CDOT contract C25960 bid tabulation

CO 119 (MM 44.237-55.5). Let by Colorado DOT on July 11, 2025. 1 bid received; low bid $19,859,813 by Kraemer North America, LLC, -1.3% against the engineer's estimate of $20,126,783.

Owner
Colorado DOT
Letting
11 JUL 2025
Pay items
300
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Kraemer North America, LLC$19,859,813Low-1.0%
CDOT contract C25960: bids by rank

Engineer's estimate: $20,126,783.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Kraemer North America, LLC
1Clearing and grubbing (201-00000)LS1$12,355$11,244
2Removal of structures and obstructions (202-00000)LS1$14,338$14,338
3Removal of tree (202-00010)EACH4$1,272.55$2,593.79
4Removal of inlet (202-00019)EACH2$2,750.33$2,750.33
5Removal of pipe (202-00035)LF332$421.31$77.68
6Removal of end section (202-00037)EACH6$738.32$738.32
7Removal of electrical conduit (202-00040)LF200$13.26$22.10
8Removal of concrete median cover material (202-00190)SY175$18.69$18.69
9Removal of sidewalk (202-00200)SY1,524$11.68$11.68
10Removal of curb and gutter (202-00203)LF711$12.14$12.14
11Removal of concrete curb ramp (202-00206)SY51$45.35$45.35
12Removal of asphalt mat (202-00220)SY5,386$12.44$12.44
13Removal of pavement marking (202-00250)SF26,600$2.24$2.24
14Removal of light standard (202-00700)EACH6$817.70$817.70
15Removal of light standard foundation (202-00705)EACH6$1,149.20$1,149.20
16Removal of ground sign (202-00810)EACH21$336.55$336.55
17Removal of sign panel (202-00821)EACH2$140.24$140.24
18Removal of traffic signal head (202-00831)EACH27$138.13$138.13
19Removal of traffic signal pole (202-00840)EACH4$3,397.88$3,397.88
20Removal of traffic signal controller cabinet (202-00855)EACH2$1,099.48$1,099.48
21Removal of pedestal pole (202-00858)EACH2$1,657.50$1,657.50
22Removal of fence (202-01000)LF752$2.80$2.80
23Removal of guardrail type 3 (202-01130)LF1,027$3.91$3.91
24Removal of end anchorage (202-01300)EACH5$457.62$457.62
25Clean culvert (202-04002)EACH5$3,315.00$3,315.00
26Clean inlet (202-04010)EACH1$773.50$773.50
27Sawing asphalt material (10 inch) (202-05030)LF7,535$3.45$3.45
28Unsuitable material (203-00050)CY1,070$38.98$38.98
29Embankment material (complete in place) (203-00060)CY39,220$48.24$45.93
30Embankment material (complete in place) (special) (203-00062)CY206$64.83$64.83
31Embankment material (complete in place) (R40) (203-00066)CY864$65.67$65.67
32Potholing (203-01597)HR200$334.64$334.64
33Structure excavation (206-00000)CY1,502$49.93$49.93
34Structure excavation (special) (206-00010)CY118$231.69$240.39
35Structure backfill (flow-fill) (206-00065)CY154$1,877.68$371.61
36Structure backfill (class 1) (206-00100)CY1,346$75.29$75.29
37Mechanical reinforcement of soil (206-00360)CY596$16.51$13.37
38Filter material (special) (206-00505)CY116$158.56$124.35
39Filter material (class A) (206-00510)CY56$160.17$160.17
40Shoring (area 3) (206-01783)LS1$32,343$32,343
41Shoring (area 4) (206-01784)LS1$23,689$23,690
42Stockpile topsoil (207-00210)CY16,000$5.73$5.73
43Stockpile wetland topsoil (207-00310)CY1,016.40$44.23$44.23
44Topsoil (onsite) (207-00700)CY16,000$11.59$11.59
45Topsoil (wetland) (207-00703)CY1,016.40$27.01$27.01
46Subgrade soil preparation (207-00704)SY61,178$1.30$1.30
47Erosion log type 1 (12 inch) (208-00002)LF4,005$5.22$5.22
48Silt fence (208-00020)LF7,000$1.39$1.39
49Silt fence (reinforced) (208-00021)LF100$3.59$6.10
50Aggregate bag (208-00035)LF150$12.53$9.12
51Concrete washout structure (208-00045)EACH2$9,009.47$9,009.47
52Pre-fabricated concrete washout structure (type 1) (208-00046)EACH4$2,806.51$2,806.51
53Storm drain inlet protection (type I) (208-00051)LF200$12.53$9.12
54Storm drain inlet protection (type II) (208-00052)LF100$45.57$41.58
55Pre-fabricated vehicle tracking pad (208-00075)EACH7$14,293$12,683
56Erosion control management (208-00200)LS1$168,282$168,282
57Reset pre-fabricated vehicle tracking pad (210-00075)EACH4$1,965.57$1,965.57
58Reset ground sign (210-00810)EACH12$224.37$224.37
59Reset traffic signal head (210-00831)EACH8$1,353.63$1,353.63
60Reset traffic signal controller cabinet (210-00855)EACH2$9,779.25$9,779.25
61Reset intersection detection system (camera) (210-00890)EACH4$1,685.13$1,685.13
62Relay riprap (210-02900)CY310$160.94$160.94
63Adjust manhole (210-04010)EACH1$6,439.48$6,439.48
64Dewatering (boulder county) (211-03005)LS0.46$141,184$160,208
65Dewatering (cdot) (211-03005)LS0.42$141,184$160,208
66Dewatering (RTD) (211-03005)LS0.12$141,184$160,208
67Organic fertilizer (212-00700)LB5,056$0.91$0.91
68Compost (mechanically applied) (212-00701)CY306$91.13$91.13
69Biotic soil amendments (hydraulically applied) (212-00702)LB8,504$1.20$1.37
70Mycorrhizae (212-00704)LB252.80$11.39$24.49
71Seeding (native) drill (212-00706)ACRE10.20$592.37$535.42
72Seeding (native) hydraulic (212-00707)ACRE2.40$1,258.79$1,258.79
73Seeding (wetland) broadcast (212-00711)ACRE0.60$2,141.66$2,141.66
74Mulching (weed free straw) (213-00004)ACRE10.20$1,150.57$1,150.57
75Spray-on mulch blanket (213-00012)ACRE2.40$3,987.12$3,987.12
76Mulch tackifier (213-00061)LB2,040$3.91$3.91
77Rock mulch (weed free) (213-00067)SF2,364$5.40$5.40
78Bonded fiber matrix (213-00150)ACRE5$3,987.12$3,987.12
79Landscape boulder (213-00700)EACH33$985.38$985.38
80Soil retention blanket (straw-coconut) (biodegradable class 1) (216-00201)SY6,776$2.41$2.41
81Soil retention blanket (straw-coconut) (biodegradable class 2) (216-00202)SY1,767$2.41$2.96
82Turf reinforcement mat (class 2) (216-00302)SY458$5.41$7.72
83Herbicide treatment (217-00020)HR40$143.51$143.51
84Noxious weed management (218-00000)LS1$47,115$29,106
85Wildlife biologist (240-00000)HR16$149.25$149.25
86Removal of nests (240-00010)HR40$143.51$143.51
87Prairie dog management (240-00100)LS1$68,034$29,717
88Aggregate base course (class 6) (304-06007)CY4,344$105.42$105.42
89Aggregate base course (class 6) (special) (304-06008)CY293$132.06$132.06
90Hot mix asphalt (patching) (asphalt) (403-00720)TON421$357.58$357.58
91Hot mix asphalt (grading S) (100) (PG 64- 22) (403-33841)TON4,657$118.31$126.40
92Hot mix asphalt (grading SX) (100) (PG 64- 28) (403-34851)TON1,514$155.14$159.89
93Furnish concrete pavement (412-00000)CY35$231.51$453.95
94Concrete pavement (10-1/2 inch) (412-01050)SY1,493$136.10$136.10
95Geomembrane (420-00000)SY303$14.62$23.75
96Geotextile (erosion control) (class 1) (420-00102)SY79$22.84$25.95
97Drilled shaft (18 inch) (503-00018)LF25$497.25$497.25
98Drilled shaft (24 inch) (503-00024)LF10$574.60$574.60
99Drilled shaft (36 inch) (503-00036)LF164$729.73$858.54
100Drilled shaft (42 inch) (503-00042)LF225$854.62$872.28
101Crosshole sonic logging testing (503-00310)EACH10$2,210.00$2,210.00
102Precast panel facing (504-04420)SF1,258$131.82$131.82
103Soil nail wall (504-06400)SF3,468$153.74$157.86
104Verification testing (504-06410)EACH5$2,821.76$2,821.76
105Stone landscape wall (504-08050)SF100$214.06$214.06
106Riprap (9 inch) (506-00209)CY41$288.76$288.76
107Riprap (12 inch) (506-00212)CY391$151.78$151.78
108Soil riprap (12 inch) (506-00412)CY82$235.35$235.35
109Void-filled riprap (506-00700)CY100$214.26$214.26
110Concrete slope and ditch paving (reinforced) (507-00100)CY13$1,619.92$1,619.92
111Concrete lined ditch (507-00555)CY163$959.67$959.67
112Structural steel (509-00000)LB8,056$6.04$6.04
113Bearing device (type II) (512-00102)EACH8$1,960.28$1,960.28
114Bridge drain (special) (513-00690)EACH6$11,478$11,478
115Pedestrian railing (steel)(special) (514-00201)LF803$207.59$207.59
116Hand and bikeway railing (514-01050)LF207$207.92$207.92
117Concrete sealer (515-00400)SY514$16.41$16.41
118Bridge expansion device (0-4 inch) (518-01004)LF56$647.03$647.03
119Concrete class B (601-01000)CY4$2,710.16$2,710.16
120Concrete class D (miscellaneous) (601-03020)CY112$1,371.99$1,342.28
121Concrete class D (miscellaneous) (colored) (601-03025)CY101$1,104.09$2,198.77
122Concrete class D (box culvert) (601-03030)CY103$1,628.39$1,616.21
123Concrete class D (bridge) (601-03040)CY336$1,741.30$1,782.10
124Concrete class D (wall) (601-03050)CY129$1,599.95$1,616.35
125Structural concrete coating (601-40301)SF18,016$1.66$1.77
126Structural concrete coating (anti-graffiti) (601-40302)SF18,016$1.77$1.77
127Reinforcing steel (epoxy coated) (602-00020)LB103,172$1.36$1.36
128Culvert lining (31X17 inch) (uvcip) (603-00000)LF140$407.63$407.63
12918 inch reinforced concrete pipe (complete in place) (603-01185)LF784$180.53$180.53
13024 inch reinforced concrete pipe (complete in place) (603-01245)LF220$224.97$222.31
13136 inch reinforced concrete pipe (complete in place) (603-01365)LF232$319.14$313.29
13218 inch reinforced concrete end section (603-05018)EACH8$3,286.84$2,982.97
13324 inch reinforced concrete end section (603-05024)EACH6$3,554.25$3,250.38
1346 inch plastic pipe (603-50006)LF245$41.74$42.00
13510 inch plastic pipe (603-50010)LF50$97.58$95.11
136Inlet type C (5 foot) (604-00305)EACH3$11,800$11,831
137Inlet type D (5 foot) (604-00505)EACH1$11,582$13,042
138Inlet type D (10 foot) (604-00510)EACH2$11,836$13,297
139Inlet type 13 (triple) (5 foot) (604-13605)EACH1$18,105$18,129
140Inlet special (5 foot) (604-19005)EACH2$5,847.63$3,352.21
141Inlet type R L 5 (5 foot) (604-19105)EACH1$14,547$14,568
142Inlet type R L 10 (5 foot) (604-19205)EACH1$20,491$18,884
143Inlet type R L 10 (10 foot) (604-19210)EACH1$20,491$22,138
144Inlet special (trench drain) (12 inch width) (604-19712)LF7$6,057.86$865.41
145Outlet structure (detention basin) (604-20000)EACH1$50,601$50,879
146Detention basin forebay (includes energy dissipator) (604-20015)EACH3$18,080$17,982
147Manhole slab base (10 foot) (604-30010)EACH4$12,986$13,080
148Manhole slab base (15 foot) (604-30015)EACH1$15,730$15,730
149Pipe edge drain (special) (605-82105)LF456$49.87$49.87
150Geocomposite drain without pipe (605-83001)SY58$119.49$128.93
151Guardrail type 3 (31 inch midwest guardrail system) (606-00302)LF2,688$40.63$40.74
152Guardrail type 9 (style CE) (606-00940)LF439$391.09$402.19
153End anchorage type 3D (606-01340)EACH2$1,757.96$1,668.66
154Transition type 3L (606-01395)EACH2$2,243.49$2,288.13
155End anchorage (nonflared) (606-02003)EACH2$4,431.16$4,464.65
156Fence (plastic) (607-11525)LF1,100$2.03$2.03
157Fence (special) (prairie dog fence) (607-11530)LF345$132.27$132.27
158Fence chain link (special) (607-53005)LF398$61.81$61.81
159Fence chain link (42 inch) (607-53142)LF95$47.22$47.22
160Concrete sidewalk (6 inch) (608-00006)SY2,058$76.31$76.31
161Concrete curb ramp (608-00010)SY293$228.19$228.19
162Detectable guidance directional indicator (608-00014)SF9$221.00$221.00
163Detectable warnings (608-00015)SF60$207.54$207.54
164Concrete bikeway (6 inch) (608-00026)SY8,114$73.28$73.28
165Concrete bikeway (special) (608-00040)SY648$148.45$148.45
166Concrete sidewalk (colored) (608-00350)SY84$132.74$132.74
167Curb and gutter type 2 (section II-M) (special) (609-20004)LF16$105.45$105.45
168Curb type 2 (section B) (609-20010)LF35$50.49$50.49
169Curb and gutter type 2 (section I-B) (609-21010)LF987$36.07$36.07
170Curb and gutter type 2 (section I-M) (special) (609-21013)LF104$45.34$45.34
171Curb and gutter type 2 (section II-B) (609-21020)LF774$41.70$41.70
172Curb and gutter type 2 (section II-M) (609-21021)LF20$47.12$47.12
173Curb and gutter type 2 (section II-B) (special) (609-21023)LF746$130.32$130.32
174Curb and gutter type 2 (section I-B) (special) (609-21110)LF602$106.78$106.78
175Gutter type 2 (special) (609-24000)LF283$48.43$48.43
176Gutter type 2 (2 foot) (609-24002)LF80$66.83$66.83
177Gutter type 2 (8 foot) (609-24008)LF48$176.84$176.84
178Curb type 4 (section M) (609-40011)LF22$35.90$35.90
179Median cover material (4 inch patterned concrete) (610-00024)SF6,864$22.38$22.38
180Median cover material (stone) (610-00055)SF3,150$4.81$6.23
181Delineator (type I) (612-00001)EACH33$56.09$56.09
182Delineator (type II) (612-00002)EACH21$56.09$56.09
183Delineator (type III) (612-00003)EACH1$56.09$56.09
184Location marker (fiber optic)(dome) (612-00260)EACH5$176.80$187.85
1851/2 inch electrical conduit (613-00050)LF825$44.20$46.41
1863/4 inch electrical conduit (613-00075)LF160$123.76$123.76
1872 inch electrical conduit (bored) (613-00206)LF2,255$23.21$23.21
1883 inch electrical conduit (bored) (613-00306)LF3,590$28.73$28.73
1893/4 inch electrical conduit (plastic) (613-01075)LF210$14.37$14.37
1901 inch electrical conduit (plastic) (613-01100)LF355$17.68$17.68
1911-1/2 inch electrical conduit (plastic) (613-01150)LF20$19.89$22.10
1922 inch electrical conduit (plastic) (613-01200)LF10,420$17.68$17.68
1933 inch electrical conduit (plastic) (613-01300)LF200$23.21$23.21
194Electrical conduit (plastic)(multiduct)(bored) (3-2") (613-03492)LF270$35.36$35.36
1951-1/4 inch electrical conduit (liquidtight flexible metal) (613-04125)LF8$138.13$138.13
196Type two pull box (613-07002)EACH56$1,574.63$1,640.93
197Type three pull box (613-07003)EACH3$2,071.88$2,165.80
198Type four pull box (613-07004)EACH27$3,171.35$3,287.38
199Type five pull box (613-07005)EACH2$4,127.18$4,292.93
200Wiring boulder county (613-10000)LS1$40,195$54,815
201Wiring cdot (613-10000)LS1$177,236$177,236
202Wiring RTD (613-10000)LS1$78,289$78,289
203Luminaire (LED) (special) (613-13000)EACH28$10,912$10,912
204Luminaire (LED) (3,000 lumens) (613-13007)EACH4$839.80$1,005.55
205Luminaire (LED) (8,000 lumens) (613-13008)EACH18$1,906.13$2,033.20
206Luminaire (LED) (11,000 lumens) (613-13011)EACH23$1,906.13$2,033.20
207Luminaire (LED) (14,000 lumens) (613-13014)EACH28$674.05$1,016.60
208Luminaire (special) (613-16000)EACH3$2,281.83$2,342.60
209Light standard steel (25 foot) (613-32250)EACH9$4,199.00$4,199.00
210Light standard steel (25 foot) (2-arm) (613-32252)EACH7$4,392.38$4,392.38
211Light standard steel (40 foot) (613-32400)EACH27$4,668.63$4,768.08
212Light standard metal (14 foot) (613-34140)EACH18$3,530.48$3,530.48
213Light standard metal (15 foot) (613-34150)EACH4$3,530.48$885.11
214Concrete foundation pad (bike shelter) (613-40000)EACH1$9,647.71$9,647.71
215Concrete foundation pad (power pedestals) (613-40000)EACH6$5,210.08$5,491.85
216Light standard foundation (613-40010)EACH65$4,944.88$4,944.88
217Meter power pedestal (boulder county LTG) (613-50109)EACH2$13,592$13,592
218Meter power pedestal (cdot ITS) (613-50109)EACH1$12,404$12,404
219Meter power pedestal (cdot LTG) (613-50109)EACH1$14,332$14,332
220Meter power pedestal (cdot signals) (613-50109)EACH1$13,293$13,293
221Meter power pedestal (RTD LTG) (613-50109)EACH1$15,724$15,967
222Control center box (613-50125)EACH14$2,016.63$2,016.63
223Local control station (613-50127)EACH1$11,934$12,431
224Temporary lighting (solar) (613-50211)EACH4$5,497.38$5,497.38
225Safety switch NEMA 3R, 30 ampere, 2- pole, 240 volt (613-81699)EACH2$1,475.18$1,475.18
226Sign panel (class I) (614-00011)SF212$33.66$33.66
227Sign panel (class I) (wayfinding) (614-00011)SF262$147.76$147.76
228Sign panel (class II) (614-00012)SF367$44.87$44.87
229Sign panel (special) (gate marker - PNR ID sign) (614-00037)EACH2$38,679$38,679
230Sign panel (special) (mile marker) (614-00037)EACH18$3,305.31$3,305.31
231Sign panel (special) (NZMS) (614-00037)EACH3$1,892.62$1,892.62
232Sign panel (special) (pylon) (614-00037)EACH6$20,237$20,237
233Sign panel (special) (wayfinding type C) (614-00037)EACH7$5,234.04$8,552.01
234Sign panel (special) (wayfinding type D) (614-00037)EACH3$5,116.81$7,547.88
235Sign panel (special) (wayfinding) (614-00037)EACH67$1,781.27$1,781.27
236Steel signpost (2X2 inch tubing) (614-00216)LF1,137$27.90$9.64
237Steel signpost (2.5X2.5 inch tubing) (614-00220)LF312$14.73$26.09
238Steel sign support (2-inch round)(post) (614-01512)LF207$56.09$44.81
239Steel sign support (2-inch round)(socket) (614-01522)EACH19$448.73$481.50
240Steel sign support (2-1/2 inch round NP- 40)(post) (614-01575)LF281$56.09$56.09
241Steel sign support (2-1/2 inch round NP- 40)(slipbase) (614-01578)EACH38$673.10$673.10
2421310NM SFP optic module (614-70024)EACH4$723.78$723.78
2431310NM SFP optic module (hpe aruba J4859D 10KM) (614-70024)EACH4$723.78$723.78
2441310NM SFP optic module (hpe aruba J4860D 70KM) (614-70024)EACH4$723.78$723.78
245CWDM SFP optic module (614-70028)EACH3$1,547.00$1,547.00
246Optical attenuator (614-70030)EACH15$491.73$491.73
247Optical filter (614-70032)EACH10$1,663.03$1,663.03
248Pedestrian signal face (16) (countdown) (614-70150)EACH9$1,044.23$1,044.23
249Accessible pedestrian signal (614-70200)EACH8$2,873.00$2,873.00
250Traffic signal face (12-12-12) cdot (614-70336)EACH22$1,723.80$1,723.80
251Traffic signal face (12-12-12) RTD (614-70336)EACH3$1,867.45$1,867.45
252Blank out sign(LED)(single faced) (614-72740)EACH1$4,674.15$4,674.15
253Communications cabinet (614-72830)EACH3$38,316$38,316
254Communications cabinet (type 2) (614-72832)EACH1$26,990$26,990
255Traffic signal controller cabinet (614-72855)EACH2$46,852$46,852
256Pedestrian push button post assembly (614-72863)EACH1$1,668.55$1,668.55
257Fire preemption unit (614-72864)EACH4$4,773.60$4,773.60
258Emergency telephone (614-72894)EACH3$5,552.63$5,552.63
259Flashing beacon (solar powered) (614-80001)EACH4$9,143.88$9,143.88
260Traffic signal-light pole steel (2 mast arm) (614-81020)EACH2$57,460$57,460
261Traffic signal pedestal pole steel (614-84000)EACH5$2,502.83$2,502.83
262Impact attenuator (low maintenance) (614-85003)EACH2$38,688$39,351
263Weather monitoring system (614-86741)EACH1$87,627$87,627
264Fiber optic cable (single mode) (12 fiber) (614-87010)LF1,470$11.05$11.05
265Fiber optic cable (single mode) (24 fiber) (614-87011)LF3,580$11.05$11.05
266Fiber optic termination panel (12 fiber) (614-87012)EACH3$1,768.00$1,768.00
267Fiber optic termination panel (24 fiber) (614-87024)EACH3$2,431.00$2,431.00
268Closed circuit television (614-87320)EACH1$2,099.50$2,210.00
269Closed circuit television (fixed) (614-87320)EACH6$2,707.25$2,873.00
270Closed circuit television (fixed) (2 lens) (614-87320)EACH1$3,038.75$3,204.50
271Closed circuit television (fixed) (for shelter/etel) (614-87320)EACH7$2,221.05$2,320.50
272Closed circuit television (PTZ) (614-87320)EACH2$5,226.65$8,066.50
273Closed circuit television pole (50 feet) (614-87325)EACH1$39,034$39,034
274Test fiber optic cable (614-87350)LS1$37,432$74,864
275Breakaway tapered ITS pole steel (30 feet) (cdot) (614-87400)EACH1$14,243$17,903
276Ethernet switch (RST916P) (614-87690)EACH3$7,641.08$7,641.08
277Ethernet switch type II (3962) (614-87692)EACH1$8,840.00$8,840.00
278Ethernet aggregation switch type II (5142) (614-87698)EACH2$7,679.75$7,679.75
279Embankment protector type 5 (615-00050)EACH1$9,386.80$9,386.80
280Prestressed concrete box (depth less than 32 inches) (618-01992)SF3,576$86.91$86.91
281Detour pavement (621-00450)SY400$107.28$107.28
282Bicycle rack (622-00010)EACH6$967.60$967.60
283Shade shelter (tolar BRT) (31 foot) (622-00100)EACH2$77,187$89,028
284Bench (622-00250)EACH10$2,083.65$2,321.57
285Bollard (622-00270)EACH5$1,822.12$874.32
286Trash receptacle (622-00350)EACH4$1,685.85$2,127.85
287Construction surveying (625-00000)LS1$281,926$370,277
288Construction surveying (lomr requirements) (625-00000)LS1$9,814.61$31,690
289Construction surveying (PWQ) (625-00000)LS1$18,265$19,657
290Mobilization (without autopay) (626-00100)LS1$2,083,577$2,082,603
291Modified epoxy pavement marking (627-00008)GAL213$224.37$224.37
292Pavement marking paint (high build) (cdot) (627-00013)GAL300$84.13$84.13
293Preformed plastic pavement marking (type I)(inlaid) (627-01010)SF2,370$24.69$24.69
294Preformed thermoplastic pavement marking (word-symbol) (627-30405)SF2,690$41.50$41.50
295Preformed thermoplastic pavement marking (xwalk-stop line) (627-30410)SF1,202$15.70$15.70
296Bridge girder and deck unit (180 feet to 185 feet) 37000 37 (628-00180)EACH1$1,145,296$936,537
297Barrier (temporary) (630-80370)LF500$46.09$46.09
298Reset concrete barrier (temporary) (630-80371)LF8,450$20.40$20.40
299Impact attenuator (temporary) (narrow) (630-85010)EACH10$9,899.53$10,409
300Impact attenuator (temporary)(reset only) (630-85013)EACH1$2,838.99$2,838.99
CDOT contract C25960: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of July 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy