CDOT contract C25525 bid tabulation
VARIOUS LOCATIONS THROUGHOUT R4. Let by Colorado DOT on August 14, 2025, Boulder, Region 4. 4 bids received; low bid $2,394,994 by Goodland Construction, Inc., +4.1% against the engineer's estimate of $2,299,720.
- Owner
- Colorado DOT
- Letting
- 14 AUG 2025
- Pay items
- 61
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Goodland Construction, Inc. | $2,394,994 | Low | +4.0% |
| 2 | Chato'S Concrete, LLC | $2,541,677 | +6.0% | +11% |
| 3 | Noraa Concrete Construction Corporation | $3,158,581 | +32% | +37% |
| 4 | Morton Electric, Inc. | $4,019,196 | +68% | +75% |
Engineer's estimate: $2,299,720.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Goodland Construction, Inc. | 2. Chato'S Concrete, LLC | 3. Noraa Concrete Construction Corporation | 4. Morton Electric, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removal of bollard (202-00039) | EACH | 62 | $67.40 | $233.00 | $250.00 | $400.00 | $770.00 |
| 2 | Removal of delineator (202-00090) | EACH | 40 | $15.03 | $46.00 | $300.00 | $69.00 | $205.00 |
| 3 | Removal of concrete median cover material (202-00190) | SY | 462 | $16.52 | $11.70 | $22.00 | $29.00 | $34.00 |
| 4 | Removal of sidewalk (202-00200) | SY | 1,323 | $17.79 | $36.00 | $16.00 | $29.00 | $35.00 |
| 5 | Removal of curb (202-00201) | LF | 47 | $24.18 | $15.10 | $15.00 | $12.00 | $15.00 |
| 6 | Removal of curb and gutter (202-00203) | LF | 1,620 | $9.88 | $15.10 | $15.00 | $14.00 | $18.00 |
| 7 | Removal of concrete curb ramp (202-00206) | SY | 3,033 | $35.00 | $36.00 | $19.00 | $47.00 | $33.00 |
| 8 | Removal of brick pavers (202-00207) | SY | 6 | $39.57 | $36.00 | $25.00 | $158.00 | $73.00 |
| 9 | Removal of concrete pavement (202-00210) | SY | 193 | $40.30 | $45.90 | $20.00 | $50.00 | $39.00 |
| 10 | Removal of asphalt mat (202-00220) | SY | 816 | $51.01 | $32.40 | $20.00 | $20.00 | $44.00 |
| 11 | Removal of pavement marking (202-00250) | SF | 326 | $4.90 | $7.40 | $10.00 | $5.00 | $31.00 |
| 12 | Removal of pull box (202-00827) | EACH | 47 | $325.88 | $284.00 | $320.00 | $345.00 | $1,007.00 |
| 13 | Removal of pedestrian push button (202-00860) | EACH | 44 | $89.34 | $103.00 | $115.00 | $124.00 | $920.00 |
| 14 | Unsuitable material (203-00050) | CY | 100 | $69.80 | $119.50 | $95.00 | $127.00 | $280.00 |
| 15 | Potholing (203-01597) | HR | 40 | $320.48 | $370.00 | $600.00 | $458.00 | $445.00 |
| 16 | Erosion control (curb ramp) (208-00090) | EACH | 150 | $421.34 | $184.00 | $500.00 | $422.00 | $1,100.00 |
| 17 | Reset structure (210-00001) | EACH | 1 | $4,730.78 | $6,253.00 | $3,000.00 | $790.00 | $5,000.00 |
| 18 | Reset ground sign (210-00810) | EACH | 27 | $409.37 | $398.00 | $250.00 | $545.00 | $560.00 |
| 19 | Reset pedestrian push button (210-00860) | EACH | 3 | $213.67 | $387.00 | $436.00 | $470.00 | $580.00 |
| 20 | Grinding: slope correction (210-02806) | SF | 63 | $120.00 | $13.70 | $100.00 | $35.00 | $251.00 |
| 21 | Adjust manhole (210-04010) | EACH | 4 | $1,081.28 | $1,005.00 | $900.00 | $3,144.00 | $4,195.00 |
| 22 | Adjust valve box (210-04050) | EACH | 10 | $459.50 | $938.00 | $600.00 | $425.00 | $1,027.00 |
| 23 | Landscape restoration (212-01200) | LS | 1 | $35,000 | $15,909 | $95,000 | $10,360 | $165,000 |
| 24 | Aggregate base course (class 6) (304-06000) | TON | 1,662 | $60.00 | $69.50 | $50.00 | $80.00 | $78.00 |
| 25 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 448 | $247.49 | $282.00 | $200.00 | $338.00 | $402.00 |
| 26 | Concrete pavement (patching) (412-00190) | SY | 207 | $144.42 | $250.00 | $250.00 | $227.00 | $195.00 |
| 27 | Concrete sidewalk (608-00000) | SY | 1,331 | $70.10 | $114.50 | $89.00 | $93.00 | $152.00 |
| 28 | Concrete curb ramp (608-00010) | SY | 2,939 | $205.00 | $169.20 | $134.00 | $210.00 | $291.00 |
| 29 | Directional indicator strip (608-00013) | SF | 87 | $90.00 | $17.10 | $25.00 | $73.00 | $180.00 |
| 30 | Curb type 2 (section B) (609-20010) | LF | 474 | $42.43 | $28.10 | $43.00 | $30.00 | $46.00 |
| 31 | Curb and gutter type 2 (section I-B) (609-21010) | LF | 580 | $36.72 | $46.70 | $44.00 | $37.00 | $7.00 |
| 32 | Curb and gutter type 2 (section II-B) (609-21020) | LF | 1,269 | $39.08 | $51.40 | $43.00 | $39.00 | $51.00 |
| 33 | Median cover material (patterned concrete) (610-00020) | SF | 266 | $23.58 | $23.65 | $24.00 | $20.00 | $28.00 |
| 34 | Median cover material (concrete) (610-00030) | SF | 4,655 | $13.59 | $21.38 | $20.00 | $16.00 | $22.00 |
| 35 | Delineator (flexible) (type I) (612-00041) | EACH | 45 | $129.53 | $171.00 | $250.00 | $123.00 | $303.00 |
| 36 | 2 inch electrical conduit (613-00200) | LF | 891 | $17.19 | $28.50 | $32.00 | $35.00 | $81.00 |
| 37 | Type one pull box (613-07001) | EACH | 5 | $987.04 | $1,802.00 | $2,030.00 | $2,189.00 | $2,007.00 |
| 38 | Type two pull box (613-07002) | EACH | 26 | $1,265.70 | $1,722.00 | $1,940.00 | $2,092.00 | $2,237.00 |
| 39 | Type three pull box (613-07003) | EACH | 14 | $1,629.47 | $2,103.00 | $2,370.00 | $2,556.00 | $2,872.00 |
| 40 | Type four pull box (613-07004) | EACH | 2 | $1,989.76 | $2,836.00 | $3,200.00 | $3,447.00 | $3,859.00 |
| 41 | Accessible pedestrian signal (614-70200) | EACH | 43 | $3,000.00 | $2,374.00 | $2,400.00 | $2,583.00 | $1,904.00 |
| 42 | Pedestrian push button post assembly (614-72863) | EACH | 43 | $2,500.00 | $3,300.00 | $3,440.00 | $3,709.00 | $1,784.00 |
| 43 | Sanitary facility (620-00020) | EACH | 1 | $3,338.02 | $3,978.00 | $3,000.00 | $3,315.00 | $7,900.00 |
| 44 | Bollard (622-00270) | EACH | 51 | $1,158.40 | $1,875.00 | $5,000.00 | $4,267.00 | $3,500.00 |
| 45 | Construction surveying (625-00000) | LS | 1 | $12,000 | $28,410 | $145,000 | $162,858 | $141,500 |
| 46 | Mobilization (626-00000) | LS | 1 | $170,410 | $163,000 | $100,000 | $349,500 | $541,000 |
| 47 | Public information management (tier IV) (626-01114) | DAY | 1 | $94.86 | $285.00 | $15,000 | $159.00 | $9,600.00 |
| 48 | Modified epoxy pavement marking (627-00008) | GAL | 3 | $733.77 | $569.00 | $480.00 | $380.00 | $4,560.00 |
| 49 | Preformed thermoplastic pavement marking (xwalk-stop line) (627-30410) | SF | 730 | $18.82 | $29.00 | $25.00 | $24.00 | $39.00 |
| 50 | Flagging (630-00000) | HR | 500 | $37.39 | $40.00 | $50.00 | $48.00 | $42.00 |
| 51 | Traffic control inspection (630-00007) | DAY | 45 | $600.00 | $228.00 | $300.00 | $414.00 | $360.00 |
| 52 | Traffic control management (630-00012) | DAY | 100 | $1,300.00 | $825.00 | $1,120.00 | $1,520.00 | $1,320.00 |
| 53 | Pedestrian barricade (ADA) (630-80340) | LF | 100 | $39.44 | $29.00 | $30.00 | $49.00 | $42.00 |
| 54 | Construction traffic sign (panel size A) (630-80341) | EACH | 44 | $49.26 | $69.00 | $105.00 | $69.00 | $60.00 |
| 55 | Construction traffic sign (panel size B) (630-80342) | EACH | 4 | $60.28 | $80.00 | $135.00 | $69.00 | $60.00 |
| 56 | Vertical panel (630-80350) | EACH | 30 | $45.99 | $40.00 | $60.00 | $48.00 | $42.00 |
| 57 | Portable message sign panel (630-80355) | EACH | 2 | $5,105.60 | $4,546.00 | $4,000.00 | $9,669.00 | $8,400.00 |
| 58 | Advance warning flashing or sequencing arrow panel (C type) (630-80358) | EACH | 2 | $1,148.60 | $1,705.00 | $3,000.00 | $4,144.00 | $3,600.00 |
| 59 | Drum channelizing device (630-80360) | EACH | 60 | $75.00 | $86.00 | $150.00 | $49.00 | $42.00 |
| 60 | Traffic cone (630-80380) | EACH | 100 | $8.55 | $6.00 | $50.00 | $7.00 | $100.00 |
| 61 | Mobile attenuator (630-85020) | EACH | 1 | $30,000 | $58,000 | $70,000 | $76,000 | $70,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of August 14, 2025. Compiled by Mirage Metrics.