CDOT contract C25860 bid tabulation
This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structures D-19-O, D-19-P, D-20-B, and D-20-C on I-76. Please contact Dan Mattson at 970-218-2357 for all project related questions. Let by Colorado DOT on February 27, 2025, Weld, Region 4. 6 bids received; low bid $3,259,684 by Rodriguez Construction Org., LLC, +1.6% against the engineer's estimate of $3,209,332.
- Owner
- Colorado DOT
- Letting
- 27 FEB 2025
- Pay items
- 67
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rodriguez Construction Org., LLC | $3,259,684 | Low | +2.0% |
| 2 | Myers & Sons Construction, LLC | $3,631,310 | +11% | +13% |
| 3 | Abco Contracting, Inc. | $3,693,623 | +13% | +15% |
| 4 | Structures, Inc. | $3,799,919 | +17% | +18% |
| 5 | Zak Dirt Incorporated | $3,963,092 | +22% | +23% |
| 6 | HCG Construction LLC | $4,298,829 | +32% | +34% |
Engineer's estimate: $3,209,332.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Rodriguez Construction Org., LLC | 2. Myers & Sons Construction, LLC | 3. Abco Contracting, Inc. | 4. Structures, Inc. | 5. Zak Dirt Incorporated | 6. HCG Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $10,000 | $25,000 | $25,000 | $11,000 | $13,780 | $88,954 | $40,000 |
| 2 | Removal of embankment protector type 3 (202-00023) | EACH | 2 | $1,000.00 | $750.00 | $2,000.00 | $1,865.00 | $2,650.00 | $737.00 | $1,400.00 |
| 3 | Removal of delineator (202-00090) | EACH | 22 | $20.00 | $100.00 | $10.00 | $45.00 | $5.30 | $18.00 | $47.00 |
| 4 | Removal of concrete pavement (202-00210) | SY | 348 | $42.95 | $60.00 | $120.00 | $80.00 | $70.90 | $75.00 | $100.00 |
| 5 | Removal of asphalt mat (planing) (special) (202-00246) | SY | 5,778 | $20.61 | $19.00 | $15.00 | $24.00 | $32.48 | $20.70 | $34.00 |
| 6 | Removal of pavement marking (202-00250) | SF | 14,386 | $1.94 | $1.20 | $1.00 | $1.50 | $1.13 | $3.65 | $3.50 |
| 7 | Removal of bridge railing (202-00425) | LF | 760 | $25.00 | $110.00 | $30.00 | $40.00 | $30.33 | $70.00 | $50.00 |
| 8 | Removal of portions of present structure (class 2) (202-00453) | SY | 308 | $395.65 | $350.00 | $250.00 | $330.00 | $500.52 | $450.00 | $525.00 |
| 9 | Removal of portions of present structure (class 3) (202-00460) | SY | 66 | $741.96 | $600.00 | $400.00 | $835.00 | $692.37 | $750.00 | $3,250.00 |
| 10 | Removal of expansion device (202-00504) | LF | 760 | $238.63 | $135.00 | $90.00 | $225.00 | $387.57 | $100.00 | $300.00 |
| 11 | Removal of portions of present structure (202-00505) | SF | 1,661 | $163.90 | $115.00 | $205.00 | $115.00 | $127.17 | $70.00 | $180.00 |
| 12 | Removal of guardrail type 3 (202-01130) | LF | 1,430 | $11.00 | $20.00 | $15.00 | $19.00 | $18.87 | $19.90 | $10.00 |
| 13 | Embankment material (complete in place) (203-00060) | CY | 1,296 | $50.00 | $50.00 | $120.00 | $40.00 | $41.28 | $95.00 | $70.00 |
| 14 | Topsoil (onsite) (207-00700) | CY | 1,372 | $25.04 | $42.00 | $15.00 | $10.00 | $10.03 | $25.00 | $20.00 |
| 15 | Erosion log type 3 (12 inch) (208-00023) | LF | 1,800 | $8.11 | $6.00 | $6.45 | $8.00 | $10.53 | $9.60 | $8.00 |
| 16 | Aggregate bag (208-00035) | LF | 2,000 | $10.69 | $15.00 | $7.50 | $8.00 | $10.35 | $11.40 | $10.00 |
| 17 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 6 | $995.89 | $3,000.00 | $3,000.00 | $1,865.00 | $1,888.10 | $1,450.00 | $2,500.00 |
| 18 | Pre-fabricated vehicle tracking pad (208-00075) | EACH | 2 | $3,983.52 | $4,500.00 | $15,000 | $2,500.00 | $4,225.72 | $4,900.00 | $10,000 |
| 19 | Removal and disposal of sediment (labor) (208-00103) | HR | 80 | $69.65 | $115.00 | $45.00 | $55.00 | $50.40 | $60.00 | $80.00 |
| 20 | Removal and disposal of sediment (equipment) (208-00105) | HR | 24 | $148.61 | $150.00 | $100.00 | $170.00 | $107.13 | $139.00 | $160.00 |
| 21 | Sweeping (sediment removal) (208-00106) | HR | 104 | $147.42 | $105.00 | $150.00 | $300.00 | $116.30 | $225.00 | $250.00 |
| 22 | Removal of trash (208-00107) | HR | 10 | $107.99 | $110.00 | $45.00 | $75.00 | $132.90 | $60.00 | $80.00 |
| 23 | Erosion control management (208-00207) | DAY | 26 | $400.00 | $385.00 | $350.00 | $435.00 | $411.77 | $359.00 | $575.00 |
| 24 | Organic fertilizer (212-00700) | LB | 660 | $2.29 | $3.00 | $1.00 | $2.00 | $1.36 | $0.70 | $1.00 |
| 25 | Biotic soil amendments (hydraulically applied) (212-00702) | LB | 7,700 | $1.45 | $2.15 | $1.15 | $2.00 | $1.38 | $1.50 | $1.00 |
| 26 | Mycorrhizae (212-00704) | LB | 44 | $38.73 | $18.00 | $20.20 | $25.00 | $21.38 | $26.80 | $15.00 |
| 27 | Seeding (native) hydraulic (212-00707) | ACRE | 2.20 | $2,000.00 | $3,500.00 | $2,270.00 | $2,065.00 | $1,745.25 | $3,010.00 | $3,000.00 |
| 28 | Spray-on mulch blanket (213-00012) | ACRE | 3.20 | $6,331.43 | $3,800.00 | $4,160.00 | $5,340.00 | $4,542.76 | $5,510.00 | $4,000.00 |
| 29 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 253 | $300.00 | $315.00 | $206.00 | $260.00 | $214.12 | $518.00 | $400.00 |
| 30 | Hot mix asphalt (grading SX) (100) (PG 64- 28) (403-34851) | TON | 1,162 | $221.08 | $120.00 | $170.00 | $222.00 | $185.85 | $190.00 | $200.00 |
| 31 | Riprap (9 inch) (506-00209) | CY | 84 | $207.30 | $210.00 | $300.00 | $250.00 | $212.00 | $172.00 | $200.00 |
| 32 | Waterproofing (membrane) (515-00120) | SY | 5,778 | $28.26 | $28.00 | $20.50 | $19.00 | $26.30 | $31.00 | $26.00 |
| 33 | Bridge expansion joint (asphaltic plug) (518-01001) | LF | 624 | $293.88 | $320.00 | $185.00 | $247.00 | $344.12 | $357.00 | $315.00 |
| 34 | Bridge expansion device (0-4 inch) (518-01004) | LF | 120 | $405.98 | $380.00 | $780.00 | $670.00 | $900.77 | $850.00 | $1,500.00 |
| 35 | Concrete class DR (601-03057) | CY | 46 | $1,439.71 | $3,000.00 | $2,500.00 | $3,270.00 | $3,629.53 | $3,500.00 | $3,250.00 |
| 36 | Concrete (patching) (601-06102) | CF | 488 | $141.95 | $250.00 | $750.00 | $490.00 | $446.78 | $450.00 | $200.00 |
| 37 | Galvanic anodes (601-51005) | EACH | 1,870 | $26.33 | $40.00 | $30.00 | $24.00 | $37.36 | $35.00 | $60.00 |
| 38 | Reinforcing steel (602-00000) | LB | 2,382 | $3.22 | $6.00 | $3.00 | $4.00 | $2.26 | $7.50 | $12.00 |
| 39 | Guardrail type 3 (31 inch midwest guardrail system) (606-00302) | LF | 1,500 | $50.00 | $60.00 | $45.00 | $52.00 | $50.39 | $56.00 | $50.00 |
| 40 | Transition type 3G (606-01370) | EACH | 8 | $4,000.00 | $4,200.00 | $7,000.00 | $7,300.00 | $6,487.20 | $7,780.00 | $7,000.00 |
| 41 | Transition type BR10M-GR3 (606-01400) | EACH | 4 | $7,000.00 | $8,000.00 | $15,000 | $15,000 | $6,433.98 | $11,500 | $10,000 |
| 42 | End anchorage (nonflared) (606-02003) | EACH | 8 | $5,000.00 | $4,000.00 | $6,000.00 | $5,365.00 | $4,952.32 | $5,690.00 | $5,000.00 |
| 43 | Bridge rail type 10R MASH (606-11037) | LF | 760 | $250.00 | $350.00 | $303.00 | $349.00 | $305.30 | $370.00 | $300.00 |
| 44 | Delineator (type I) (612-00001) | EACH | 52 | $40.00 | $120.00 | $33.00 | $45.00 | $36.30 | $43.70 | $95.00 |
| 45 | Delineator (type III) (612-00003) | EACH | 16 | $40.00 | $120.00 | $35.00 | $48.00 | $38.50 | $46.40 | $95.00 |
| 46 | Field office (class 2) (620-00002) | EACH | 1 | $11,954 | $50,000 | $90,000 | $62,000 | $51,128 | $75,000 | $85,000 |
| 47 | Field laboratory (class 2) (620-00012) | EACH | 1 | $10,000 | $50,000 | $40,000 | $54,000 | $38,713 | $45,000 | $85,000 |
| 48 | Sanitary facility (620-00020) | EACH | 1 | $2,244.46 | $8,000.00 | $5,000.00 | $6,000.00 | $3,014.00 | $5,000.00 | $6,000.00 |
| 49 | Construction surveying (625-00000) | LS | 1 | $15,000 | $120,000 | $30,000 | $24,000 | $53,000 | $24,800 | $75,000 |
| 50 | Mobilization (626-00000) | LS | 1 | $299,776 | $200,000 | $360,000 | $330,000 | $339,555 | $390,000 | $285,000 |
| 51 | Modified epoxy pavement marking (627-00008) | GAL | 90 | $466.80 | $117.00 | $135.00 | $392.00 | $166.66 | $298.00 | $260.00 |
| 52 | Pavement marking paint (high build) (627-00013) | GAL | 68 | $144.60 | $118.00 | $65.00 | $110.00 | $84.49 | $212.00 | $185.00 |
| 53 | Flagging (630-00000) | HR | 300 | $50.00 | $55.00 | $50.00 | $65.00 | $42.40 | $35.80 | $40.00 |
| 54 | Traffic control inspection (630-00007) | DAY | 64 | $300.00 | $380.00 | $400.00 | $750.00 | $265.00 | $994.00 | $300.00 |
| 55 | Traffic control management (630-00012) | DAY | 125 | $1,600.00 | $450.00 | $1,200.00 | $1,870.00 | $1,229.60 | $1,190.00 | $1,000.00 |
| 56 | Flashing beacon (solar) (630-80002) | EACH | 2 | $670.20 | $415.00 | $400.00 | $3,700.00 | $530.00 | $265.00 | $2,800.00 |
| 57 | Barricade (type 3 M-A) (temporary) (630-80335) | EACH | 6 | $121.81 | $138.00 | $150.00 | $375.00 | $106.00 | $662.00 | $300.00 |
| 58 | Construction traffic sign (panel size A) (630-80341) | EACH | 20 | $150.00 | $75.00 | $40.00 | $125.00 | $53.00 | $132.00 | $125.00 |
| 59 | Construction traffic sign (panel size B) (630-80342) | EACH | 78 | $80.00 | $315.00 | $60.00 | $137.00 | $63.60 | $132.00 | $135.00 |
| 60 | Vertical panel (630-80350) | EACH | 30 | $70.00 | $42.00 | $40.00 | $94.00 | $26.50 | $132.00 | $60.00 |
| 61 | Portable message sign panel (630-80355) | EACH | 3 | $12,000 | $4,000.00 | $7,500.00 | $15,000 | $7,420.00 | $2,650.00 | $16,000 |
| 62 | Advance warning flashing or sequencing arrow panel (C type) (630-80358) | EACH | 2 | $1,143.89 | $1,650.00 | $2,500.00 | $8,400.00 | $3,180.00 | $2,650.00 | $7,500.00 |
| 63 | Drum channelizing device (630-80360) | EACH | 50 | $33.94 | $45.00 | $60.00 | $96.00 | $26.50 | $132.00 | $90.00 |
| 64 | Barrier (temporary) (630-80370) | LF | 2,000 | $42.06 | $60.00 | $65.00 | $64.00 | $53.00 | $75.70 | $40.00 |
| 65 | Traffic cone (630-80380) | EACH | 50 | $15.00 | $15.00 | $9.00 | $80.00 | $5.30 | $13.30 | $30.00 |
| 66 | Impact attenuator (temporary) (630-85010) | EACH | 2 | $24,698 | $25,000 | $10,000 | $7,000.00 | $8,800.00 | $11,900 | $15,000 |
| 67 | Impact attenuator (truck mounted attenuator) (temporary) (630-85040) | EACH | 2 | $16,665 | $25,000 | $30,000 | $5,600.00 | $53,000 | $19,900 | $55,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of February 27, 2025. Compiled by Mirage Metrics.