FDOT contract T5819 bid tabulation

SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH. Let by Florida DOT on July 30, 2025, Lake, District 5. 8 bids received; low bid $4,961,103 by Ranger Construction Industries, Inc..

Owner
Florida DOT
Letting
30 JUL 2025
Pay items
88
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ranger Construction Industries, Inc.$4,961,103Low
2Watson Civil Construction, Inc.$5,837,035+18%
3Superior Asphalt, Inc.$5,972,001+20%
4Pigott Asphalt and Sitework LLC$6,987,739+41%
5Sema Construction, Inc.$7,310,000+47%
6Hubbard Construction Company$7,352,437+48%
7Southern Development & Construction, Inc.$7,426,000+50%
8Atlantic Civil Constructors Corp$7,452,965+50%
FDOT contract T5819: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ranger Construction Industries, Inc.2. Watson Civil Construction, Inc.3. Superior Asphalt, Inc.4. Pigott Asphalt and Sitework LLC5. Sema Construction, Inc.6. Hubbard Construction Company
0005Mobilization (0101-1)LS1$488,600$580,000$606,272$1,099,000$730,000$735,000
0010Maintenance of traffic (0102-1)DA1$501,326$771,000$534,000$390,000$750,000$1,536,000
0015Special detour- temporary pavement (0102-2200)SY1$37,500$57,000$46,000$100,000$180,000$175,000
0020Special detour- temporary earthwork/base (0102-2300)CY1$30,800$45,000$14,675$50,000$120,000$75,000
0025Commercial material for temporary driveway maintenance (0102-3)CY59.30$99.20$160.00$176.00$100.00$200.00$146.20
0030Work zone sign (0102-60)ED3,246$0.20$0.30$0.25$0.35$0.30$0.22
0035Temporary barrier, F&I, anchored (0102-71-15)LF1,750$42.20$38.50$46.00$39.00$50.00$41.76
0040Temporary barrier, relocate, anchored (0102-71-25)LF4,575$17.80$16.20$19.00$22.00$20.00$17.13
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED16,990$0.10$0.12$0.10$0.05$0.10$0.09
0050Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH3,428$4.45$4.35$4.70$5.00$5.50$4.00
0055Temporary crash cushion, redirective option (0102-89-1)LO24$2,380.00$1,100.00$1,290.00$1,500.00$1,500.00$1,100.00
0060Type III barricade (0102-115)ED2,178$0.40$0.52$0.35$1.00$0.40$0.28
0065Temporary raised rumble per day, includes all sets and relocations (0102-909)DA130$31.10$29.00$33.00$75.00$30.00$28.00
0070Sediment barrier (0104-10-3)LF9,539$2.25$1.20$1.50$3.00$1.10$2.37
0075Staked turbidity barrier- nylon reinforced PVC (0104-12)LF796$8.50$6.15$5.70$25.00$5.00$9.73
0080Inlet protection system (0104-18)EACH13$222.20$225.00$147.00$250.00$230.00$250.09
0085Litter removal (0107-1)ACRE49.08$77.80$120.00$37.00$10.00$65.00$100.00
0090Mowing (0107-2)ACRE54.41$100.00$150.00$240.00$100.00$100.00$150.00
0095Clearing & grubbing (0110-1-1)ACRE1$104,411$296,000$166,000$150,000$513,017$350,000
0100Removal of existing concrete (0110-4-10)SY189$15.60$46.00$70.50$60.00$38.00$29.85
0105Regular excavation (0120-1)CY2,460.50$16.00$15.00$47.00$30.00$60.00$32.17
0110Subsoil excavation (0120-4)CY138.10$332.50$69.00$47.00$100.00$120.00$81.91
0115Embankment (0120-6)CY1,510.80$4.35$10.00$44.60$30.00$70.00$35.07
0120Type B stabilization (0160-4)SY8,587$13.45$29.00$21.15$20.00$25.00$24.59
0125Optional base, base group 02 (0285-702)SY254$58.60$100.00$35.20$30.00$25.00$28.01
0130Optional base, base group 03 (0285-703)SY82$87.60$180.00$35.20$150.00$25.00$37.67
0135Optional base, base group 04 (0285-704)SY6,002$29.25$30.00$39.45$30.00$32.00$23.78
0140Optional base, base group 10 (0285-710)SY3,731$24.35$43.00$44.60$70.00$34.00$29.34
0145Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY13,744$4.00$4.95$4.75$5.00$5.00$8.83
0150Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY2,249$12.95$4.65$4.45$5.00$5.00$11.31
0155Superpave asphaltic conc, traffic E (0334-1-15)TN1,796.30$138.70$181.00$173.25$190.00$190.00$250.97
0160Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88)TN1,902$155.50$206.00$197.00$250.00$210.00$244.02
0165Miscellaneous asphalt (0339-1)TN83.80$332.50$393.00$376.75$350.00$450.00$336.56
0170Concrete class NS, gravity index 400-011 (0400-0-11)CY454.20$909.80$975.00$1,380.00$2,000.00$2,000.00$1,514.27
0175Inlets, curb, type P-5, <10' (0425-1351)EACH7$8,340.00$8,500.00$14,320$10,000$9,000.00$7,365.56
0180Inlets, DT bot, type C, modify (0425-1529)EACH1$8,050.00$6,100.00$6,455.00$8,500.00$7,500.00$7,102.05
0185Inlets, closed flume (0425-1910)EACH6$7,570.00$5,500.00$14,085$10,000$7,700.00$3,716.72
0190Manholes, P-7, <10' (0425-2-41)EACH1$8,120.00$6,500.00$11,500$8,500.00$6,100.00$5,736.49
0195Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF80$223.50$211.00$164.50$300.00$410.00$215.13
0200Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF864$126.80$130.00$164.50$200.00$230.00$127.25
0205Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF49$210.60$183.00$176.00$250.00$480.00$206.98
0210Pipe culvert, opt material, round, 30"S/CD (0430-175130)LF5$876.50$777.00$293.00$1,000.00$1,600.00$1,313.89
0215Straight concrete endwalls, single, 0 degrees, round (0430-518100)EACH1$3,690.00$2,800.00$6,100.00$7,500.00$5,200.00$2,759.88
0220Straight concrete endwalls, single, 0 degrees, round (0430-524100)EACH1$4,420.00$3,900.00$6,800.00$8,500.00$5,900.00$3,374.00
0225Straight concrete endwalls, single, 0 degrees, round (0430-530100)EACH1$5,360.00$5,700.00$8,450.00$10,000$5,900.00$4,712.21
0230Mitered end section, optional round, 24" SD (0430-984129)EACH2$2,880.00$2,300.00$2,350.00$3,900.00$5,200.00$3,475.15
0235Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH4$2,750.00$2,200.00$2,350.00$4,000.00$5,200.00$3,322.78
0240Pipe handrail - guiderail, aluminum (0515-1-2)LF2,269$51.10$58.00$54.00$65.00$59.00$46.00
0245Concrete curb & gutter, type E (0520-1-7)LF2,463$54.70$59.00$52.75$120.00$48.00$67.16
0255Concrete sidewalk and driveways, 6" thick (0522-2)SY1,578$95.90$87.00$100.00$135.00$96.00$99.08
0260Concrete ditch pavement, non reinforced, 6" (0524-1-4)SY8$976.50$172.00$176.00$500.00$390.00$130.83
0265Detectable warnings (0527-2)SF153$36.65$42.00$26.75$40.00$38.00$32.00
0270Guardrail -roadway, general (0536-1-1)LF2,650$22.80$22.00$24.65$25.00$22.00$22.21
0275Pipe rail for guardrail (0536-6)LF1,556$22.20$21.00$23.50$25.00$21.00$19.99
0280Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH9$362.00$500.00$557.50$500.00$500.00$325.95
0285Special guardrail post- post for shallow mount (0536-7-3)EACH1$127.80$340.00$381.50$500.00$340.00$115.04
0290Guardrail removal (0536-73)LF304$2.65$3.15$3.50$10.00$3.20$2.39
0295Guardrail end treatment- parallel approach terminal (0536-85-24)EACH12$3,550.00$3,250.00$3,640.00$3,250.00$3,300.00$3,191.32
0300Performance turf, sod (0570-1-2)SY7,872$7.25$7.00$6.90$5.00$6.00$5.13
0305Painted pavement markings, standard, white, solid, 6" (0710-11101)GM6.94$1,880.00$1,850.00$1,985.00$3,000.00$1,700.00$1,691.22
0310Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.94$1,880.00$1,850.00$1,985.00$3,000.00$1,700.00$1,690.73
0315Initial contingency amount, DO not bid (0999-25)LS1$75,000$75,000$75,000$75,000$75,000$75,000
0320Midblock crosswalk: rectangular rapid flashing beacon, furnish & install- complete sign assembly- back back (0654-2-22)AS2$17,000$13,000$17,950$15,000$13,700$11,000
0325Profiled thermoplastic,standard- asphalt surfaces, white, (0701-18101)GM2.41$8,200.00$8,000.00$8,675.00$10,000$11,400$7,407.37
0330Profiled thermoplastic,standard- asphalt surfaces, yellow, solid,6" (0701-18201)GM2.88$8,200.00$8,020.00$8,675.00$10,000$11,500$7,384.31
0335Raised pavement marker, type B (0706-1-3)EACH478$4.45$4.35$4.70$5.00$5.50$4.00
0340Painted pavement markings, surface (0710-90)LS1$14,400$13,000$15,235$35,000$22,900$12,978
0345Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF448$3.35$3.30$3.50$6.00$5.50$3.00
0350Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF65$7.80$7.60$8.20$12.00$10.00$7.00
0355Thermoplastic, standard, arrow (0711-11170)EACH10$83.30$81.50$88.00$150.00$100.00$75.00
0360Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF338$5.00$4.90$5.30$10.00$8.00$4.50
0365Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF50$15.55$15.20$16.50$20.00$29.00$14.00
0370Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.16$5,720.00$5,600.00$6,200.00$25,000$15,000$5,151.22
0375Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.02$5,870.00$5,750.00$6,200.00$100,000$15,000$5,280.00
0380Conduit, furnish & install, open trench (0630-2-11)LF4,822$15.45$18.00$16.30$15.00$16.00$12.75
0385Conduit, furnish & install, directional bore (0630-2-12)LF1,106$27.25$29.00$28.75$40.00$39.00$36.75
0390Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH49$1,400.00$2,210.00$1,475.00$1,500.00$2,200.00$2,318.00
0395Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$7,300.00$6,600.00$7,710.00$5,000.00$4,400.00$6,860.00
0400Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$3,470.00$3,200.00$3,660.00$2,500.00$3,300.00$1,224.00
0405Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$3,270.00$2,720.00$3,455.00$2,000.00$3,100.00$2,708.00
0410Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF20,206$2.40$2.85$2.50$3.00$5.00$2.55
0415Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF2,326$4.20$4.30$4.40$6.50$8.50$5.55
0420Load center, F&I, secondary voltage (0715-7-11)EACH2$22,300$19,500$23,600$16,000$17,800$19,590
0425Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211)EACH3$11,400$9,550.00$12,000$10,000$10,400$9,220.00
0430Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242)EACH25$11,500$9,400.00$12,000$9,500.00$10,500$9,304.00
0435Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311)EACH13$11,600$9,950.00$12,300$10,000$10,900$9,522.00
0440Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH2$11,800$9,800.00$12,500$10,000$11,100$9,882.00
0445Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH43$935.00$833.00$990.00$750.00$810.00$852.00
FDOT contract T5819: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.