CDOT contract C25862 bid tabulation
This project is located in Region 4 in Weld and Morgan County. Project work consists of a concrete overlay and other improvements on CO 71 from MP 192.70 to 201.64. Please contact Dan Mattson at 970-218-2357 for all project related questions. Let by Colorado DOT on May 8, 2025, Morgan and Weld, Region 4. 3 bids received; low bid $3,502,761 by Castle Rock Construction Company of Colorado, LLC, -28% against the engineer's estimate of $4,877,403.
- Owner
- Colorado DOT
- Letting
- 08 MAY 2025
- Pay items
- 81
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Castle Rock Construction Company of Colorado, LLC | $3,502,761 | Low | -28% |
| 2 | W.W. Clyde & Co. | $4,186,216 | +20% | -14% |
| 3 | Concrete Works of Colorado, Inc. | $5,633,480 | +61% | +16% |
Engineer's estimate: $4,877,403.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Castle Rock Construction Company of Colorado, LLC | 2. W.W. Clyde & Co. | 3. Concrete Works of Colorado, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00001) | ACRE | 9.60 | $10,000 | $2,400.01 | $5,000.00 | $4,500.00 |
| 2 | Removal of tree (202-00010) | EACH | 8 | $692.00 | $625.00 | $2,200.00 | $1,500.00 |
| 3 | Removal of asphalt mat (202-00220) | SY | 1,230 | $16.70 | $9.94 | $14.00 | $12.00 |
| 4 | Removal of asphalt mat (planing) (202-00240) | SY | 35,716 | $3.50 | $2.05 | $4.00 | $3.70 |
| 5 | Removal of ground sign (202-00810) | EACH | 15 | $121.80 | $225.00 | $230.00 | $150.00 |
| 6 | Removal of flashing beacon (202-00825) | EACH | 1 | $318.00 | $936.00 | $910.00 | $4,325.00 |
| 7 | Removal of road closure gate (202-01030) | EACH | 1 | $4,000.00 | $6,891.30 | $6,700.00 | $4,400.00 |
| 8 | Clean culvert (202-04002) | EACH | 7 | $3,637.00 | $2,925.00 | $3,000.00 | $5,500.00 |
| 9 | Embankment material (complete in place) (203-00060) | CY | 1,447 | $48.00 | $71.10 | $154.00 | $85.00 |
| 10 | Embankment material (complete in place) (R40) (203-00066) | CY | 100 | $80.00 | $43.49 | $80.00 | $125.00 |
| 11 | Proof rolling (203-01100) | HR | 40 | $124.00 | $125.00 | $230.00 | $155.00 |
| 12 | Blading (203-01500) | HR | 40 | $164.00 | $150.00 | $345.00 | $225.00 |
| 13 | Combination loader (203-01594) | HR | 40 | $192.00 | $150.00 | $265.00 | $195.00 |
| 14 | Potholing (203-01597) | HR | 40 | $282.00 | $437.29 | $220.00 | $235.00 |
| 15 | Structure backfill (class 1) (206-00100) | CY | 1 | $205.00 | $1,000.00 | $100.00 | $250.00 |
| 16 | Topsoil (onsite) (207-00700) | CY | 5,243 | $11.30 | $5.60 | $21.00 | $10.50 |
| 17 | Silt fence (208-00020) | LF | 1,100 | $3.00 | $1.76 | $2.00 | $2.25 |
| 18 | Erosion log type 3 (12 inch) (208-00023) | LF | 1,700 | $7.10 | $8.19 | $7.00 | $7.25 |
| 19 | Aggregate bag (208-00035) | LF | 500 | $15.00 | $8.78 | $8.00 | $7.50 |
| 20 | Pre-fabricated concrete washout structure (type 1) (208-00046) | EACH | 10 | $1,040.00 | $702.00 | $2,000.00 | $5,200.00 |
| 21 | Pre-fabricated vehicle tracking pad (208-00075) | EACH | 2 | $2,325.00 | $1,200.00 | $7,200.00 | $5,500.00 |
| 22 | Removal and disposal of sediment (labor) (208-00103) | HR | 20 | $75.00 | $58.50 | $210.00 | $75.00 |
| 23 | Removal and disposal of sediment (equipment) (208-00105) | HR | 60 | $147.00 | $175.50 | $245.00 | $165.00 |
| 24 | Sweeping (sediment removal) (208-00106) | HR | 40 | $148.00 | $117.00 | $180.00 | $240.00 |
| 25 | Removal of trash (208-00107) | HR | 40 | $125.00 | $58.50 | $225.00 | $150.00 |
| 26 | Erosion control management (208-00207) | DAY | 10 | $390.00 | $292.50 | $400.00 | $1,200.00 |
| 27 | Reset sign panel (210-00815) | EACH | 1 | $400.00 | $146.25 | $142.00 | $350.00 |
| 28 | Organic fertilizer (212-00700) | LB | 1,920 | $1.40 | $0.41 | $1.20 | $1.25 |
| 29 | Compost (mechanically applied) (212-00701) | CY | 624 | $38.00 | $42.71 | $60.00 | $55.00 |
| 30 | Mycorrhizae (212-00704) | LB | 192 | $14.00 | $10.24 | $15.00 | $13.50 |
| 31 | Seeding (native) drill (212-00706) | ACRE | 9.20 | $1,040.00 | $1,152.45 | $1,090.00 | $1,200.00 |
| 32 | Seeding (native) broadcast (212-00708) | ACRE | 0.40 | $3,668.00 | $3,451.50 | $2,160.00 | $1,950.00 |
| 33 | Mulching (weed free straw) (213-00004) | ACRE | 6.90 | $945.00 | $1,111.50 | $1,000.00 | $875.00 |
| 34 | Mulch tackifier (213-00061) | LB | 1,380 | $3.00 | $2.93 | $4.10 | $3.75 |
| 35 | Bonded fiber matrix (213-00150) | ACRE | 7 | $3,643.00 | $4,095.00 | $4,560.00 | $4,100.00 |
| 36 | Soil retention blanket (straw-coconut) (biodegradable class 1) (216-00201) | SY | 13,058 | $3.50 | $2.93 | $3.00 | $3.25 |
| 37 | Herbicide treatment (217-00020) | HR | 20 | $230.00 | $251.55 | $410.00 | $375.00 |
| 38 | Aggregate base course (class 6) (304-06007) | CY | 501 | $100.00 | $88.00 | $150.00 | $110.00 |
| 39 | Aggregate base course (class 7) (special) (304-07010) | CY | 788 | $80.00 | $67.50 | $140.00 | $55.00 |
| 40 | Aggregate base course (recycled asphalt pavement) (304-09102) | CY | 84 | $8.00 | $43.99 | $50.00 | $50.00 |
| 41 | Hot mix asphalt (patching) (asphalt) (403-00720) | TON | 199 | $285.00 | $220.14 | $570.00 | $550.00 |
| 42 | Hot mix asphalt (grading SX) (75) (PG 64- 28) (403-34751) | TON | 229 | $285.00 | $260.09 | $268.00 | $240.00 |
| 43 | Concrete pavement (7 inch) (412-00700) | SY | 35,373 | $87.00 | $56.46 | $57.00 | $102.00 |
| 44 | Riprap (9 inch) (506-00209) | CY | 99 | $200.00 | $140.00 | $250.00 | $275.00 |
| 45 | Geogrid reinforcement (506-01020) | SY | 620 | $5.00 | $4.50 | $4.00 | $3.85 |
| 46 | Culvert lining (24 inch) (603-00026) | LF | 102 | $647.00 | $327.60 | $333.00 | $475.00 |
| 47 | 24 inch corrugated steel pipe (603-10240) | LF | 20 | $200.00 | $859.99 | $320.00 | $110.00 |
| 48 | 24 inch steel end section (603-30024) | EACH | 4 | $2,700.00 | $1,400.00 | $3,000.00 | $725.00 |
| 49 | Fence (plastic) (607-11525) | LF | 500 | $8.00 | $2.98 | $13.00 | $5.50 |
| 50 | Road closure gate (607-60620) | EACH | 1 | $10,020 | $46,800 | $50,000 | $42,500 |
| 51 | Delineator (flexible) (type I) (612-00041) | EACH | 72 | $34.00 | $93.60 | $90.00 | $45.00 |
| 52 | Delineator (flexible) (type III) (612-00043) | EACH | 17 | $35.00 | $93.60 | $90.00 | $55.00 |
| 53 | 2 inch electrical conduit (plastic) (613-01200) | LF | 82 | $30.00 | $81.90 | $80.00 | $95.00 |
| 54 | Type two pull box (613-07002) | EACH | 1 | $1,800.00 | $2,182.05 | $2,130.00 | $2,800.00 |
| 55 | Wiring (613-10000) | LS | 1 | $3,000.00 | $5,850.00 | $5,700.00 | $13,500 |
| 56 | Luminaire (LED) (6,000 lumens) (613-13006) | EACH | 1 | $3,000.00 | $1,316.25 | $1,280.00 | $2,250.00 |
| 57 | Sign panel (class I) (614-00011) | SF | 84 | $27.00 | $28.08 | $27.00 | $42.00 |
| 58 | Sign panel (class II) (614-00012) | SF | 133 | $30.00 | $44.46 | $43.00 | $65.00 |
| 59 | Steel sign support (2-inch round)(post and socket) (614-01503) | EACH | 2 | $520.00 | $368.55 | $350.00 | $585.00 |
| 60 | Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01573) | EACH | 14 | $700.00 | $690.30 | $670.00 | $625.00 |
| 61 | Flashing beacon (614-80000) | EACH | 1 | $4,850.00 | $15,678 | $16,000 | $16,200 |
| 62 | Flashing beacon (solar powered) (614-80001) | EACH | 1 | $160.00 | $15,678 | $16,000 | $16,500 |
| 63 | Rumble strip (614-80385) | LF | 25,084 | $1.00 | $0.35 | $1.00 | $2.50 |
| 64 | Field office (class 2) (620-00002) | EACH | 1 | $50,000 | $23,797 | $40,000 | $22,500 |
| 65 | Field laboratory (class 2) (620-00012) | EACH | 1 | $50,000 | $20,885 | $36,000 | $16,500 |
| 66 | Sanitary facility (620-00020) | EACH | 2 | $3,600.00 | $3,510.00 | $1,500.00 | $2,675.00 |
| 67 | Construction surveying (625-00000) | LS | 1 | $40,000 | $59,670 | $50,000 | $35,000 |
| 68 | Mobilization (626-00000) | LS | 1 | $479,000 | $312,771 | $405,000 | $475,000 |
| 69 | Modified epoxy pavement marking (627-00008) | GAL | 165 | $210.00 | $204.75 | $200.00 | $210.00 |
| 70 | Preformed thermoplastic pavement marking (xwalk-stop line) (627-30410) | SF | 124 | $32.00 | $38.03 | $37.00 | $35.00 |
| 71 | Survey monument (type 3A) (629-01031) | EACH | 6 | $1,800.00 | $3,123.90 | $2,510.00 | $850.00 |
| 72 | Flagging (630-00000) | HR | 200 | $35.00 | $40.95 | $48.00 | $60.00 |
| 73 | Traffic control inspection (630-00007) | DAY | 32 | $133.00 | $351.00 | $450.00 | $375.00 |
| 74 | Traffic control management (630-00012) | DAY | 45 | $550.00 | $1,404.00 | $1,200.00 | $1,850.00 |
| 75 | Barricade (type 3 M-A) (temporary) (630-80335) | EACH | 8 | $155.00 | $234.00 | $114.00 | $275.00 |
| 76 | Construction traffic sign (panel size A) (630-80341) | EACH | 94 | $50.00 | $64.35 | $34.00 | $75.00 |
| 77 | Construction traffic sign (panel size B) (630-80342) | EACH | 4 | $60.00 | $64.35 | $45.00 | $85.00 |
| 78 | Vertical panel (630-80350) | EACH | 20 | $30.00 | $40.95 | $34.00 | $40.00 |
| 79 | Portable message sign panel (630-80355) | EACH | 6 | $5,000.00 | $4,680.00 | $3,420.00 | $4,500.00 |
| 80 | Drum channelizing device (630-80360) | EACH | 25 | $25.00 | $40.95 | $45.00 | $40.00 |
| 81 | Traffic cone (630-80380) | EACH | 100 | $8.00 | $10.53 | $10.00 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of May 8, 2025. Compiled by Mirage Metrics.