-fabricated concrete washout structure (type 1) (208-00046)EACH3$4,251.32$4,251.32
42Storm drain inlet protection (type I) (84 inch) (208-00053)EACH7$397.60$397.60
43Storm drain inlet protection (type II) (208-00054)EACH21$472.46$472.46
44Storm drain inlet protection (type I) (144 inch) (208-00057)EACH7$374.29$374.29
45Pre-fabricated vehicle tracking pad (208-00075)EACH2$14,637$14,637
46Removal and disposal of sediment (labor) (208-00103)HR80$48.27$48.27
47Removal and disposal of sediment (equipment) (208-00105)HR60$114.64$114.64
48Sweeping (sediment removal) (208-00106)HR120$215.08$215.08
49Removal of trash (208-00107)HR20$224.22$224.22
50Erosion control management (208-00207)DAY303$279.33$279.33
51Reset radio communication antenna (210-00479)EACH1$1,551.65$1,551.65
52Reset light standard (210-00750)EACH4$2,122.65$2,122.65
53Reset ground sign (210-00810)EACH9$625.58$625.58
54Reset sign panel (210-00815)EACH14$284.35$284.35
55Reset fire preemption unit and timer (210-00866)EACH2$835.06$835.06
56Portable pan-tilt-zoom camera (reset) (210-00892)EACH1$311.45$311.45
57Adjust manhole (210-04010)EACH3$658.01$658.01
58Adjust manhole (special) (210-04011)EACH8$1,673.02$1,673.02
59Modify manhole (210-04015)EACH2$5,610.23$5,610.23
60Adjust valve box (210-04050)EACH12$274.16$274.16
61Dewatering (211-03005)LS1$16,378$16,378
62Compost (mechanically applied) (212-00701)CY100$97.43$97.43
63Mycorrhizae (212-00704)LB250$23.69$23.69
64Seeding (native) hydraulic (212-00707)ACRE1.85$1,327.34$1,327.34
65Spray-on mulch blanket (213-00012)ACRE1.85$5,623.35$5,623.35
66Mulch tackifier (213-00061)LB370$6.15$6.15
67Deciduous tree (2.5 inch caliper) (furnish only) (214-00227)EACH6$1,017.28$1,017.28
68Wildlife biologist (240-00000)HR40$195.64$195.64
69Removal of nests (240-00010)HR40$184.13$184.13
70Prairie dog management (240-00100)LS1$17,723$17,723
71Aggregate base course (class 6) (304-06007)CY7,415$70.73$70.73
72Reconditioning (306-01000)SY26,880$9.02$9.02
73Hot mix asphalt (patching) (asphalt) (403-00720)TON595$107.91$107.91
74Hot mix asphalt (grading S) (100) (PG 64- 22) (403-33841)TON5,510$101.08$101.08
75Hot mix asphalt (grading SX) (100) (PG 76- 28) (403-34871)TON3,394$136.21$136.21
76Emulsified asphalt (slow-setting) (411-10255)GAL3,821$6.05$6.05
77Concrete pavement (8 inch) (412-00800)SY142$131.48$131.48
78Drilled shaft (18 inch) (503-00018)LF25$432.20$432.20
79Drilled shaft (36 inch) (503-00036)LF18$709.81$709.81
80Drilled shaft (48 inch) (503-00048)LF62$890.96$890.96
81Drilled shaft (54 inch) (503-00054)LF42$1,152.17$1,152.17
82Masonry landscape wall (dry stack) (504-08255)SF61$160.07$160.07
83Riprap (9 inch) (506-00209)CY8$229.08$229.08
84Concrete slope and ditch paving (reinforced) (507-00100)CY1.30$900.35$900.35
8518 inch reinforced concrete pipe (complete in place) (603-01185)LF54$233.93$233.93
8624 inch reinforced concrete pipe (complete in place) (603-01245)LF275$238.30$238.30
8723X14 inch reinforced concrete pipe elliptical (complete in place) (603-02185)LF63$382.54$382.54
8830X19 inch reinforced concrete pipe elliptical (complete in place) (603-02245)LF166$351.38$351.38
89Inlet type D (5 foot) (604-00505)EACH1$14,250$14,250
90Inlet type 16 (double) (5 foot) (604-16505)EACH2$15,001$15,001
91Inlet type 16 (triple) (5 foot) (604-16605)EACH1$19,734$19,734
92Inlet type R L 5 (10 foot) (604-19110)EACH1$12,982$12,982
93Inlet type R L 10 (5 foot) (604-19205)EACH6$16,344$16,344
94Manhole slab base (5 foot) (604-30005)EACH3$11,490$11,490
95Manhole slab base (10 foot) (604-30010)EACH3$12,167$12,167
96Guardrail type 3 (31 inch midwest guardrail system) (606-00302)LF537.50$43.73$43.73
97Guardrail type 3 (double)(6-3 post spacing)(special) (606-00355)LF37.50$145.01$145.01
98Guardrail type 7 (style CA) (606-00710)LF10$254.82$254.82
99Guardrail type 9 (style CA) (606-00910)LF641$113.85$113.85
100Guardrail type 9 (style CD) (special) (606-00931)LF183$278.80$278.80
101End anchorage type 3D (606-01340)EACH1$2,386.71$2,386.71
102Transition type 3G (606-01370)EACH4$8,407.10$8,407.10
103Median terminal (606-01460)EACH3$13,767$13,767
104End anchorage (nonflared) (606-02003)EACH1$4,739.57$4,739.57
105Fence (plastic) (607-11525)LF1,000$3.23$3.23
106Concrete sidewalk (6 inch) (608-00006)SY2,880$74.62$74.62
107Concrete curb ramp (608-00010)SY364$212.60$212.60
108Curb and gutter type 2 (section I-B) (609-21010)LF7,167$28.93$28.93
109Curb and gutter type 2 (section II-B) (609-21020)LF4,265$31.24$31.24
110Gutter type 2 (8 foot) (609-24008)LF160$121.01$121.01
111Curb (median) (special) (609-40120)SY21$188.06$188.06
112Median cover material (concrete) (610-00030)SF31,168$15.11$15.11
113Delineator (type I) (612-00001)EACH50$36.40$36.40
114Delineator (type II) (612-00002)EACH25$36.40$36.40
115Delineator (type III) (612-00003)EACH10$36.40$36.40
116Location marker (fiber optic)(dome) (612-00260)EACH8$194.10$194.10
1172 inch electrical conduit (bored) (613-00206)LF6,800$24.83$24.83
1183 inch electrical conduit (bored) (613-00306)LF1,100$39.50$39.50
1192 inch electrical conduit (plastic) (613-01200)LF1,205$25.96$25.96
1203 inch electrical conduit (plastic) (613-01300)LF190$45.14$45.14
121Type four pull box (613-07004)EACH13$3,432.80$3,432.80
122Type five pull box (613-07005)EACH6$5,026.20$5,026.20
123Pull box (11"X18"X12") (613-07011)EACH4$886.97$886.97
124Wiring (613-10000)LS1$40,685$40,685
125Luminaire (LED) (special) (613-13000)EACH6$1,033.68$1,033.68
126Light standard foundation (613-40010)EACH4$3,925.94$3,925.94
127Transformer base aluminum (613-40020)EACH4$1,258.25$1,258.25
128Service meter cabinet (613-80130)EACH2$3,712.67$3,712.67
129Sign panel (class I) (614-00011)SF500$27.88$27.88
130Sign panel (class III) (614-00013)SF207$56.30$56.30
131Steel sign support (2-inch round)(post & socket) (614-01502)LF138$34.12$34.12
132Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01572)LF325$59.72$59.72
133Illuminated sign (614-10130)EACH5$7,496.42$7,496.42
134Monotube overhead sign cantilever (24 inch diameter) (614-32400)EACH1$58,743$58,743
1351310NM SFP optic module (614-70024)EACH5$722.22$722.22
136Optical attenuator (614-70030)EACH5$212.16$212.16
137Pedestrian signal face (16) (countdown) (614-70150)EACH7$899.39$899.39
138Traffic signal face (12-12-12) (614-70336)EACH22$1,265.02$1,265.02
139Traffic signal face (12-12-12-12) (614-70448)EACH4$1,640.80$1,640.80
140Conflict monitor (614-72836)EACH2$1,908.24$1,908.24
141Pedestrian push button (614-72860)EACH7$1,840.53$1,840.53
142Pedestrian push button post assembly (614-72863)EACH1$1,161.20$1,161.20
143Fire preemption unit and timer (614-72866)EACH4$4,350.26$4,350.26
144Traffic signal vehicle detector (micro wave type) (614-72884)EACH7$12,932$12,932
145Microwave vehicle radar detector (614-72887)EACH4$11,951$11,951
146Traffic signal controller cabinet (install only) (614-75855)EACH2$7,040.52$7,040.52
147Traffic signal-light pole steel (1 mast arm) (install only) (614-81011)EACH5$1,858.59$1,858.59
148Traffic signal pedestal pole steel (614-84000)EACH3$5,116.48$5,116.48
149Traffic signal controller (type 2070LC) (614-86248)EACH2$9,744.35$9,744.35
150Uninterrupted power supply (614-86800)EACH2$9,396.78$9,396.78
151Fiber optic cable (single mode) (12 fiber) (614-87010)LF155$25.96$25.96
152Fiber optic termination panel (12 fiber) (614-87012)EACH2$1,173.61$1,173.61
153Closed circuit television camera (traffic surveillance) (614-87333)EACH2$6,477.41$6,477.41
154Test fiber optic cable (614-87350)LS1$11,925$11,925
155Fiber optic cable (single mode) (96 strands) (614-87496)LF5,810$5.64$5.64
156Ethernet switch type II (614-87692)EACH2$9,629.24$9,629.24
157Connect to existing waterline (619-00007)EACH1$2,301.64$2,301.64
1586 inch ductile iron pipe (619-06060)LF10$471.83$471.83
1596 inch gate valve (619-75048)EACH1$4,718.35$4,718.35
1606 inch fire hydrant (619-78048)EACH1$9,321.62$9,321.62
161Sanitary facility (620-00020)EACH2$2,424.53$2,424.53
162Detour pavement (621-00450)SY645$87.73$87.73
16315 inch drainage pipe (class 7) (complete in place) (624-27016)LF232$255.78$255.78
16418 inch drainage pipe (class 7) (complete in place) (624-27019)LF236$227.01$227.01
16518 inch equivalent drainage pipe elliptical (class 7) (624-47018)LF141$397.32$397.32
16624 inch equivalent drainage pipe elliptical (class 9) (complete in place) (624-49025)LF64$360.49$360.49
167Construction surveying (625-00000)LS1$143,101$143,101
168Mobilization (626-00000)LS1$666,264$666,264
169Mobilization (without autopay) (626-00100)LS1$1,730,954$1,730,954
170Public information management (tier III) (626-01113)DAY521$96.46$96.46
171Modified epoxy pavement marking (627-00008)GAL156.10$203.63$203.63
172Pavement marking paint (waterborne) (627-00011)GAL25$96.16$96.16
173Preformed plastic pavement marking (word-symbol)(type I)(inlaid) (627-30323)SF599$45.25$45.25
174Preformed plastic pavement marking (xwalk-stop line)(type I)(inlaid) (627-30328)SF4,370$16.97$16.97
175Flagging (630-00000)HR160$41.03$41.03
176Uniformed traffic control (630-00003)HR160$227.93$227.93
177Traffic control inspection (630-00007)DAY266$455.86$455.86
178Traffic control management (630-00012)DAY250$1,413.15$1,413.15
179Barricade (type 3 M-A) (temporary) (630-80335)EACH15$227.93$227.93
180Pedestrian barricade (ADA) (630-80340)LF500$39.89$39.89
181Construction traffic sign (panel size A) (630-80341)EACH58$91.17$91.17
182Construction traffic sign (panel size B) (630-80342)EACH39$91.17$91.17
183Construction traffic sign (panel size C) (630-80343)EACH3$91.17$91.17
184Construction traffic sign (special) (630-80344)SF48$28.49$28.49
185Vertical panel (630-80350)EACH50$51.28$51.28
186Portable message sign panel (630-80355)EACH6$10,827$10,827
187Advance warning flashing or sequencing arrow panel (C type) (630-80358)EACH1$5,470.29$5,470.28
188Drum channelizing device (630-80360)EACH150$51.28$51.28
189Concrete barrier (temporary) (furnish and install) (630-80372)LF5,800$70.37$70.37
190Traffic cone (630-80380)EACH50$11.40$11.40
191Impact attenuator (temporary) (630-85010)EACH6$11,444$11,444
CDOT contract C25826: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of May 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy