Brannan Sand and Gravel, LLC: CDOT bid record

Brannan Sand and Gravel, LLC submitted 12 bids on Colorado DOT contracts in the data, from 09 MAY 2024 to 24 JUL 2025, and was the low bidder on 5 of them (42%). When it was not low, its total sat a median +17% above the low bid.

Owner
Colorado DOT
Low bid volume
$36,124,905
Latest bid
24 JUL 2025
Data through
10 SEP 2026
12Bids
5Low bids
42Win rate, percent
+17%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20246233%
20256350%
Brannan Sand and Gravel, LLC, CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 18338%
Region 43133%
Region 211100%
Brannan Sand and Gravel, LLC, CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Removal of asphalt mat (planing)202-00240SY103 (30%)$3.37$6.00
Hot mix asphalt (patching) (asphalt)403-00720TON93 (33%)$290.00$350.00
Clean inlet202-04010EACH73 (43%)$1,170.00$1,584.80
Delineator (flexible) (type I)612-00041EACH73 (43%)$82.00$94.50
Traffic control inspection630-00007DAY102 (20%)$337.50$350.00
Potholing203-01597HR92 (22%)$400.00$350.00
Reinforcing steel602-00000LB62 (33%)$5.95$5.22
Curb and gutter type 2 (section II-B)609-21020LF52 (40%)$53.00$54.00
Removal of asphalt mat (planing) (special)202-00246SY52 (40%)$21.40$25.00
Traffic control management630-00012DAY101 (10%)$1,815.00$1,500.00
Removal of asphalt mat202-00220SY101 (10%)$34.41$20.50
Drum channelizing device630-80360EACH91 (11%)$55.00$44.00
Brannan Sand and Gravel, LLC, CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Martin Marietta Materials, Inc.94 of 9
Oldcastle SW Group, Inc.72 of 7
Asphalt Specialties Co., Inc.53 of 5
Kiewit Infrastructure Co.40 of 4
Holcim -WCR, Inc. Aggregate Industries - WCR, Inc.21 of 2
AB Underground11 of 1
Rodriguez Construction Org., LLC10 of 1
Kilgore Companies, LLC dba Elam Construction11 of 1
Brannan Sand and Gravel, LLC, CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
24 JUL 2025C27031Region 1I-70 EISENHOWER-JOHNSON MEMORIAL TUNNEL, RIGHT LANE OVERLAY AND STRIPING, MM 213.5 TO MM 215.71 of 1$2,769,130Low
03 APR 2025C26489Region 4CO119 AND CO 7 FROM US36 (28TH ST) TO BOULDER1 of 1$4,654,490Low
27 MAR 2025C23177Region 1US 40 - EMPIRE JUNCTION TO BERTHOD PASS BEGINNING AT M.P. 252 AND EXTENDING TO M.P. 258.3. THIS PROJECT CONSISTS OF REMOVING 2.5" OF EXISTIN4 of 4$17,686,997+50%
20 MAR 2025C23369Region 1US 85 FROM I-76 TO 124TH AVENUE Resurfacing project on US85 from I-76 to 124th Avenue. It also includes median work at 120th Avenue.2 of 3$7,310,7030.0%
20 FEB 2025C26314Region 4Project 26314 is in Boulder County on CO7 between 28th St (MP 52.3) to Cherryvale Rd (MP 55.5) and includes the following major operations: 3 of 4$10,233,633+27%
09 JAN 2025C23780Region 1US287:RESURFACING I-70 TO 92ND AVE1 of 3$12,912,912Low, 5.0% under the second
19 DEC 2024C19934Region 1US85 SANTA FE FLORIDA TO I-251 of 6$3,298,574Low, 8.0% under the second
12 DEC 2024C25806Region 1This is a resurfacing project for I-25 from Alameda Ave (MP 208.063) to 44th Ave (MP 213.45) in the city and county of Denver. the scope of 2 of 3$27,835,399+26%
21 NOV 2024C25095Region 2US 285 FROM MP 220-228.81 of 3$12,489,800Low, 6.0% under the second
31 OCT 2024C23509Region 4This is primarily a resurfacing project on CO 52 from MP 54.58 to MP 60.87. Work also included in this project is shoulder widening (MP 47.93 of 5$5,872,057+13%
06 JUN 2024C22601Region 1This is a resurfacing project on SH7, from I-25 to US85. It also includes ADA Curb Ramps, new Traffic Signals at the Holly Intersection, and2 of 4$10,261,959+15%
09 MAY 2024C24417SRegion 1Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and 3 of 5$40,648,531+17%
Brannan Sand and Gravel, LLC: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy