CDOT contract C26632 bid tabulation
Remove and replace bridge rail on SH157 MP3.518 D-16-DG AND I70 MP329.74 F-20-BF Remove and replace adjacent guardrail, remove and replace signing. For bidding questions call Chris Trujillo 303-810-2814. Let by Colorado DOT on August 21, 2025, Arapahoe and Boulder, Region 4. 4 bids received; low bid $612,588 by Abco Contracting, Inc., -21% against the engineer's estimate of $774,235.
- Owner
- Colorado DOT
- Letting
- 21 AUG 2025
- Pay items
- 40
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Abco Contracting, Inc. | $612,588 | Low | -21% |
| 2 | Myers & Sons Construction, LLC | $647,466 | +6.0% | -16% |
| 3 | Lobato Construction, LLC | $675,000 | +10% | -13% |
| 4 | Structures, Inc. | $769,712 | +26% | -1.0% |
Engineer's estimate: $774,235.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Abco Contracting, Inc. | 2. Myers & Sons Construction, LLC | 3. Lobato Construction, LLC | 4. Structures, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removal of delineator (202-00090) | EACH | 10 | $19.08 | $24.00 | $20.00 | $20.00 | $20.66 |
| 2 | Removal of bridge railing (202-00425) | LF | 877 | $110.00 | $24.00 | $15.00 | $30.00 | $36.19 |
| 3 | Removal of portions of present structure (202-00505) | SF | 15 | $805.84 | $140.00 | $500.00 | $200.00 | $735.97 |
| 4 | Removal of ground sign (202-00810) | EACH | 6 | $195.70 | $295.00 | $250.00 | $250.00 | $210.05 |
| 5 | Removal of guardrail type 3 (202-01130) | LF | 413 | $9.32 | $10.00 | $17.00 | $15.00 | $14.68 |
| 6 | Removal of guardrail thrie beam (202-01135) | LF | 19 | $20.82 | $25.00 | $30.00 | $25.00 | $53.70 |
| 7 | Removal of end anchorage (202-01300) | EACH | 1 | $612.60 | $295.00 | $300.00 | $1,500.00 | $825.00 |
| 8 | Aggregate bag (208-00035) | LF | 125 | $15.69 | $17.00 | $15.00 | $15.00 | $22.36 |
| 9 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 2 | $1,378.44 | $600.00 | $3,500.00 | $2,500.00 | $3,146.14 |
| 10 | Removal and disposal of sediment (labor) (208-00103) | HR | 2 | $87.40 | $100.00 | $100.00 | $175.00 | $117.86 |
| 11 | Sweeping (sediment removal) (208-00106) | HR | 4 | $212.70 | $175.00 | $250.00 | $500.00 | $164.64 |
| 12 | Removal of trash (208-00107) | HR | 1 | $142.45 | $75.00 | $100.00 | $175.00 | $286.98 |
| 13 | Removal of nests (240-00010) | HR | 4 | $189.74 | $450.00 | $150.00 | $500.00 | $562.41 |
| 14 | Concrete (patching) (601-06150) | SF | 15 | $390.57 | $285.00 | $800.00 | $750.00 | $894.25 |
| 15 | Reinforcing steel (602-00000) | LB | 17 | $5.49 | $100.00 | $15.00 | $75.00 | $7.47 |
| 16 | Guardrail type 3 (31 inch midwest guardrail system) (606-00302) | LF | 313 | $95.48 | $45.00 | $45.00 | $50.00 | $96.17 |
| 17 | Transition type 3G (606-01370) | EACH | 5 | $5,524.61 | $4,300.00 | $5,500.00 | $4,000.00 | $4,218.50 |
| 18 | Transition type BR10M-GR3 (606-01400) | EACH | 5 | $6,630.94 | $3,945.00 | $5,000.00 | $10,000 | $5,585.86 |
| 19 | End anchorage (flared) (606-02005) | EACH | 1 | $4,240.76 | $4,500.00 | $4,500.00 | $4,000.00 | $4,757.50 |
| 20 | Bridge rail type 10R MASH (606-11037) | LF | 853 | $406.00 | $330.00 | $350.00 | $375.00 | $450.47 |
| 21 | Delineator (type I) (612-00001) | EACH | 12 | $37.60 | $54.00 | $50.00 | $50.00 | $69.89 |
| 22 | Delineator (type III) (612-00003) | EACH | 7 | $50.76 | $54.00 | $50.00 | $50.00 | $72.35 |
| 23 | Sign panel (class I) (614-00011) | SF | 3 | $36.94 | $35.00 | $35.00 | $30.00 | $95.95 |
| 24 | Sign panel (class II) (614-00012) | SF | 116 | $35.15 | $48.00 | $45.00 | $40.00 | $50.52 |
| 25 | Steel sign support (2-inch round)(post) (614-01512) | LF | 12 | $15.54 | $21.00 | $20.00 | $20.00 | $42.16 |
| 26 | Steel sign support (2-inch round)(socket) (614-01522) | EACH | 2 | $228.01 | $130.00 | $100.00 | $125.00 | $399.65 |
| 27 | Steel sign support (2-1/2 inch round NP- 40)(post) (614-01575) | LF | 119 | $35.00 | $33.00 | $30.00 | $30.00 | $39.70 |
| 28 | Steel sign support (2-1/2 inch round NP- 40)(slipbase) (614-01578) | EACH | 9 | $376.51 | $325.00 | $280.00 | $300.00 | $491.90 |
| 29 | Sanitary facility (620-00020) | EACH | 1 | $1,965.51 | $125.00 | $6,500.00 | $5,000.00 | $2,103.30 |
| 30 | Mobilization (626-00000) | LS | 1 | $68,753 | $69,000 | $64,000 | $65,000 | $105,099 |
| 31 | Public information services (tier IV) (626-01104) | LS | 1 | $15,000 | $4,435.00 | $5,000.00 | $6,760.00 | $5,500.00 |
| 32 | Traffic control inspection (630-00007) | DAY | 18 | $126.03 | $470.00 | $415.00 | $150.00 | $137.50 |
| 33 | Traffic control management (630-00012) | DAY | 35 | $1,100.00 | $1,540.00 | $1,450.00 | $1,100.00 | $1,155.00 |
| 34 | Construction traffic sign (panel size A) (630-80341) | EACH | 5 | $46.72 | $35.00 | $30.00 | $60.00 | $60.50 |
| 35 | Construction traffic sign (panel size B) (630-80342) | EACH | 11 | $60.28 | $47.00 | $45.00 | $70.00 | $71.50 |
| 36 | Vertical panel (630-80350) | EACH | 12 | $31.03 | $35.00 | $30.00 | $25.00 | $27.50 |
| 37 | Advance warning flashing or sequencing arrow panel (B type) (630-80357) | EACH | 1 | $1,052.82 | $1,180.00 | $1,000.00 | $3,000.00 | $3,300.00 |
| 38 | Drum channelizing device (630-80360) | EACH | 5 | $28.08 | $47.00 | $30.00 | $60.00 | $66.00 |
| 39 | Barrier (temporary) (630-80370) | LF | 523 | $95.00 | $115.00 | $125.00 | $100.00 | $65.28 |
| 40 | Impact attenuator (temporary) (630-85010) | EACH | 3 | $4,604.40 | $5,500.00 | $3,500.00 | $5,000.00 | $3,542.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of August 21, 2025. Compiled by Mirage Metrics.