Brannan Sand and Gravel, LLC: CDOT bid record
Brannan Sand and Gravel, LLC submitted 12 bids on Colorado DOT contracts in the data, from 09 MAY 2024 to 24 JUL 2025, and was the low bidder on 5 of them (42%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $36,124,905
- Latest bid
- 24 JUL 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 6 | 2 | 33% |
| 2025 | 6 | 3 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 1 | 8 | 3 | 38% |
| Region 4 | 3 | 1 | 33% |
| Region 2 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removal of asphalt mat (planing) | 202-00240 | SY | 10 | 3 (30%) | $3.37 | $6.00 |
| Hot mix asphalt (patching) (asphalt) | 403-00720 | TON | 9 | 3 (33%) | $290.00 | $350.00 |
| Clean inlet | 202-04010 | EACH | 7 | 3 (43%) | $1,170.00 | $1,584.80 |
| Delineator (flexible) (type I) | 612-00041 | EACH | 7 | 3 (43%) | $82.00 | $94.50 |
| Traffic control inspection | 630-00007 | DAY | 10 | 2 (20%) | $337.50 | $350.00 |
| Potholing | 203-01597 | HR | 9 | 2 (22%) | $400.00 | $350.00 |
| Reinforcing steel | 602-00000 | LB | 6 | 2 (33%) | $5.95 | $5.22 |
| Curb and gutter type 2 (section II-B) | 609-21020 | LF | 5 | 2 (40%) | $53.00 | $54.00 |
| Removal of asphalt mat (planing) (special) | 202-00246 | SY | 5 | 2 (40%) | $21.40 | $25.00 |
| Traffic control management | 630-00012 | DAY | 10 | 1 (10%) | $1,815.00 | $1,500.00 |
| Removal of asphalt mat | 202-00220 | SY | 10 | 1 (10%) | $34.41 | $20.50 |
| Drum channelizing device | 630-80360 | EACH | 9 | 1 (11%) | $55.00 | $44.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Martin Marietta Materials, Inc. | 9 | 4 of 9 |
| Oldcastle SW Group, Inc. | 7 | 2 of 7 |
| Asphalt Specialties Co., Inc. | 5 | 3 of 5 |
| Kiewit Infrastructure Co. | 4 | 0 of 4 |
| Holcim -WCR, Inc. Aggregate Industries - WCR, Inc. | 2 | 1 of 2 |
| AB Underground | 1 | 1 of 1 |
| Rodriguez Construction Org., LLC | 1 | 0 of 1 |
| Kilgore Companies, LLC dba Elam Construction | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 JUL 2025 | C27031 | Region 1 | I-70 EISENHOWER-JOHNSON MEMORIAL TUNNEL, RIGHT LANE OVERLAY AND STRIPING, MM 213.5 TO MM 215.7 | 1 of 1 | $2,769,130 | Low |
| 03 APR 2025 | C26489 | Region 4 | CO119 AND CO 7 FROM US36 (28TH ST) TO BOULDER | 1 of 1 | $4,654,490 | Low |
| 27 MAR 2025 | C23177 | Region 1 | US 40 - EMPIRE JUNCTION TO BERTHOD PASS BEGINNING AT M.P. 252 AND EXTENDING TO M.P. 258.3. THIS PROJECT CONSISTS OF REMOVING 2.5" OF EXISTIN | 4 of 4 | $17,686,997 | +50% |
| 20 MAR 2025 | C23369 | Region 1 | US 85 FROM I-76 TO 124TH AVENUE Resurfacing project on US85 from I-76 to 124th Avenue. It also includes median work at 120th Avenue. | 2 of 3 | $7,310,703 | 0.0% |
| 20 FEB 2025 | C26314 | Region 4 | Project 26314 is in Boulder County on CO7 between 28th St (MP 52.3) to Cherryvale Rd (MP 55.5) and includes the following major operations: | 3 of 4 | $10,233,633 | +27% |
| 09 JAN 2025 | C23780 | Region 1 | US287:RESURFACING I-70 TO 92ND AVE | 1 of 3 | $12,912,912 | Low, 5.0% under the second |
| 19 DEC 2024 | C19934 | Region 1 | US85 SANTA FE FLORIDA TO I-25 | 1 of 6 | $3,298,574 | Low, 8.0% under the second |
| 12 DEC 2024 | C25806 | Region 1 | This is a resurfacing project for I-25 from Alameda Ave (MP 208.063) to 44th Ave (MP 213.45) in the city and county of Denver. the scope of | 2 of 3 | $27,835,399 | +26% |
| 21 NOV 2024 | C25095 | Region 2 | US 285 FROM MP 220-228.8 | 1 of 3 | $12,489,800 | Low, 6.0% under the second |
| 31 OCT 2024 | C23509 | Region 4 | This is primarily a resurfacing project on CO 52 from MP 54.58 to MP 60.87. Work also included in this project is shoulder widening (MP 47.9 | 3 of 5 | $5,872,057 | +13% |
| 06 JUN 2024 | C22601 | Region 1 | This is a resurfacing project on SH7, from I-25 to US85. It also includes ADA Curb Ramps, new Traffic Signals at the Holly Intersection, and | 2 of 4 | $10,261,959 | +15% |
| 09 MAY 2024 | C24417S | Region 1 | Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and | 3 of 5 | $40,648,531 | +17% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.