FDOT letting results, March 25, 2026
28 contracts let by Florida DOT on March 25, 2026, $271,970,067 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 28
- Low bids, total
- $271,970,067
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T1920 | SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W | District 1 | 6 | Sema Construction, Inc. | $123,000,000 | $125,214,101 | +2.0% | FDOT |
| T5876 | SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST | District 5 | 6 | Timothy Rose Contracting, Inc. | $26,645,998 | $26,917,659 | +1.0% | FDOT |
| T3951 | SR 20 OVER ECONFINA CREEK, BRIDGE NO 460037 AND 460034 | District 3 | 4 | RJ Gorman Contracting LLC | $14,753,181 | $14,807,244 | 0.0% | FDOT |
| T6589 | SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE | District 6 | 6 | Aum Construction Inc. | $11,399,399 | $12,038,627 | +6.0% | FDOT |
| T2A70 | SR 121 FROM SR 55 (US 19) TO SR 45 (US 41 / SW 7TH ST) | District 2 | 5 | Anderson Columbia Co., Inc. | $10,660,305 | $11,298,091 | +6.0% | FDOT |
| T1919 | SR 35 (US 17) FROM S OF PINEGROVE CR TO N OF WASHINGTON LOOP | District 1 | 4 | Ajax Paving Industries of Florida LLC | $7,440,041 | $7,593,939 | +2.0% | FDOT |
| T3964 | SR 2 FROM SR 77 TO W OF SPRING BRANCH BRIDGE | District 3 | 3 | Anderson Columbia Co., Inc. | $6,915,055 | $7,594,731 | +10% | FDOT |
| T1915 | SR 78 FROM W OF SANTA BARBARA BLVD TO E OF DEL PRADO BLVD | District 1 | 4 | Ajax Paving Industries of Florida LLC | $6,891,904 | $7,093,909 | +3.0% | FDOT |
| T4740 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | District 4 | 9 | General Asphalt Company, LLC | $6,362,382 | $6,393,237 | 0.0% | FDOT |
| T6591 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | District 6 | 7 | Weekley Asphalt Paving, Inc. | $6,317,176 | $6,364,891 | +1.0% | FDOT |
| T5877 | SR 44 FROM W OF I-95 TO E OF S WALKER DR | District 5 | 3 | Masci General Contractors, Inc | $5,958,391 | $6,577,954 | +10% | FDOT |
| T3A09 | SR 261 (US 319 / CAPITAL CIR) FROM CR 151 (CENTERVILLE RD).. | District 3 | 3 | Capital Asphalt Inc | $5,739,988 | $5,941,487 | +4.0% | FDOT |
| T2963 | SR 21 (BLANDING BLVD) FROM WILSON BLVD TO ROOSEVELT | District 2 | 3 | Hubbard Construction Company | $5,597,608 | $5,939,511 | +6.0% | FDOT |
| T2A62 | SR A1A (ATLANTIC AVE) FROM CENTRE ST TO S FLETCHER AVE | District 2 | 5 | Maer Homes, LLC | $5,031,116 | $5,687,997 | +13% | FDOT |
| T3A02 | SR 10 (US 90) AT DOVER RD | District 3 | 7 | North Florida Asphalt, Inc. | $4,581,846 | $4,646,842 | +1.0% | FDOT |
| T7586 | SR 39 (JAMES L REDMAN PKWY) FROM S OF RAYBURN RD TO N OF... | District 7 | 6 | Gosalia Concrete Constructors, Inc. | $3,945,047 | $4,157,000 | +5.0% | FDOT |
| T4735 | SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS.. | District 4 | 6 | Sice Inc | $3,484,511 | $3,552,812 | +2.0% | FDOT |
| T1925 | SR 683 (US 301) FROM US 41 TO S OF 10TH ST | District 1 | 3 | Ajax Paving Industries of Florida LLC | $3,142,905 | $3,704,435 | +18% | FDOT |
| T2A65 | SR 8 (I-10), SR 91 (I-295) AND SR 115 (US 1) AT VARIOUS LO.. | District 2 | 2 | American Lighting and Signalization, LLC. | $2,346,000 | $2,667,228 | +14% | FDOT |
| T1932 | SR 82 AT ALABAMA RD | District 1 | 4 | Blacktip Services Incorporated | $1,867,531 | $2,277,389 | +22% | FDOT |
| T1934 | SR 45 (US 41) AT MIDWAY BLVD | District 1 | 4 | Ajax Paving Industries of Florida LLC | $1,717,616 | $1,769,769 | +3.0% | FDOT |
| T4734 | SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS... | District 4 | 7 | Sice Inc | $1,689,793 | $1,690,646 | 0.0% | FDOT |
| T2A61 | SR 5 (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE | District 2 | 5 | Hubbard Construction Company | $1,544,727 | $1,670,535 | +8.0% | FDOT |
| T3939 | CR 173 (BETHEL RD) OVER GUM CREEK NO 2, BRIDGE NO 610026 | District 3 | 3 | RJ Gorman Contracting LLC | $1,234,568 | $1,637,391 | +33% | FDOT |
| T1928 | SR 544 FROM LAKE BLUE DR TO 26TH ST NW | District 1 | 10 | Garcia Civil Contractors | $1,197,154 | $1,268,638 | +6.0% | FDOT |
| T3962 | SR 75 (US 231) AT CR 388 | District 3 | 2 | Ingram Signalization, Inc. | $1,187,507 | $1,238,238 | +4.0% | FDOT |
| T5878 | SR 438 AT HASTINGS ST / SHERINGHAM RD INTERSECTION | District 5 | 3 | Traffic Control Devices, Inc. | $1,041,041 | $1,049,878 | +1.0% | FDOT |
| T4753 | SR 814 (W ATLANTIC BLVD) FROM W OF LAKESIDE DR TO VISTA... | District 4 | 3 | Traffico LLC | $277,277 | $285,285 | +3.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.