FDOT contract T2A32 bid tabulation

DISTRICT WIDE RUMBLE STRIPING AT VARIOUS. Let by Florida DOT on July 30, 2025, Alachua, Baker,, District 2. 2 bids received; low bid $1,287,630 by TRP Construction Group, LLC.

Owner
Florida DOT
Letting
30 JUL 2025
Pay items
15
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1TRP Construction Group, LLC$1,287,630Low
2McShea Contracting, LLC$1,478,498+15%
FDOT contract T2A32: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. TRP Construction Group, LLC2. McShea Contracting, LLC
0005Mobilization (0101-1)LS1$80,000$70,000
0010Maintenance of traffic (0102-1)DA1$115,000$29,000
0015Traffic control officer (0102-14)HR480$135.00$125.00
0020Work zone sign (0102-60)ED2,880$0.60$0.50
0025Arrow board / advance warning arrow panel (0102-76)ED240$18.00$15.00
0030Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000
0035Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM288.57$1,150.00$1,200.00
0040Raised pavement marker, type B (0706-1-3)EACH9,993$4.25$7.00
0045Painted pavement markings, surface (0710-90)LS1$135,000$213,500
0050Thermoplastic, refurbishment, yellow, solid, 6" (0711-12201)GM46.70$2,350.00$3,500.00
0055Thermoplastic, refurbishment, yellow, skip, 6" (0711-12231)GM8.73$1,500.00$1,100.00
0060Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM16.65$4,200.00$5,700.00
0065Thermoplastic, standard-open graded asphalt surfaces, yellow, skip, 6" (0711-15231)GM1.53$2,600.00$1,600.00
0070Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM68.87$3,350.00$5,000.00
0075Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM16.68$2,100.00$1,200.00
FDOT contract T2A32: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy