CDOT contract C23369 bid tabulation
US 85 FROM I-76 TO 124TH AVENUE Resurfacing project on US85 from I-76 to 124th Avenue. It also includes median work at 120th Avenue. Let by Colorado DOT on March 20, 2025, Adams, Region 1. 3 bids received; low bid $7,290,198 by Oldcastle SW Group, Inc., -3.3% against the engineer's estimate of $7,539,979.
- Owner
- Colorado DOT
- Letting
- 20 MAR 2025
- Pay items
- 83
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Oldcastle SW Group, Inc. | $7,290,198 | Low | -3.0% |
| 2 | Brannan Sand and Gravel, LLC | $7,310,703 | 0.0% | -3.0% |
| 3 | Martin Marietta Materials, Inc. | $8,668,191 | +19% | +15% |
Engineer's estimate: $7,539,979.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Oldcastle SW Group, Inc. | 2. Brannan Sand and Gravel, LLC | 3. Martin Marietta Materials, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $40,636 | $5,100.00 | $16,000 | $16,657 |
| 2 | Removal of delineator (202-00090) | EACH | 100 | $14.72 | $10.20 | $25.00 | $25.97 |
| 3 | Removal of concrete median cover material (202-00190) | SY | 14 | $64.60 | $45.95 | $32.50 | $43.29 |
| 4 | Removal of median cover (202-00195) | SY | 226 | $25.57 | $40.80 | $32.50 | $25.69 |
| 5 | Removal of sidewalk (202-00200) | SY | 5 | $91.75 | $51.00 | $32.50 | $23.27 |
| 6 | Removal of curb and gutter (202-00203) | LF | 465 | $18.77 | $13.25 | $18.00 | $22.39 |
| 7 | Removal of concrete curb ramp (202-00206) | SY | 17 | $73.17 | $45.90 | $32.50 | $21.49 |
| 8 | Removal of asphalt mat (202-00220) | SY | 4,756 | $6.59 | $15.90 | $16.00 | $18.80 |
| 9 | Removal of asphalt mat (planing) (202-00240) | SY | 168,060 | $2.10 | $3.91 | $3.00 | $3.84 |
| 10 | Removal of pavement marking (202-00250) | SF | 596 | $3.91 | $7.90 | $3.35 | $9.56 |
| 11 | Removal of sign panel (202-00821) | EACH | 8 | $150.01 | $155.00 | $62.80 | $64.31 |
| 12 | Clean inlet (202-04010) | EACH | 10 | $1,607.32 | $3,575.00 | $265.00 | $916.11 |
| 13 | Unclassified excavation (203-00000) | CY | 20 | $184.17 | $105.00 | $268.00 | $236.40 |
| 14 | Potholing (203-01597) | HR | 80 | $309.73 | $360.00 | $400.00 | $365.22 |
| 15 | Erosion log type 1 (12 inch) (208-00002) | LF | 200 | $8.32 | $10.70 | $12.00 | $13.31 |
| 16 | Aggregate bag (208-00035) | LF | 300 | $12.25 | $12.40 | $14.00 | $15.46 |
| 17 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 2 | $2,299.14 | $2,570.00 | $3,000.00 | $3,194.91 |
| 18 | Storm drain inlet protection (type I) (84 inch) (208-00053) | EACH | 5 | $207.41 | $305.00 | $350.00 | $376.02 |
| 19 | Storm drain inlet protection (type II) (208-00054) | EACH | 5 | $277.35 | $405.00 | $475.00 | $501.79 |
| 20 | Pre-fabricated vehicle tracking pad (208-00075) | EACH | 2 | $3,727.79 | $4,375.00 | $4,600.00 | $5,443.42 |
| 21 | Removal and disposal of sediment (labor) (208-00103) | HR | 80 | $77.73 | $75.25 | $85.00 | $93.69 |
| 22 | Removal and disposal of sediment (equipment) (208-00105) | HR | 40 | $155.86 | $163.90 | $180.00 | $204.06 |
| 23 | Sweeping (sediment removal) (208-00106) | HR | 100 | $205.92 | $209.20 | $235.00 | $260.42 |
| 24 | Removal of trash (208-00107) | HR | 10 | $146.09 | $97.00 | $112.00 | $120.68 |
| 25 | Erosion control management (208-00207) | DAY | 40 | $454.05 | $450.50 | $445.00 | $562.13 |
| 26 | Landscape restoration (212-01200) | LS | 1 | $58,182 | $8,950.00 | $12,000 | $11,116 |
| 27 | Herbicide treatment (217-00020) | HR | 10 | $216.60 | $255.00 | $375.00 | $427.52 |
| 28 | Wildlife biologist (240-00000) | HR | 120 | $117.61 | $155.00 | $195.00 | $183.22 |
| 29 | Removal of nests (240-00010) | HR | 80 | $77.79 | $155.00 | $195.00 | $177.12 |
| 30 | Aggregate base course (class 6) (304-06007) | CY | 771 | $80.93 | $71.45 | $125.00 | $152.93 |
| 31 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 100 | $314.72 | $375.00 | $290.00 | $362.79 |
| 32 | Stone matrix asphalt (fibers)(asphalt) (403-09221) | TON | 28,926 | $150.13 | $134.90 | $122.50 | $159.36 |
| 33 | Hot mix asphalt (grading S) (100) (PG 64- 22) (403-33841) | TON | 1,869 | $134.40 | $244.50 | $145.00 | $268.96 |
| 34 | Emulsified asphalt (slow-setting) (411-10255) | GAL | 7,710 | $6.05 | $4.10 | $5.40 | $4.89 |
| 35 | Fence (plastic) (607-11525) | LF | 100 | $6.05 | $5.05 | $6.00 | $6.29 |
| 36 | Concrete sidewalk (608-00000) | SY | 20 | $163.21 | $97.95 | $108.00 | $102.76 |
| 37 | Concrete curb ramp (608-00010) | SY | 42 | $261.03 | $163.25 | $241.50 | $117.67 |
| 38 | Detectable warnings (608-00015) | SF | 50 | $87.32 | $107.15 | $72.50 | $75.59 |
| 39 | Curb and gutter type 2 (section I-B) (609-21010) | LF | 438 | $45.62 | $58.15 | $42.25 | $39.59 |
| 40 | Median cover material (patterned concrete) (610-00020) | SF | 1,097 | $22.50 | $25.50 | $16.90 | $18.70 |
| 41 | Delineator (flexible) (type I) (612-00041) | EACH | 50 | $109.96 | $86.70 | $82.00 | $84.10 |
| 42 | Delineator (flexible) (type II) (612-00042) | EACH | 50 | $129.77 | $86.70 | $83.00 | $85.34 |
| 43 | Delineator (flexible) (type III) (612-00043) | EACH | 50 | $115.82 | $86.70 | $85.50 | $87.81 |
| 44 | Wiring (613-10000) | LS | 1 | $20,000 | $30,600 | $7,100.00 | $7,126.14 |
| 45 | Sign panel (class I) (614-00011) | SF | 11 | $33.73 | $25.00 | $78.50 | $80.39 |
| 46 | Sign panel (class II) (614-00012) | SF | 117 | $34.44 | $35.70 | $50.70 | $51.94 |
| 47 | Steel sign support (2-1/2 in round SCH 80) (post & slipbase) (614-01583) | EACH | 11 | $642.66 | $730.00 | $832.00 | $852.12 |
| 48 | Accessible pedestrian signal (614-70200) | EACH | 4 | $2,308.88 | $3,570.00 | $2,415.00 | $2,442.97 |
| 49 | Pedestrian push button post assembly (614-72863) | EACH | 4 | $3,000.00 | $3,570.00 | $5,575.00 | $5,635.93 |
| 50 | Rumble strip (614-80385) | LF | 32,086 | $0.43 | $0.41 | $0.70 | $0.49 |
| 51 | Field office (class 2) (620-00002) | EACH | 1 | $21,667 | $19,700 | $107,000 | $63,639 |
| 52 | Field laboratory (class 2) (620-00012) | EACH | 1 | $16,766 | $20,450 | $83,000 | $65,454 |
| 53 | Sanitary facility (620-00020) | EACH | 1 | $4,390.72 | $3,950.00 | $5,000.00 | $5,863.12 |
| 54 | Construction surveying (625-00000) | LS | 1 | $10,000 | $48,500 | $32,000 | $36,156 |
| 55 | Mobilization (626-00000) | LS | 1 | $813,313 | $390,500 | $814,000 | $518,647 |
| 56 | Public information management (tier III) (626-01113) | DAY | 150 | $81.48 | $117.50 | $99.00 | $73.29 |
| 57 | Modified epoxy pavement marking (627-00008) | GAL | 808 | $205.09 | $168.35 | $177.00 | $203.56 |
| 58 | Pavement marking paint (high build) (627-00013) | GAL | 1,705 | $53.46 | $86.70 | $73.80 | $104.86 |
| 59 | Preformed plastic pavement marking (type I)(inlaid) (627-01010) | SF | 7,579 | $19.15 | $22.20 | $26.00 | $26.83 |
| 60 | Preformed plastic pavement marking (contrast)(inlaid) (627-01011) | SF | 596 | $30.15 | $22.20 | $25.00 | $26.83 |
| 61 | Preformed plastic pavement marking (type II) (inlaid) (627-02010) | SF | 54 | $37.22 | $25.00 | $27.00 | $30.23 |
| 62 | Preformed thermoplastic pavement marking (word-symbol) (627-30405) | SF | 1,323 | $24.15 | $23.20 | $25.00 | $28.07 |
| 63 | Preformed thermoplastic pavement marking (xwalk-stop line) (627-30410) | SF | 17,017 | $13.37 | $15.30 | $13.50 | $18.51 |
| 64 | Locate monuments (629-01110) | HR | 8 | $258.27 | $2,050.00 | $300.00 | $244.30 |
| 65 | Flagging (630-00000) | HR | 1,200 | $41.83 | $45.40 | $51.75 | $52.33 |
| 66 | Uniformed traffic control (630-00003) | HR | 600 | $140.25 | $102.00 | $133.00 | $134.56 |
| 67 | Uniformed traffic control (vehicle) (630-00006) | HR | 600 | $30.89 | $102.00 | $61.50 | $62.30 |
| 68 | Traffic control inspection (630-00007) | DAY | 55 | $600.00 | $219.40 | $222.00 | $224.26 |
| 69 | Traffic control management (630-00012) | DAY | 70 | $1,600.00 | $1,377.50 | $1,775.00 | $1,794.12 |
| 70 | Uniformed traffic control coordination (630-00015) | HR | 25 | $40.35 | $45.90 | $37.00 | $37.38 |
| 71 | Barricade (type 3 M-A) (temporary) (630-80335) | EACH | 6 | $120.23 | $155.00 | $210.00 | $211.81 |
| 72 | Construction traffic sign (panel size A) (630-80341) | EACH | 63 | $49.73 | $40.80 | $92.00 | $93.44 |
| 73 | Construction traffic sign (panel size B) (630-80342) | EACH | 74 | $64.73 | $51.00 | $92.00 | $93.44 |
| 74 | Construction traffic sign (panel size C) (630-80343) | EACH | 6 | $73.50 | $81.65 | $92.00 | $93.44 |
| 75 | Vertical panel (630-80350) | EACH | 100 | $34.74 | $40.80 | $36.00 | $37.38 |
| 76 | Portable message sign panel (630-80355) | EACH | 4 | $5,172.24 | $7,140.00 | $9,800.00 | $9,905.01 |
| 77 | Advance warning flashing or sequencing arrow panel (B type) (630-80357) | EACH | 2 | $1,059.06 | $1,840.00 | $3,100.00 | $3,114.78 |
| 78 | Advance warning flashing or sequencing arrow panel (C type) (630-80358) | EACH | 4 | $1,172.47 | $1,840.00 | $3,100.00 | $3,114.78 |
| 79 | Drum channelizing device (630-80360) | EACH | 70 | $27.62 | $40.80 | $49.30 | $49.84 |
| 80 | Drum channelizing device (with light) (flashing) (630-80363) | EACH | 10 | $35.41 | $45.90 | $67.00 | $68.53 |
| 81 | Traffic cone (630-80380) | EACH | 633 | $9.40 | $15.30 | $30.00 | $31.15 |
| 82 | Mobile attenuator (630-85020) | EACH | 2 | $26,765 | $21,430 | $67,000 | $89,799 |
| 83 | Night work lighting (632-00000) | LS | 1 | $50,000 | $25,500 | $38,000 | $44,803 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of March 20, 2025. Compiled by Mirage Metrics.