US287:RESURFACING I-70 TO 92ND AVE. Let by Colorado DOT on January 9, 2025, Region 1. 3 bids received; low bid $12,912,912 by Brannan Sand and Gravel, LLC, -3.0% against the engineer's estimate of $13,317,000.
- Owner
- Colorado DOT
- Letting
- 09 JAN 2025
- Pay items
- 163
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Brannan Sand and Gravel, LLC | $12,912,912 | Low | -3.0% |
| 2 | Oldcastle SW Group, Inc. | $13,577,597 | +5.0% | +2.0% |
| 3 | Martin Marietta Materials, Inc. | $13,968,532 | +8.0% | +5.0% |
Engineer's estimate: $13,317,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Brannan Sand and Gravel, LLC | 2. Oldcastle SW Group, Inc. | 3. Martin Marietta Materials, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $20,000 | $12,000 | $3,230.75 | $3,722.53 |
| 2 | Removal of bollard (202-00039) | EACH | 2 | $700.00 | $1,115.00 | $536.39 | $275.10 |
| 3 | Removal of delineator (202-00090) | EACH | 52 | $40.00 | $14.00 | $13.01 | $14.67 |
| 4 | Removal of concrete median cover material (202-00190) | SY | 14 | $72.00 | $38.85 | $35.40 | $40.95 |
| 5 | Removal of sidewalk (202-00200) | SY | 1,578 | $25.00 | $35.32 | $32.18 | $37.23 |
| 6 | Removal of curb (202-00201) | LF | 500 | $12.90 | $14.13 | $12.87 | $14.89 |
| 7 | Removal of curb and gutter (202-00203) | LF | 3,331 | $16.00 | $15.30 | $13.95 | $16.13 |
| 8 | Removal of concrete pavement (202-00210) | SY | 377 | $50.00 | $38.85 | $35.40 | $40.95 |
| 9 | Removal of asphalt mat (202-00220) | SY | 202 | $45.00 | $35.32 | $33.05 | $43.81 |
| 10 | Removal of asphalt mat (planing) (202-00240) | SY | 250,763 | $3.00 | $2.42 | $4.43 | $3.02 |
| 11 | Removal of asphalt mat (planing) (special) (202-00246) | SY | 1,568 | $18.00 | $21.40 | $14.82 | $15.07 |
| 12 | Removal of portions of present structure (class 2) (202-00453) | SY | 78 | $500.00 | $670.00 | $657.91 | $696.93 |
| 13 | Removal of portions of present structure (class 3) (202-00460) | SY | 16 | $1,200.00 | $1,330.00 | $1,304.28 | $1,381.63 |
| 14 | Removal of portions of present structure (202-00505) | SF | 26 | $700.00 | $212.00 | $207.76 | $220.08 |
| 15 | Removal of ground sign (202-00810) | EACH | 96 | $100.00 | $295.00 | $271.05 | $305.67 |
| 16 | Removal of sign panel (202-00821) | EACH | 8 | $150.00 | $176.00 | $162.63 | $181.59 |
| 17 | Removal of traffic signal equipment (202-00828) | LS | 1 | $30,000 | $45,600 | $60,126 | $67,793 |
| 18 | Removal of traffic signal head (202-00831) | EACH | 37 | $120.00 | $275.00 | $150.32 | $169.48 |
| 19 | Removal of pedestrian push button (202-00860) | EACH | 13 | $150.00 | $110.00 | $75.16 | $84.74 |
| 20 | Removal of fence (202-01000) | LF | 22 | $25.00 | $88.30 | $215.05 | $30.26 |
| 21 | Clean valve box (202-04005) | EACH | 50 | $100.00 | $420.00 | $737.94 | $393.44 |
| 22 | Clean inlet (202-04010) | EACH | 127 | $300.00 | $1,170.00 | $1,024.85 | $1,204.53 |
| 23 | Clean expansion joint (202-04050) | LF | 166 | $30.00 | $99.00 | $54.67 | $183.40 |
| 24 | Unclassified excavation (complete in place) (203-00010) | CY | 2,320 | $25.00 | $74.00 | $35.54 | $40.95 |
| 25 | Unsuitable material (203-00050) | CY | 109 | $115.00 | $190.00 | $107.69 | $173.72 |
| 26 | Potholing (203-01597) | HR | 100 | $298.14 | $420.00 | $530.93 | $393.44 |
| 27 | Topsoil (onsite) (207-00700) | CY | 850 | $20.00 | $64.75 | $12.92 | $14.89 |
| 28 | Erosion log type 1 (12 inch) (208-00002) | LF | 575 | $7.35 | $8.20 | $7.23 | $6.40 |
| 29 | Silt fence (208-00020) | LF | 1,260 | $1.96 | $3.35 | $2.97 | $2.87 |
| 30 | Aggregate bag (208-00035) | LF | 84 | $14.13 | $12.50 | $11.10 | $11.83 |
| 31 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 4 | $1,805.77 | $2,095.00 | $1,851.92 | $3,846.62 |
| 32 | Storm drain inlet protection (type II) (208-00054) | EACH | 32 | $243.56 | $335.00 | $296.52 | $233.28 |
| 33 | Rigid inlet protection device (208-00055) | EACH | 22 | $420.48 | $305.00 | $270.51 | $405.54 |
| 34 | Pre-fabricated vehicle tracking pad (208-00075) | EACH | 2 | $3,678.07 | $4,800.00 | $4,317.68 | $2,440.19 |
| 35 | Removal and disposal of sediment (labor) (208-00103) | HR | 40 | $78.84 | $82.40 | $72.83 | $95.32 |
| 36 | Removal and disposal of sediment (equipment) (208-00105) | HR | 40 | $154.81 | $163.30 | $144.36 | $141.46 |
| 37 | Sweeping (sediment removal) (208-00106) | HR | 40 | $148.41 | $187.00 | $317.94 | $213.10 |
| 38 | Removal of trash (208-00107) | HR | 20 | $144.11 | $94.00 | $83.23 | $208.65 |
| 39 | Erosion control management (208-00207) | DAY | 200 | $330.59 | $388.50 | $343.33 | $424.09 |
| 40 | Reset monument (type 3A) (210-00065) | EACH | 21 | $700.00 | $465.00 | $804.59 | $1,761.39 |
| 41 | Reset radio communication antenna (210-00479) | EACH | 1 | $900.00 | $1,250.00 | $912.63 | $1,029.00 |
| 42 | Reset sign panel (210-00815) | EACH | 20 | $130.00 | $210.00 | $332.84 | $375.28 |
| 43 | Reset pull box (210-00827) | EACH | 20 | $1,095.19 | $1,750.00 | $697.89 | $786.88 |
| 44 | Reset fire preemption unit and timer (210-00866) | EACH | 6 | $600.00 | $1,470.00 | $1,073.68 | $1,210.59 |
| 45 | Portable pan-tilt-zoom camera (reset) (210-00892) | EACH | 4 | $1,500.00 | $1,470.00 | $1,073.68 | $1,210.59 |
| 46 | Adjust manhole (210-04010) | EACH | 72 | $1,200.00 | $695.00 | $1,342.42 | $1,004.04 |
| 47 | Adjust valve box (210-04050) | EACH | 100 | $550.00 | $375.00 | $744.58 | $333.33 |
| 48 | Organic fertilizer (212-00700) | LB | 200 | $1.43 | $3.70 | $3.31 | $2.40 |
| 49 | Compost (mechanically applied) (212-00701) | CY | 131 | $56.74 | $89.00 | $79.42 | $68.37 |
| 50 | Humate (212-00703) | LB | 151 | $2.35 | $2.70 | $2.39 | $3.03 |
| 51 | Mycorrhizae (212-00704) | LB | 11 | $17.80 | $30.50 | $26.96 | $35.00 |
| 52 | Seeding (native) drill (212-00706) | ACRE | 0.75 | $2,508.99 | $3,375.00 | $2,982.50 | $1,704.50 |
| 53 | Seeding (native) broadcast (212-00708) | ACRE | 0.25 | $4,698.23 | $4,330.00 | $3,828.69 | $5,792.64 |
| 54 | Mulching (weed free) (213-00003) | ACRE | 0.75 | $2,387.26 | $3,765.00 | $3,329.29 | $1,759.57 |
| 55 | Mulch tackifier (213-00061) | LB | 150 | $6.70 | $5.10 | $4.58 | $6.34 |
| 56 | Extended landscape preservation (214-00008) | LS | 1 | $17,000 | $89,000 | $78,188 | $5,568.67 |
| 57 | Soil retention blanket (straw-coconut) (biodegradable class 1) (216-00201) | SY | 1,210 | $5.09 | $5.00 | $4.48 | $4.08 |
| 58 | Wildlife biologist (240-00000) | HR | 40 | $143.90 | $215.00 | $210.53 | $193.69 |
| 59 | Removal of nests (240-00010) | HR | 40 | $156.28 | $215.00 | $210.53 | $381.33 |
| 60 | Aggregate base course (class 6) (304-06000) | TON | 807 | $65.00 | $115.00 | $47.38 | $117.04 |
| 61 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 400 | $300.00 | $190.00 | $259.38 | $373.71 |
| 62 | Hot mix asphalt (grading SX) (100) (PG 76- 28) 00 80 72 (403-34871) | TON | 38,248 | $120.00 | $84.60 | $121.39 | $113.65 |
| 63 | Joint sealant (408-01100) | LF | 514 | $25.00 | $53.00 | $49.21 | $27.06 |
| 64 | Emulsified asphalt (slow-setting) (411-10255) | GAL | 12,546 | $4.00 | $5.30 | $4.12 | $4.24 |
| 65 | Concrete pavement (patching) (412-00190) | SY | 317 | $350.00 | $88.30 | $80.46 | $93.06 |
| 66 | Drilled shaft (18 inch) (503-00018) | LF | 35 | $350.00 | $264.90 | $483.16 | $544.77 |
| 67 | Drilled shaft (24 inch) (503-00024) | LF | 24 | $450.00 | $661.70 | $547.58 | $617.40 |
| 68 | Drilled shaft (36 inch) (503-00036) | LF | 91 | $800.00 | $929.00 | $966.32 | $1,089.53 |
| 69 | Drilled shaft (48 inch) (503-00048) | LF | 126 | $750.00 | $950.00 | $1,025.37 | $1,156.12 |
| 70 | Drilled shaft (54 inch) (503-00054) | LF | 84 | $850.00 | $1,050.00 | $1,100.53 | $1,240.86 |
| 71 | Waterproofing (membrane) (515-00120) | SY | 1,568 | $30.00 | $28.25 | $26.24 | $29.34 |
| 72 | Concrete class DR (601-03057) | CY | 12 | $7,000.00 | $4,570.00 | $4,478.43 | $4,744.02 |
| 73 | Concrete (patching) (601-06102) | CF | 4 | $1,500.00 | $1,830.00 | $1,800.61 | $1,907.39 |
| 74 | Galvanic anodes (601-51005) | EACH | 473 | $35.00 | $48.25 | $44.83 | $50.13 |
| 75 | Reinforcing steel (602-00000) | LB | 550 | $5.00 | $5.90 | $5.47 | $6.11 |
| 76 | 18 inch reinforced concrete pipe (603-01180) | LF | 125 | $120.00 | $259.00 | $205.00 | $235.76 |
| 77 | 18 inch reinforced concrete end section (603-05018) | EACH | 5 | $1,200.00 | $3,650.00 | $2,373.68 | $2,729.86 |
| 78 | Inlet type C (5 foot) (604-00305) | EACH | 3 | $6,015.36 | $13,540 | $6,473.68 | $7,445.07 |
| 79 | Fence barbed wire with treated wooden posts (607-01100) | LF | 11 | $12.00 | $182.50 | $537.63 | $181.59 |
| 80 | Concrete sidewalk (608-00000) | SY | 3,155 | $75.00 | $104.80 | $95.48 | $110.44 |
| 81 | Concrete curb ramp (608-00010) | SY | 1,614 | $205.00 | $153.06 | $139.46 | $161.31 |
| 82 | Detectable warnings (608-00015) | SF | 64 | $95.00 | $117.75 | $107.28 | $124.08 |
| 83 | Curb type 2 (section B) (special) (609-20000) | LF | 241 | $100.00 | $50.60 | $46.13 | $53.36 |
| 84 | Curb type 2 (section B) (609-20010) | LF | 500 | $48.42 | $47.10 | $42.91 | $49.63 |
| 85 | Curb and gutter type 2 (section II-B) (609-21020) | LF | 884 | $47.00 | $53.00 | $48.28 | $55.84 |
| 86 | Curb and gutter type 2 (section II-M) (609-21021) | LF | 289 | $35.00 | $56.50 | $51.49 | $59.56 |
| 87 | Median cover material (patterned concrete) (610-00020) | SF | 828 | $30.00 | $25.90 | $23.60 | $27.30 |
| 88 | Median cover material (concrete) (610-00030) | SF | 863 | $20.00 | $23.55 | $21.46 | $24.82 |
| 89 | Delineator (type I) (612-00001) | EACH | 230 | $32.00 | $37.75 | $34.69 | $39.13 |
| 90 | Delineator (type II) (612-00002) | EACH | 260 | $30.00 | $41.25 | $37.95 | $42.79 |
| 91 | Delineator (type III) (612-00003) | EACH | 2 | $40.00 | $44.75 | $41.20 | $46.46 |
| 92 | 2 inch electrical conduit (bored) (613-00206) | LF | 1,293 | $30.00 | $30.60 | $36.51 | $41.16 |
| 93 | 3 inch electrical conduit (bored) (613-00306) | LF | 2,736 | $40.00 | $35.30 | $36.51 | $41.16 |
| 94 | 2 inch electrical conduit (plastic) (613-01200) | LF | 1,190 | $20.00 | $30.60 | $32.21 | $36.32 |
| 95 | 3 inch electrical conduit (plastic) (613-01300) | LF | 260 | $25.00 | $35.30 | $32.21 | $36.32 |
| 96 | Type two pull box (613-07002) | EACH | 4 | $1,500.00 | $2,137.00 | $1,524.63 | $1,755.36 |
| 97 | Type four pull box (613-07004) | EACH | 16 | $2,000.00 | $3,696.00 | $2,979.47 | $3,359.39 |
| 98 | Type five pull box (613-07005) | EACH | 4 | $2,500.00 | $4,904.00 | $3,736.42 | $4,212.86 |
| 99 | Wiring (613-10000) | LS | 1 | $56,362 | $105,000 | $119,179 | $134,376 |
| 100 | Luminaire (LED) (14,000 lumens) (613-13014) | EACH | 15 | $40.00 | $1,328.00 | $1,395.79 | $1,573.77 |
| 101 | Luminaire (special) (613-16000) | EACH | 2 | $1,000.00 | $1,520.00 | $2,254.74 | $2,542.24 |
| 102 | Light standard timber (30 foot) (613-33300) | EACH | 2 | $3,500.00 | $3,175.00 | $5,583.16 | $6,295.08 |
| 103 | Light standard metal (35 foot) (613-34350) | EACH | 2 | $4,000.00 | $6,342.00 | $4,756.42 | $5,362.92 |
| 104 | Concrete foundation pad (613-40000) | EACH | 2 | $3,000.00 | $2,285.00 | $3,306.95 | $3,728.62 |
| 105 | Light standard foundation (613-40010) | EACH | 2 | $2,000.00 | $5,210.00 | $2,845.26 | $3,208.07 |
| 106 | Meter power pedestal (613-50109) | EACH | 2 | $12,000 | $9,860.00 | $12,455 | $14,043 |
| 107 | Service meter cabinet (613-80130) | EACH | 5 | $7,000.00 | $9,860.00 | $11,435 | $12,893 |
| 108 | Sign panel (class I) (614-00011) | SF | 688 | $30.00 | $28.25 | $26.02 | $29.34 |
| 109 | Steel sign support (2-inch round)(post and socket) (614-01503) | EACH | 75 | $400.00 | $440.00 | $406.58 | $458.51 |
| 110 | Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01573) | EACH | 21 | $500.00 | $689.00 | $406.58 | $715.27 |
| 111 | Pedestrian signal face (16) (countdown) (614-70150) | EACH | 41 | $700.00 | $1,000.00 | $1,025.37 | $1,156.12 |
| 112 | Accessible pedestrian signal (614-70200) | EACH | 58 | $1,500.00 | $2,225.00 | $1,846.74 | $2,082.22 |
| 113 | Traffic signal face (12-12-12) (614-70336) | EACH | 96 | $850.00 | $1,420.00 | $1,465.58 | $1,652.46 |
| 114 | Traffic signal face (12-12-12-12) (614-70448) | EACH | 26 | $1,200.00 | $1,600.00 | $1,782.32 | $2,009.58 |
| 115 | Conflict monitor (614-72836) | EACH | 5 | $1,000.00 | $1,850.00 | $1,519.26 | $1,712.99 |
| 116 | Traffic signal controller cabinet (614-72855) | EACH | 5 | $25,000 | $33,600 | $31,137 | $35,107 |
| 117 | Pedestrian push button post assembly (614-72863) | EACH | 32 | $2,000.00 | $1,820.00 | $1,610.53 | $1,815.89 |
| 118 | Traffic signal vehicle detector (micro wave type) (614-72884) | EACH | 21 | $8,000.00 | $12,975 | $11,435 | $12,893 |
| 119 | Intersection detection system (camera) (614-72886) | EACH | 18 | $12,000 | $12,975 | $12,240 | $13,801 |
| 120 | Microwave vehicle radar detector (614-72887) | EACH | 26 | $15,000 | $13,360 | $11,811 | $13,317 |
| 121 | Traffic signal-light pole steel (1-35 foot mast arm) (614-81135) | EACH | 2 | $20,000 | $25,000 | $22,011 | $24,817 |
| 122 | Traffic signal-light pole steel (1-55 foot mast arm) (614-81155) | EACH | 5 | $25,000 | $33,400 | $27,808 | $31,354 |
| 123 | Traffic signal light pole steel (1-60 foot mast arm) (614-81160) | EACH | 3 | $40,000 | $37,500 | $32,533 | $36,681 |
| 124 | Traffic signal-light pole steel (1-65 foot mast arm) (614-81165) | EACH | 1 | $45,000 | $45,500 | $37,042 | $41,765 |
| 125 | Traffic signal-light pole steel (1-70 foot mast arm) (614-81170) | EACH | 2 | $30,000 | $49,000 | $40,102 | $45,216 |
| 126 | Traffic signal-light pole steel (1-75 foot mast arm) (614-81175) | EACH | 2 | $35,000 | $50,000 | $40,317 | $45,458 |
| 127 | Traffic signal pedestal pole steel (614-84000) | EACH | 8 | $2,000.00 | $4,100.00 | $3,060.00 | $3,413.87 |
| 128 | Traffic signal controller (type 2070LC) (614-86248) | EACH | 5 | $7,000.00 | $7,650.00 | $8,020.42 | $9,043.12 |
| 129 | Uninterrupted power supply (614-86800) | EACH | 5 | $20,000 | $8,235.00 | $8,911.58 | $10,048 |
| 130 | Fiber optic cable (single mode) (12 fiber) (614-87010) | LF | 800 | $10.00 | $12.95 | $9.66 | $10.90 |
| 131 | Fiber optic termination panel (12 fiber) (614-87012) | EACH | 4 | $2,000.00 | $1,625.00 | $1,181.05 | $1,331.65 |
| 132 | Closed circuit television camera (traffic surveillance) (614-87333) | EACH | 1 | $4,000.00 | $5,900.00 | $9,582.63 | $10,805 |
| 133 | Test fiber optic cable (614-87350) | LS | 1 | $15,000 | $6,625.00 | $5,207.37 | $5,871.37 |
| 134 | Splice fiber optic cable (12 strand) (614-87512) | EACH | 4 | $850.00 | $1,100.00 | $1,181.05 | $1,331.65 |
| 135 | Ethernet switch type II (614-87692) | EACH | 5 | $7,000.00 | $14,550 | $10,474 | $11,809 |
| 136 | Field office (special) (620-00005) | EACH | 1 | $250,000 | $135,900 | $29,387 | $127,353 |
| 137 | Field laboratory (class 2) (620-00012) | EACH | 1 | $120,000 | $79,000 | $31,077 | $67,066 |
| 138 | Sanitary facility (620-00020) | EACH | 2 | $6,000.00 | $10,500 | $6,526.32 | $13,074 |
| 139 | Construction surveying (625-00000) | LS | 1 | $15,000 | $90,000 | $72,632 | $83,530 |
| 140 | Mobilization (626-00000) | LS | 1 | $1,214,139 | $1,269,983 | $917,725 | $1,103,913 |
| 141 | Public information services (tier III) (626-01103) | LS | 1 | $50,000 | $20,600 | $33,684 | $12,530 |
| 142 | Modified epoxy pavement marking (627-00008) | GAL | 390 | $200.00 | $147.15 | $134.21 | $201.74 |
| 143 | Pavement marking paint (high build)(temporary) (627-00016) | GAL | 451 | $115.00 | $88.30 | $80.53 | $128.99 |
| 144 | Preformed plastic pavement marking (type I)(inlaid) (627-01010) | SF | 6,091 | $25.00 | $18.85 | $17.18 | $27.51 |
| 145 | Preformed thermoplastic pavement marking (word-symbol) (627-30405) | SF | 1,941 | $23.00 | $18.85 | $17.18 | $22.62 |
| 146 | Preformed thermoplastic pavement marking (xwalk-stop line) (627-30410) | SF | 20,922 | $15.00 | $14.15 | $12.88 | $15.28 |
| 147 | Flagging (630-00000) | HR | 6,500 | $45.00 | $53.00 | $43.24 | $50.12 |
| 148 | Uniformed traffic control (630-00003) | HR | 1,200 | $200.00 | $175.00 | $164.21 | $25.06 |
| 149 | Traffic control vehicle (630-00004) | EACH | 2 | $3,000.00 | $12,950 | $45,464 | $3,132.38 |
| 150 | Traffic control inspection (630-00007) | DAY | 80 | $250.00 | $325.00 | $418.35 | $484.89 |
| 151 | Traffic control management (630-00012) | DAY | 155 | $1,600.00 | $1,650.00 | $1,636.66 | $1,896.97 |
| 152 | Uniformed traffic control coordination (630-00015) | HR | 60 | $60.00 | $47.00 | $21.62 | $25.06 |
| 153 | Flashing beacon (solar) (630-80002) | EACH | 10 | $2,000.00 | $825.00 | $972.92 | $1,127.66 |
| 154 | Barricade (type 3 M-A) (temporary) (630-80335) | EACH | 12 | $250.00 | $175.00 | $162.15 | $187.94 |
| 155 | Pedestrian barricade (ADA) (630-80340) | LF | 100 | $42.99 | $59.00 | $5.41 | $6.26 |
| 156 | Construction traffic sign (panel size A) (630-80341) | EACH | 122 | $70.00 | $53.00 | $27.03 | $31.32 |
| 157 | Construction traffic sign (panel size B) (630-80342) | EACH | 118 | $85.00 | $76.50 | $37.84 | $43.85 |
| 158 | Portable message sign panel (630-80355) | EACH | 8 | $6,000.00 | $9,420.00 | $4,724.05 | $5,496.69 |
| 159 | Advance warning flashing or sequencing arrow panel (B type) (630-80357) | EACH | 4 | $2,000.00 | $2,060.00 | $2,118.80 | $2,455.78 |
| 160 | Drum channelizing device (630-80360) | EACH | 150 | $50.00 | $53.00 | $16.22 | $18.79 |
| 161 | Traffic cone (630-80380) | EACH | 400 | $15.00 | $17.65 | $12.97 | $15.04 |
| 162 | Stackable vertical panels (630-80393) | EACH | 200 | $40.00 | $49.45 | $15.13 | $17.54 |
| 163 | Impact attenuator (truck mounted attenuator) (temporary) (630-85040) | EACH | 2 | $30,000 | $136,875 | $69,747 | $131,334 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of January 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.