FDOT letting results, July 30, 2025
21 contracts let by Florida DOT on July 30, 2025, $127,701,435 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 21
- Low bids, total
- $127,701,435
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5860 | SR 9 (I-95) FROM S OF SR 50 TO SR 46 | District 5 | 5 | Masci General Contractors, Inc | $29,845,663 | $32,770,002 | +10% | FDOT |
| T4736 | SR 27 (US 27) AT I-75/US 27 INTERCHANGE | District 4 | 7 | Prince Contracting, LLC. | $20,985,425 | $22,688,237 | +8.0% | FDOT |
| T3973 | SR 85 (EGLIN PKWY) FROM SR 30 (US 98) TO RICHBOURG AVE | District 3 | 2 | C.W. Roberts Contracting, Inc. | $11,618,014 | $12,053,835 | +4.0% | FDOT |
| T1921 | SR 400 (I-4) FROM GALLOWAY RD TO SR 35 (US 98) | District 1 | 4 | C.W. Roberts Contracting, Inc. | $10,463,011 | $10,834,163 | +4.0% | FDOT |
| T4674 | SR 80 (SOUTHERN BLVD RAMPS) AT SR 7 (US 441) | District 4 | 4 | General Asphalt Company, LLC | $8,259,855 | $9,400,901 | +14% | FDOT |
| T4716 | SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD | District 4 | 8 | General Asphalt Company, LLC | $5,935,381 | $6,023,042 | +1.0% | FDOT |
| T6599 | SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL | District 6 | 6 | Aum Construction Inc. | $5,847,847 | $5,894,803 | +1.0% | FDOT |
| T2A30 | SR 20 (US 441 / MARTIN LUTHER KING MEMORIAL HWY) FROM NW 167 | District 2 | 4 | Anderson Columbia Co., Inc. | $5,779,222 | $5,993,011 | +4.0% | FDOT |
| T5819 | SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH | District 5 | 8 | Ranger Construction Industries, Inc. | $4,961,103 | $5,837,035 | +18% | FDOT |
| T7574 | SR 93 (I-75), 93A (I-275) and SR 400 (I-4) FROM MANATEE/PI.. | District 7 | 6 | Traffic Management Solutions, LLC | $4,370,000 | $4,701,504 | +8.0% | FDOT |
| T3940 | SR 61 (US 319 / CRAWFORDVILLE RD) FROM S OF SR 61 SB TO... | District 3 | 4 | C.W. Roberts Contracting, Inc. | $4,249,828 | $4,588,356 | +8.0% | FDOT |
| T5871 | SR 519 (FISKE BLVD) AT LEVITT PKWY / LAKEMOOR BLVD AND FROM | District 5 | 2 | Carr Construction, LLC | $3,664,708 | $4,622,619 | +26% | FDOT |
| T4648 | SR 84 AT WESTON ROAD | District 4 | 5 | Weekley Asphalt Paving, Inc. | $3,189,222 | $3,299,540 | +3.0% | FDOT |
| T5859 | SR 500 (US 441 / ORANGE BLOSSOM TR) AT CLARCONA-OCOEE RD | District 5 | 5 | American Design Engineering Construction Inc. | $2,732,458 | $2,899,803 | +6.0% | FDOT |
| T4726 | UTOPIA DR FROM RIVIERA BLVD TO SR 824 (PEMBROKE RD) | District 4 | 6 | Pedrail Systems LLC | $1,400,000 | $1,481,919 | +6.0% | FDOT |
| T2A32 | DISTRICT WIDE RUMBLE STRIPING AT VARIOUS | District 2 | 2 | TRP Construction Group, LLC | $1,287,630 | $1,478,498 | +15% | FDOT |
| T4720 | I-95 RAMP AT SR 704 (OKEECHOBEE BLVD), SR 786 (PGA BLVD) AND | District 4 | 3 | Ranger Construction Industries, Inc. | $1,218,236 | $1,343,070 | +10% | FDOT |
| T4733 | SR 9 (I-95) NB EXIT RAMP TO WB SR 68 (ORANGE AVE) | District 4 | 4 | C.W. Roberts Contracting, Inc. | $840,956 | $870,928 | +4.0% | FDOT |
| T2A31 | SR 10 (ATLANTIC BLVD) FROM E OF LAURINA ST TO SILVERSMITH... | District 2 | 5 | Janus Construction Corp. | $541,819 | $606,087 | +12% | FDOT |
| T1927 | WEST MAIN ST FROM HANCHEY RD TO W OF FLORIDA AVE | District 1 | 6 | Garcia Civil Contractors | $414,963 | $437,258 | +5.0% | FDOT |
| T3A07 | SR 300 OVER ST GEORGE SOUND (BRIDGE NO 490100) | District 3 | 4 | Webber Infrastructure Management, Inc. | $96,095 | $155,700 | +62% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.