Hubbard Construction Company: FDOT bid record

Hubbard Construction Company submitted 230 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 44 of them (19%). When it was not low, its total sat a median +16% above the low bid.

Owner
Florida DOT
Low bid volume
$402,231,103
Latest bid
28 OCT 2026
Data through
28 OCT 2026
230Bids
44Low bids
19Win rate, percent
+16%Median gap to the low bid when not low, 186 bids

By year

YearBidsLow bidsWin rate
201827415%
201926623%
202023730%
202129414%
202220210%
2023271141%
202418317%
202527415%
20263339%
Hubbard Construction Company, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 2911719%
District 556611%
District 7501224%
District 133927%
Hubbard Construction Company, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH31995 (30%)$1,185.76$1,150.00
Conduit, furnish & install, open trench0630-2-11LF32688 (27%)$17.06$16.54
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED21788 (41%)$0.11$0.13
Conduit, furnish & install, directional bore0630-2-12LF30584 (28%)$29.68$30.82
Sediment barrier0104-10-3LF19383 (43%)$1.32$2.60
Work zone sign0102-60ED21774 (34%)$0.23$0.25
Raised pavement marker, type B0706-1-3EACH23565 (28%)$4.62$5.00
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF20454 (26%)$6.42$6.09
Inlet protection system0104-18EACH19954 (27%)$112.69$150.00
Thermoplastic, standard, arrow0711-11170EACH20353 (26%)$77.20$80.00
Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron0711-11224LF18453 (29%)$4.72$4.50
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM19352 (27%)$4,884.14$5,220.00
Hubbard Construction Company, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Hubbard Construction Company, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T1937District 1446204152013 of 4$24,111,381+10%
28 OCT 2026T2A73District 2SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE6 of 8$21,826,764+34%
28 OCT 2026T2A83District 2SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR2 of 6$2,179,120+6.0%
28 OCT 2026T2A84District 2SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA6 of 7$12,282,806+33%
28 OCT 2026T2A86District 2SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT6 of 8$11,318,998+34%
28 OCT 2026T7591District 7SR 600 (US 92) FROM EUREKA SPRINGS RD TO THONOTOSASSA RD2 of 5$17,236,206+3.0%
26 AUG 2026T1940District 1SR 25 (US 27) FROM SANTA MARIA WAY TO LAKE ISIS AVE3 of 4$18,557,724+7.0%
26 AUG 2026T2A75District 2SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN4 of 5$2,278,270+9.0%
26 AUG 2026T2A78District 2SR 15 (US 1 / NEW KINGS RD) FROM TROUT RIVER BLVD TO SR 1043 of 3$4,292,906+5.0%
26 AUG 2026T5890District 5SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE2 of 6$6,004,860+10%
26 AUG 2026T7614District 7SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD3 of 6$5,626,218+2.0%
29 JUL 2026T2A29District 2SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER4 of 4$10,524,957+20%
29 JUL 2026T5883District 5SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.5444 of 9$21,129,845+7.0%
10 JUN 2026T2A47District 2SR 10 (US 90 / BEAVER ST) AT CR 119 (OTTIS RD)5 of 5$952,504+29%
10 JUN 2026T5888District 5SR 50 / SR 33 FROM CR 565 (VILLA CITY RD) TO 2ND AVE5 of 8$30,857,858+15%
20 MAY 2026T5863District 5SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92)4 of 6$6,995,762+17%
20 MAY 2026T7587District 7SR 597 (N DALE MABRY HWY) FROM N OF W SOUTH AVE TO N OF W...1 of 5$7,418,953Low, 1.0% under the second
20 MAY 2026T7595District 7SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO2 of 8$12,835,551+1.0%
29 APR 2026T7611District 7SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST2 of 9$10,736,421+4.0%
25 MAR 2026T1928District 1SR 544 FROM LAKE BLUE DR TO 26TH ST NW10 of 10$2,483,812+107%
25 MAR 2026T2963District 2SR 21 (BLANDING BLVD) FROM WILSON BLVD TO ROOSEVELT1 of 3$5,597,608Low, 6.0% under the second
25 MAR 2026T2A61District 2SR 5 (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE1 of 5$1,544,727Low, 8.0% under the second
25 MAR 2026T2A62District 2SR A1A (ATLANTIC AVE) FROM CENTRE ST TO S FLETCHER AVE5 of 5$8,145,275+62%
25 FEB 2026T2A33District 2SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL8 of 8$10,489,460+67%
25 FEB 2026T2A57District 2SR 15 (US 17 / PARK AVE) FROM DOCTORS INLET TO WELLS RD4 of 5$6,680,929+25%
Hubbard Construction Company: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy