CDOT contract C26058 bid tabulation

SEE 'PROJECT SPECIAL - NOTICE TO BIDDERS' FOR PRE-BID MEETING INFORMATION. SH50A CEDAR CREEK CULVERT REPLACE -Replacement of existing arched galvanized corrugated steel plate culvert (8'-4" high x 12'-0" wide). -Detour highway 50 traffic onto existing frontage road while installing double 8x8' concr. Let by Colorado DOT on June 12, 2025, Montrose, Region 3. 4 bids received; low bid $4,999,614 by Ridgway Valley Enterprises, Inc, -34% against the engineer's estimate of $7,616,484.

Owner
Colorado DOT
Letting
12 JUN 2025
Pay items
92
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ridgway Valley Enterprises, Inc$4,999,614Low-34%
2Siete, Inc.$5,896,705+18%-23%
3HANK WILLIAMS, INC. dba WILLIAMS CONSTRUCTION CONTRACTORS$5,916,053+18%-22%
4Myers & Sons Construction, LLC$6,421,923+28%-16%
CDOT contract C26058: bids by rank

Engineer's estimate: $7,616,484.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ridgway Valley Enterprises, Inc2. Siete, Inc.3. HANK WILLIAMS, INC. dba WILLIAMS CONSTRUCTION CONTRACTORS4. Myers & Sons Construction, LLC
1Clearing and grubbing (201-00000)LS1$15,000$44,000$100,000$74,220$85,000
2Removal of headwall (202-00015)EACH1$3,500.00$14,000$15,000$53,763$6,000.00
3Removal of inlet (202-00019)EACH1$3,000.00$9,000.00$10,000$4,211.78$3,000.00
4Removal of slope and ditch paving (202-00026)SY82$75.00$68.00$100.00$71.79$375.00
5Removal of pipe (202-00035)LF134$60.00$110.00$50.00$56.84$120.00
6Removal of pipe (special) (202-00036)LF236$50.00$125.00$200.00$104.48$120.00
7Removal of asphalt mat (202-00220)SY1,871$20.00$54.00$15.00$19.95$25.00
8Removal of asphalt mat (planing) (202-00240)SY1,937$7.00$54.00$15.00$9.41$9.00
9Removal of pavement marking (202-00250)SF2,019$5.00$4.00$6.00$4.57$6.00
10Removal of pavement marking (temporary) (202-00250)SF3,230$5.00$4.00$6.00$4.08$6.00
11Removal of guardrail type 7 (202-01170)LF60$50.00$30.00$35.00$138.39$60.00
12Embankment material (complete in place) (203-00060)CY5,834$60.00$26.00$50.00$55.89$55.00
13Combination loader (203-01594)HR40$175.00$125.00$180.00$233.77$150.00
14Potholing (203-01597)HR30$400.00$275.00$500.00$327.32$400.00
15Laborer (203-02330)HR20$70.00$65.00$60.00$118.85$50.00
16Structure excavation (206-00000)CY11,114$60.00$16.00$50.00$27.17$25.00
17Structure backfill (class 1) (206-00100)CY560$90.00$64.00$60.00$85.02$120.00
18Filter material (class A) (206-00510)CY635$150.00$56.00$100.00$87.39$120.00
19Topsoil (onsite) (207-00700)CY575$30.00$80.00$45.00$20.88$9.00
20Erosion log type 1 (12 inch) (208-00002)LF790$15.00$14.00$10.00$8.70$6.00
21Aggregate bag (208-00035)LF100$20.00$20.00$10.00$16.04$8.00
22Pre-fabricated concrete washout structure (type 1) (208-00046)EACH2$3,000.00$1,400.00$5,000.00$2,622.21$10,000
23Pre-fabricated vehicle tracking pad (208-00075)EACH2$5,000.00$24,000$5,000.00$8,258.14$15,000
24Removal and disposal of sediment (labor) (208-00103)HR20$85.00$115.00$60.00$122.04$50.00
25Removal and disposal of sediment (equipment) (208-00105)HR20$120.00$220.00$135.00$232.47$75.00
26Sweeping (sediment removal) (208-00106)HR20$250.00$125.00$135.00$176.97$135.00
27Removal of trash (208-00107)HR20$100.00$65.00$120.00$232.47$100.00
28Erosion control management (208-00207)DAY208$600.00$700.00$100.00$395.72$75.00
29Reset delineator (210-00090)EACH25$30.00$75.00$75.00$96.96$75.00
30Reset ground sign (210-00810)EACH10$350.00$525.00$75.00$160.67$75.00
31Reset sign panel (210-00815)EACH6$350.00$145.00$75.00$136.17$75.00
32Dewatering (211-03005)LS1$25,000$175,000$500,000$325,421$675,000
33Biotic soil amendments (hydraulically applied) (212-00702)LB3,745$2.00$1.75$3.00$1.76$2.60
34Mycorrhizae (212-00704)LB214$15.00$18.00$11.00$18.02$10.50
35Seeding (native) hydraulic (212-00707)ACRE1.40$4,000.00$1,300.00$1,600.00$1,220.44$1,525.00
36Spray-on mulch blanket (213-00012)ACRE1.30$5,000.00$8,250.00$4,500.00$9,084.92$4,350.00
37Soil retention blanket (straw-coconut) (biodegradable class 1) (216-00201)SY1,076$4.00$4.90$3.00$5.24$2.15
38Wildlife biologist (240-00001)DAY4$1,000.00$2,100.00$1,880.00$2,430.10$1,880.00
39Removal of nests (240-00010)HR10$180.00$325.00$284.00$403.60$135.00
40Aggregate base course (class 1) (304-01000)TON1,063.03$35.00$34.00$46.00$36.35$55.00
41Aggregate base course (class 6) (304-06000)TON720.03$65.00$36.00$60.00$53.02$60.00
42Aggregate base course (class 7) (304-07000)TON269.89$75.00$36.00$75.00$58.38$70.00
43Hot mix asphalt (patching) (asphalt) (403-00720)TON423.84$350.00$260.00$246.00$262.26$225.00
44Hot mix asphalt (grading SX) (100) (403-34801)TON1,322.98$175.00$190.00$180.00$180.90$155.00
45Asphalt cement performance grade (PG 64-28) (411-03342)TON79.38$1,500.00$690.00$655.00$714.78$600.00
46Emulsified asphalt (slow-setting) (411-10255)GAL460$13.00$3.00$2.50$7.81$2.50
47Geotextile (drainage) (class 2) (420-00113)SY852$4.00$15.00$5.00$16.16$5.00
48Geotextile (separator) (class 1) (420-00132)SY926$3.50$15.00$5.00$21.09$6.00
49Riprap (12 inch) (506-00212)CY710$170.00$180.00$182.00$263.58$250.00
50Concrete slope and ditch paving (reinforced) (507-00100)CY1.30$2,000.00$1,800.00$1,500.00$6,179.11$2,500.00
51Provide temporary support (509-08100)LS1$700,000$80,000$700,000$425,702$646,850
52Waterproofing (membrane) (515-00120)SY921$50.00$60.00$26.00$28.76$34.65
53Concrete class D (box culvert) (601-03030)CY47$2,500.00$1,500.00$1,300.00$4,952.26$1,250.00
54Concrete class D (wall) (601-03050)CY129$2,700.00$1,450.00$1,100.00$3,628.89$1,050.00
55Reinforcing steel (602-00000)LB25,444$3.00$1.75$2.00$5.97$2.00
56Reinforcing steel (epoxy coated) (602-00020)LB10,505$3.00$2.25$2.50$8.29$2.50
5718 inch corrugated steel pipe (603-10180)LF40$150.00$100.00$210.00$206.01$350.00
588X8 foot concrete box culvert (precast) (603-70808)LF384$6,000.00$2,950.00$1,700.00$1,384.16$2,900.00
59Inlet type C (10 foot) (604-00310)EACH1$8,000.00$14,000$20,000$11,664$13,500
60Guardrail type 3 (31 inch midwest guardrail system) (606-00302)LF575$50.00$80.00$46.00$56.85$40.00
61End anchorage type 3D (606-01340)EACH1$3,500.00$5,000.00$2,000.00$2,692.13$4,500.00
62End anchorage (flared) (606-02005)EACH3$5,000.00$7,800.00$4,100.00$5,133.01$4,400.00
63Sanitary facility (620-00020)EACH1$4,500.00$5,600.00$11,000$23,246$8,500.00
64Detour pavement (621-00450)SY2,300$90.00$79.50$170.00$139.73$110.00
65Detour drainage pipe (class 0) (624-20300)LF520$100.00$110.00$131.00$38.18$330.00
66Construction surveying (625-00000)LS1$30,000$36,000$25,000$61,638$110,000
67Construction surveying (pointman) (625-00000)LS1$30,000$28,000$20,000$5,082.05$50,000
68Construction surveying (hourly) (625-00001)HR40$300.00$275.00$145.00$275.33$200.00
69Mobilization (626-00000)LS1$700,000$475,000$580,000$628,670$640,000
70Public information services (tier III) (626-01103)LS1$10,000$110,000$17,000$22,586$30,000
71Modified epoxy pavement marking (627-00008)GAL30$300.00$80.00$325.00$255.83$325.00
72Pavement marking paint (high build)(temporary) (627-00016)GAL71$85.00$24.00$165.00$63.81$165.00
73Survey monument (type 6) (629-01006)EACH2$800.00$800.00$3,500.00$584.40$750.00
74Survey monument (type 1A) (629-01011)EACH1$400.00$1,200.00$4,000.00$2,145.84$1,250.00
75Flagging (630-00000)HR200$45.00$56.00$32.00$37.38$32.00
76Traffic control inspection (630-00007)DAY83$300.00$600.00$550.00$644.18$550.00
77Traffic control management (630-00012)DAY208$1,200.00$1,200.00$1,400.00$1,629.39$1,400.00
78Barricade (type 3 M-A) (temporary) (630-80335)EACH10$200.00$180.00$150.00$235.57$150.00
79Barricade (type 3 M-D) (temporary) (630-80338)EACH10$500.00$720.00$150.00$235.57$150.00
80Construction traffic sign (panel size A) (630-80341)EACH126$90.00$24.00$25.00$39.27$25.00
81Construction traffic sign (panel size B) (630-80342)EACH30$115.00$24.00$25.00$37.90$25.00
82Construction traffic sign (special) (630-80344)SF96$30.00$36.00$20.00$30.90$20.00
83Portable message sign panel (630-80355)EACH4$9,500.00$13,600$3,000.00$3,854.45$3,000.00
84Advance warning flashing or sequencing arrow panel (C type) (630-80358)EACH2$2,500.00$4,600.00$2,500.00$3,028.18$2,500.00
85Drum channelizing device (630-80360)EACH300$60.00$24.00$50.00$63.02$50.00
86Drum channelizing device (with light) (steady burn) (630-80364)EACH40$75.00$48.00$50.00$82.61$50.00
87Concrete barrier (temporary) (furnish and install) (630-80372)LF855$160.00$82.00$120.00$86.30$130.00
88Delineator (type I) (temporary) (630-80401)EACH45$28.00$66.00$75.00$270.91$75.00
89Delineator (type II) (temporary) (630-80402)EACH15$30.00$66.00$80.00$96.95$80.00
90Delineator (type III) (temporary) (630-80403)EACH10$31.00$66.00$85.00$106.15$85.00
91Portable rumble strips (temporary) (630-80440)EACH12$1,750.00$1,650.00$400.00$526.18$400.00
92Impact attenuator (temporary) (630-85010)EACH4$10,000$2,750.00$1,200.00$1,517.34$1,200.00
CDOT contract C26058: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of June 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy