FDOT contract T2A61 bid tabulation

SR 5 (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE. Let by Florida DOT on March 25, 2026, Nassau, District 2. 5 bids received; low bid $1,544,727 by Hubbard Construction Company.

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
49
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hubbard Construction Company$1,544,727Low
2Preferred Materials Inc.$1,670,535+8.0%
3Duval Asphalt Products, Inc.$1,672,376+8.0%
4Pigott Asphalt and Sitework LLC$1,673,230+8.0%
5Anderson Columbia Co., Inc.$1,730,247+12%
FDOT contract T2A61: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hubbard Construction Company2. Preferred Materials Inc.3. Duval Asphalt Products, Inc.4. Pigott Asphalt and Sitework LLC5. Anderson Columbia Co., Inc.
0005Mobilization (0101-1)LS1$74,757$88,961$150,000$146,224$246,173
0010Maintenance of traffic (0102-1)DA1$108,015$166,464$68,000$90,000$127,073
0015Work zone sign (0102-60)ED1,680$0.32$0.45$0.25$0.30$0.35
0020Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED3,600$0.17$0.15$0.25$0.01$0.18
0025Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH490$6.58$5.00$7.00$6.00$5.76
0030Portable changeable message sign, temporary (0102-99)ED268$17.27$11.00$20.00$1.00$18.44
0035Temporary raised rumble per day, includes all sets and relocations (0102-909)DA100$70.16$26.80$55.00$1.00$74.91
0040Sediment barrier (0104-10-3)LF889$1.06$3.68$3.00$3.00$4.17
0045Litter removal (0107-1)ACRE103.92$42.10$125.00$160.00$10.00$115.26
0050Mowing (0107-2)ACRE96.59$133.84$145.00$185.00$50.00$115.26
0055Clearing & grubbing (0110-1-1)ACRE1$31,306$17,569$14,500$7,500.00$35,360
0060Removal of existing concrete (0110-4-10)SY60$56.81$50.00$36.00$60.00$87.64
0065Borrow excavation, truck measure (0120-2-2)CY912$73.29$38.22$50.00$1.00$30.54
0070Regular excavation (3-R projects only) (0120-71)LS1$7,158.01$44,984$6,500.00$8,500.00$28,738
0075Type B stabilization (0160-4)SY170$38.63$121.04$60.00$15.00$22.75
0080Optional base, base group 01 (0285-701)SY171$73.85$37.51$50.00$25.00$27.51
0085Optional base, base group 03 (0285-703)SY170$96.79$112.06$75.00$40.00$63.79
0090Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY26,977$3.76$2.81$1.50$3.00$2.36
0095Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY8,214$2.53$3.63$3.00$4.00$2.22
0100Milling existing asphalt pavement, 4" avg depth (0327-70-7)SY2,114$10.99$8.17$5.00$6.00$6.16
0105Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN2,539.60$148.88$169.09$185.00$190.00$165.00
0110Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN3,091.70$146.36$164.78$180.00$190.00$163.86
0115Bridge approach expansion for concrete pavement (0370-1)LF20$107.94$100.00$100.00$250.00$91.06
0120Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF80$107.94$150.00$88.00$200.00$79.53
0125Performance turf, sod (0570-1-2)SY2,210$8.95$5.87$4.50$5.00$2.99
0130Painted pavement markings, standard, white, solid, 6" (0710-11101)GM3.78$2,411.96$2,749.27$2,300.00$2,500.00$3,169.65
0135Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.47$1,969.75$3,093.42$2,000.00$2,000.00$3,573.07
0140Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF182$3.29$4.00$3.50$3.00$4.61
0145Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF70$4.39$6.00$4.50$4.00$6.92
0150Painted pavement markings, standard, white, message or symbol (0710-11160)EACH2$93.22$110.00$90.00$100.00$126.79
0155Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM1.52$2,399.88$2,735.51$2,300.00$2,500.00$3,169.65
0160Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM1.16$1,095.69$799.31$1,100.00$1,000.00$922.08
0165Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0170Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM4.23$5,898.51$3,293.76$4,500.00$2,000.00$4,994.47
0175Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH1$675.97$620.00$700.00$600.00$714.62
0180Single column ground sign assembly, relocate (0700-1500)EACH1$281.30$258.00$300.00$300.00$297.37
0185Tubular marker, 36" white post (0704-1-3)EACH13$235.50$216.00$250.00$200.00$248.96
0190Object marker, type 1 (0705-10-1)EACH8$161.36$148.00$175.00$350.00$170.58
0195Object marker, type 3 (0705-10-3)EACH2$333.63$306.00$375.00$500.00$352.69
0200Raised pavement marker, type B (0706-1-3)EACH490$5.48$5.00$6.00$5.00$5.76
0205Painted pavement markings, surface (0710-90)LS1$18,608$13,000$18,500$20,000$14,984
0210Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.47$8,207.30$10,977$9,500.00$8,000.00$12,679
0215Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF182$7.68$4.75$9.00$7.00$5.47
0220Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF70$10.97$8.50$12.97$10.00$9.80
0225Thermoplastic, standard, message or symbol (0711-11160)EACH2$328.99$200.00$382.50$350.00$230.52
0230Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.78$7,126.24$4,498.81$8,300.00$6,750.00$5,186.71
0235Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.52$7,090.55$4,476.28$8,300.00$6,750.00$5,186.71
0240Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM1.16$4,930.60$1,998.28$5,750.00$4,500.00$2,305.20
0245Light pole complete, relocate (0715-68000)EACH1$8,325.28$3,968.05$9,500.00$10,000$7,069.58
FDOT contract T2A61: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy