CDOT contract C26762A bid tabulation
THIS PROJECT IS LOCATED ON SH 141 FROM MP 107 TO 120 IN MESA COUNTY. THE WORK CONSISTS OF 1" HMA LEVELING COURSE AND 2" HMA OVERLAY. THE PROJECT WILL ALSO INCLUDE GUARDRAIL REPLACEMENT, BRIDGE REPAIR, DELINEATION, AND PAVEMENT MARKING. THERE ARE TWO SEPARATE BID SCHEDULES FOR THIS PROJECT: SCHEDULE. Let by Colorado DOT on March 27, 2025, Mesa, Region 3. 2 bids received; low bid $7,979,768 by Kilgore Companies, LLC dba Elam Construction, -15% against the engineer's estimate of $9,368,921.
- Owner
- Colorado DOT
- Letting
- 27 MAR 2025
- Pay items
- 84
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kilgore Companies, LLC dba Elam Construction | $7,979,768 | Low | -15% |
| 2 | Oldcastle SW Group, Inc. | $8,731,891 | +9.0% | -7.0% |
Engineer's estimate: $9,368,921.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Kilgore Companies, LLC dba Elam Construction | 2. Oldcastle SW Group, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removal of delineator (202-00090) | EACH | 298 | $10.00 | $5.00 | $16.00 |
| 2 | Removal of asphalt mat (planing) (202-00240) | SY | 14,624 | $8.00 | $10.90 | $8.00 |
| 3 | Removal of pavement marking (202-00250) | SF | 104,218 | $1.00 | $0.50 | $0.55 |
| 4 | Removal of bridge railing (202-00425) | LF | 10 | $50.00 | $56.20 | $106.50 |
| 5 | Removal of portions of present structure (class 2) (202-00453) | SY | 24 | $350.00 | $201.00 | $213.00 |
| 6 | Removal of guardrail type 3 (202-01130) | LF | 2,525 | $10.00 | $6.45 | $13.00 |
| 7 | Removal of guardrail type 4 (202-01140) | LF | 30 | $40.00 | $99.80 | $106.00 |
| 8 | Removal of end anchorage (202-01300) | EACH | 11 | $200.00 | $286.00 | $1,275.00 |
| 9 | Sandblasting reinforcing steel (202-05100) | SY | 24 | $25.00 | $301.00 | $325.00 |
| 10 | Blading (203-01500) | HR | 20 | $170.00 | $195.00 | $200.00 |
| 11 | Backhoe (203-01510) | HR | 10 | $180.00 | $170.00 | $120.00 |
| 12 | Truck (dump) (203-01582) | HR | 10 | $150.00 | $185.00 | $135.00 |
| 13 | Potholing (203-01597) | HR | 20 | $250.00 | $401.00 | $420.00 |
| 14 | Laborer (203-02330) | HR | 10 | $60.00 | $51.20 | $45.00 |
| 15 | Erosion log type 1 (12 inch) (208-00002) | LF | 2,000 | $8.00 | $6.20 | $7.00 |
| 16 | Aggregate bag (208-00035) | LF | 200 | $10.00 | $9.05 | $15.00 |
| 17 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 1 | $2,000.00 | $3,010.00 | $10,000 |
| 18 | Removal and disposal of sediment (labor) (208-00103) | HR | 20 | $70.00 | $51.20 | $67.00 |
| 19 | Removal and disposal of sediment (equipment) (208-00105) | HR | 20 | $150.00 | $170.00 | $153.00 |
| 20 | Sweeping (sediment removal) (208-00106) | HR | 20 | $150.00 | $145.00 | $150.00 |
| 21 | Removal of trash (208-00107) | HR | 20 | $120.00 | $124.00 | $60.00 |
| 22 | Reset ground sign (210-00810) | EACH | 4 | $300.00 | $376.00 | $500.00 |
| 23 | Adjust manhole (210-04010) | EACH | 4 | $1,300.00 | $1,060.00 | $3,165.00 |
| 24 | Organic fertilizer (212-00700) | LB | 150 | $0.40 | $2.35 | $3.00 |
| 25 | Biotic soil amendments (hydraulically applied) (212-00702) | LB | 1,750 | $1.00 | $2.50 | $3.00 |
| 26 | Humate (212-00703) | LB | 100 | $0.50 | $2.45 | $3.00 |
| 27 | Seeding (native) hydraulic (212-00707) | ACRE | 0.50 | $1,000.00 | $2,330.00 | $2,850.00 |
| 28 | Spray-on mulch blanket (213-00012) | ACRE | 0.50 | $4,000.00 | $5,770.00 | $7,015.00 |
| 29 | Environmental health and safety management (250-00010) | LS | 1 | $5,000.00 | $10,030 | $5,000.00 |
| 30 | Monitoring technician (250-00050) | HR | 10 | $100.00 | $401.00 | $400.00 |
| 31 | Health and safety officer (250-00110) | HR | 10 | $100.00 | $401.00 | $425.00 |
| 32 | Aggregate base course (class 7) (304-07005) | CY | 4,040 | $150.00 | $57.00 | $50.00 |
| 33 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 138.60 | $400.00 | $221.00 | $325.00 |
| 34 | Hot mix asphalt (grading SX) (75) (403-34701) | TON | 27,069.62 | $85.00 | $94.50 | $95.00 |
| 35 | Hot mix asphalt (grading ST)(75) (403-36701) | TON | 14,549.07 | $125.00 | $94.90 | $95.00 |
| 36 | Asphalt cement performance grade (PG 58-28) (411-03352) | TON | 989.34 | $600.00 | $550.00 | $450.00 |
| 37 | Asphalt cement performance grade (PG 64-22) 00 (411-03354) | TON | 1,625.94 | $650.00 | $540.00 | $450.00 |
| 38 | Emulsified asphalt (slow-setting) (411-10255) | GAL | 26,784 | $5.00 | $3.00 | $5.50 |
| 39 | Structural steel (509-00000) | LB | 75 | $350.00 | $27.10 | $65.00 |
| 40 | Waterproofing (membrane) (515-00120) | SY | 920 | $20.00 | $45.10 | $50.00 |
| 41 | Sawing and sealing bridge joint (518-03000) | LF | 461 | $30.00 | $42.10 | $45.00 |
| 42 | Concrete class DR (601-03057) | CY | 3 | $2,000.00 | $5,970.00 | $6,500.00 |
| 43 | Galvanic anodes (601-51005) | EACH | 120 | $30.00 | $89.20 | $95.00 |
| 44 | Reinforcing steel (epoxy coated) (602-00020) | LB | 200 | $5.00 | $1.80 | $2.00 |
| 45 | Guardrail type 3 (31 inch midwest guardrail system) (606-00302) | LF | 1,762.50 | $60.00 | $42.00 | $99.00 |
| 46 | Guardrail type 7 (style CA) (606-00710) | LF | 68 | $275.00 | $409.00 | $535.00 |
| 47 | Transition type 3G (606-01370) | EACH | 18 | $5,700.00 | $3,720.00 | $15,500 |
| 48 | Transition type 3J (606-01385) | EACH | 2 | $4,000.00 | $3,110.00 | $8,300.00 |
| 49 | End anchorage type 3K (606-01390) | EACH | 2 | $4,000.00 | $2,550.00 | $7,700.00 |
| 50 | Transition type BR10B-GR3 (606-01402) | EACH | 14 | $180.00 | $17,290 | $23,000 |
| 51 | End anchorage (flared) (606-02005) | EACH | 12 | $6,500.00 | $3,780.00 | $13,000 |
| 52 | Curb type 6 (section M) (609-60011) | LF | 17 | $25.00 | $201.00 | $225.00 |
| 53 | Delineator (type I) (612-00001) | EACH | 622 | $25.00 | $24.10 | $160.00 |
| 54 | Delineator (type II) (612-00002) | EACH | 8 | $30.00 | $26.10 | $117.00 |
| 55 | Delineator (type III) (612-00003) | EACH | 40 | $40.00 | $28.10 | $128.00 |
| 56 | Sign panel (class I) (614-00011) | SF | 30 | $25.00 | $20.10 | $27.00 |
| 57 | Steel sign support (2-inch round)(post and socket) (614-01503) | EACH | 10 | $25.00 | $351.00 | $480.00 |
| 58 | Field office (class 2) (620-00002) | EACH | 1 | $50,000 | $17,230 | $65,000 |
| 59 | Field laboratory (class 2) (620-00012) | EACH | 1 | $50,000 | $10,980 | $55,000 |
| 60 | Sanitary facility (620-00020) | EACH | 1 | $4,000.00 | $4,760.00 | $20,000 |
| 61 | Construction surveying (hourly) (625-00001) | HR | 10 | $300.00 | $301.00 | $310.00 |
| 62 | Mobilization (626-00000) | LS | 1 | $1,000,000 | $500,000 | $680,000 |
| 63 | Public information services (tier IV) (626-01104) | LS | 1 | $25,000 | $4,510.00 | $16,200 |
| 64 | Modified epoxy pavement marking (627-00008) | GAL | 1,223 | $150.00 | $143.00 | $152.00 |
| 65 | Pavement marking paint (high build)(temporary) (627-00016) | GAL | 1,979 | $90.00 | $50.70 | $95.50 |
| 66 | Preformed thermoplastic pavement marking (word-symbol) (special) (627-30407) | SF | 176 | $25.00 | $32.10 | $34.00 |
| 67 | Preformed thermoplastic pavement marking (xwalk-stop line) (special) (627-30411) | SF | 90 | $20.00 | $28.10 | $30.00 |
| 68 | Flagging (630-00000) | HR | 3,500 | $50.00 | $47.10 | $42.00 |
| 69 | Pilot car operation (630-00001) | HR | 750 | $50.00 | $95.30 | $50.00 |
| 70 | Traffic control inspection (630-00007) | DAY | 35 | $400.00 | $376.00 | $300.00 |
| 71 | Traffic control management (630-00012) | DAY | 80 | $1,200.00 | $1,400.00 | $1,500.00 |
| 72 | Construction traffic sign (panel size A) (630-80341) | EACH | 53 | $50.00 | $90.30 | $30.00 |
| 73 | Construction traffic sign (panel size B) (630-80342) | EACH | 138 | $60.00 | $95.30 | $30.00 |
| 74 | Construction traffic sign (special) (630-80344) | SF | 52 | $20.00 | $100.00 | $25.00 |
| 75 | Portable message sign panel (630-80355) | EACH | 2 | $6,000.00 | $12,290 | $10,000 |
| 76 | Drum channelizing device (630-80360) | EACH | 150 | $35.00 | $30.10 | $30.00 |
| 77 | Drum channelizing device (with light) (flashing) (630-80363) | EACH | 10 | $40.00 | $35.10 | $30.00 |
| 78 | Drum channelizing device (with light) (steady burn) (630-80364) | EACH | 25 | $40.00 | $35.10 | $30.00 |
| 79 | Portable water filled barrier (temporary) (630-80377) | LF | 400 | $50.00 | $35.10 | $75.00 |
| 80 | Traffic cone (630-80380) | EACH | 300 | $10.00 | $10.00 | $15.00 |
| 81 | Portable rumble strips (temporary) (630-80440) | EACH | 24 | $1,500.00 | $1,200.00 | $200.00 |
| 82 | Mobile pavement marking zone (630-80511) | LS | 1 | $10,000 | $12,540 | $20,000 |
| 83 | Impact attenuator (temporary) (630-85010) | EACH | 4 | $12,000 | $7,770.00 | $1,600.00 |
| 84 | Traffic signal (temporary) (630-86810) | EACH | 2 | $50,000 | $21,060 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of March 27, 2025. Compiled by Mirage Metrics.