| 0005 | Mobilization (0101-1) | LS | 1 | $397,805 | $513,000 | $375,151 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $574,885 | $350,000 | $545,803 |
| 0015 | Traffic control officer (0102-14) | HR | 376 | $125.87 | $125.00 | $100.00 |
| 0020 | Work zone sign (0102-60) | ED | 65,010 | $0.19 | $0.25 | $0.18 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 405,240 | $0.09 | $0.15 | $0.09 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 34,440 | $0.03 | $0.15 | $0.03 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 5,280 | $4.71 | $6.00 | $4.50 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 688 | $9.42 | $17.50 | $9.00 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,980 | $22.57 | $27.00 | $21.56 |
| 0050 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,980 | $5.30 | $20.00 | $5.06 |
| 0055 | Sediment barrier (0104-10-3) | LF | 1,288 | $1.03 | $1.25 | $2.83 |
| 0060 | Inlet protection system (0104-18) | EACH | 82 | $104.68 | $100.00 | $140.85 |
| 0065 | Litter removal (0107-1) | ACRE | 120.95 | $130.85 | $155.00 | $125.00 |
| 0070 | Mowing (0107-2) | ACRE | 25.32 | $366.37 | $200.00 | $155.00 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $23,009 | $18,500 | $19,425 |
| 0080 | Removal of existing concrete (0110-4-10) | SY | 573 | $42.05 | $56.00 | $35.50 |
| 0085 | Borrow excavation, truck measure (0120-2-2) | CY | 103.50 | $62.19 | $65.00 | $164.23 |
| 0090 | Optional base, base group 13 (0285-713) | SY | 148 | $151.33 | $135.00 | $239.02 |
| 0095 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 64,492 | $2.96 | $2.50 | $3.59 |
| 0100 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 27,329 | $5.62 | $3.00 | $5.42 |
| 0105 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 5,558.70 | $151.17 | $180.00 | $202.64 |
| 0110 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 7,587.80 | $179.58 | $180.00 | $207.74 |
| 0115 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $10,128 | $12,500 | $8,550.00 |
| 0120 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $10,128 | $9,500.00 | $8,550.00 |
| 0125 | Manhole, adjust (0425-5) | EACH | 9 | $1,574.45 | $1,800.00 | $1,250.00 |
| 0130 | Manhole, adjust, utilities (0425-5-1) | EACH | 18 | $1,574.45 | $1,800.00 | $1,250.00 |
| 0135 | Valve boxes, adjust (0425-6) | EACH | 55 | $1,527.54 | $1,600.00 | $1,250.00 |
| 0140 | Pipe liner, cured in place, 18" (0431-1118) | LF | 439 | $134.12 | $150.00 | $115.00 |
| 0145 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 445 | $69.06 | $80.00 | $64.00 |
| 0150 | Polymer nosing for bridge expansion joint (0458-2) | CF | 87 | $755.33 | $865.00 | $700.00 |
| 0155 | Concrete curb & gutter, type F (0520-1-10) | LF | 718 | $34.94 | $55.00 | $29.50 |
| 0160 | Traffic separator concrete- type IV, 6' wide (0520-5-42) | LF | 271 | $70.48 | $315.00 | $59.50 |
| 0165 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 18 | $100.68 | $55.00 | $85.00 |
| 0170 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 208 | $100.68 | $71.00 | $85.00 |
| 0175 | Detectable warnings (0527-2) | SF | 1,153 | $40.27 | $42.00 | $34.00 |
| 0180 | Crash cushion, TL-3, narrow (0544-3-1) | EACH | 1 | $35,067 | $42,500 | $28,500 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 513 | $12.58 | $20.00 | $20.00 |
| 0190 | Conduit, furnish & install, open trench (0630-2-11) | LF | 92 | $25.48 | $30.00 | $24.34 |
| 0195 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 25 | $27.47 | $32.00 | $26.24 |
| 0200 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,713.47 | $1,800.00 | $1,636.90 |
| 0205 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 7 | $3,039.67 | $3,500.00 | $2,903.84 |
| 0210 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 7 | $2,564.29 | $3,000.00 | $2,449.70 |
| 0215 | Raised pavement marker, type B (0706-1-3) | EACH | 1,952 | $5.54 | $4.50 | $5.00 |
| 0220 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 4.85 | $1,769.44 | $1,600.00 | $1,597.69 |
| 0225 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.18 | $2,275.22 | $1,600.00 | $2,054.35 |
| 0230 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.03 | $3,322.26 | $1,600.00 | $3,000.00 |
| 0235 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 6,770 | $1.55 | $1.00 | $1.40 |
| 0240 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 472 | $2.49 | $1.53 | $2.25 |
| 0245 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 4,100 | $2.77 | $2.00 | $2.50 |
| 0250 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 3.54 | $464.62 | $750.00 | $419.53 |
| 0255 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.32 | $2,870.53 | $1,600.00 | $2,591.90 |
| 0260 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.39 | $800.28 | $900.00 | $722.59 |
| 0265 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 35 | $77.52 | $80.00 | $70.00 |
| 0270 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 118 | $49.84 | $50.00 | $45.00 |
| 0275 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 4.37 | $1,771.59 | $1,600.00 | $1,599.63 |
| 0280 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 246 | $2.49 | $1.53 | $2.25 |
| 0285 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 1.53 | $470.07 | $850.00 | $424.45 |
| 0290 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.23 | $790.53 | $900.00 | $713.78 |
| 0295 | Two component polyurethane injection (0906-173200) | LB | 23,200 | $7.33 | $11.50 | $9.00 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $67,283 | $67,283 | $67,283 |
| 0305 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 51 | $546.94 | $600.00 | $475.00 |
| 0310 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 9 | $2,418.05 | $3,000.00 | $2,100.00 |
| 0315 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 3 | $2,302.91 | $3,300.00 | $2,000.00 |
| 0320 | Single column ground sign assembly, remove (0700-1600) | EACH | 58 | $57.57 | $35.00 | $50.00 |
| 0325 | Tubular marker, 36" yellow (0704-1-4) | EACH | 12 | $172.72 | $245.00 | $150.00 |
| 0330 | Object marker, type 1 (0705-10-1) | EACH | 1 | $259.08 | $350.00 | $225.00 |
| 0335 | Raised pavement marker, type B (0706-1-3) | EACH | 1,952 | $5.54 | $5.00 | $5.00 |
| 0340 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 253 | $6.65 | $7.00 | $6.00 |
| 0345 | Painted pavement markings, surface (0710-90) | LS | 1 | $78,310 | $62,000 | $45,000 |
| 0350 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.03 | $20,364 | $12,000 | $18,387 |
| 0355 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,770 | $3.32 | $5.00 | $3.00 |
| 0360 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 472 | $4.98 | $6.00 | $4.50 |
| 0365 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,645 | $8.86 | $7.50 | $8.00 |
| 0370 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.39 | $3,288.76 | $4,000.00 | $2,969.54 |
| 0375 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 21 | $182.74 | $245.00 | $165.00 |
| 0380 | Thermoplastic, standard, arrow (0711-11170) | EACH | 104 | $83.06 | $95.00 | $75.00 |
| 0385 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 246 | $4.98 | $6.00 | $4.50 |
| 0390 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.23 | $3,140.36 | $4,000.00 | $2,835.56 |
| 0395 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,455 | $14.40 | $18.00 | $13.00 |
| 0400 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 14 | $243.65 | $245.00 | $220.00 |
| 0405 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 14 | $177.20 | $125.00 | $160.00 |
| 0410 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 4 | $653.43 | $425.00 | $590.00 |
| 0415 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 4 | $775.25 | $200.00 | $700.00 |
| 0420 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 4.85 | $4,202.42 | $6,000.00 | $3,794.51 |
| 0425 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.18 | $18,418 | $6,500.00 | $16,630 |
| 0430 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.54 | $1,770.00 | $3,000.00 | $1,598.19 |
| 0435 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.32 | $16,561 | $6,000.00 | $14,953 |
| 0440 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.37 | $3,986.08 | $6,000.00 | $3,599.18 |
| 0445 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.53 | $1,659.08 | $3,000.00 | $1,498.04 |
| 0450 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.78 | $36,361 | $33,000 | $32,832 |
| 0455 | Permanent tape, white, solid lane drop marking, 12" for concrete bridges (0713-103103) | GM | 0.07 | $67,427 | $60,000 | $60,882 |
| 0460 | Permanent tape, white, 3-9 dotted, 12" wide, for concrete surfaces (0713-103173) | GM | 0.03 | $57,426 | $17,500 | $51,852 |
| 0465 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.69 | $18,663 | $10,000 | $16,851 |
| 0470 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.52 | $35,914 | $33,000 | $32,428 |
| 0475 | Conduit, furnish & install, open trench (0630-2-11) | LF | 215 | $14.80 | $20.00 | $14.14 |
| 0480 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 273 | $25.80 | $30.00 | $24.65 |
| 0485 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 4 | $8,800.27 | $10,500 | $8,407.02 |
| 0490 | Signal cable, remove- intersection (0632-7-6) | PI | 4 | $4,237.35 | $4,500.00 | $4,048.00 |
| 0495 | Fiber optic cable locator (0633-6) | DA | 330 | $158.90 | $175.00 | $151.80 |
| 0500 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 37 | $1,713.47 | $1,800.00 | $1,636.90 |
| 0505 | Aluminum signals pole, (0646-1-11) | EACH | 19 | $3,008.36 | $3,500.00 | $2,873.93 |
| 0510 | Aluminum signals pole, remove (0646-1-60) | EACH | 7 | $635.60 | $1,000.00 | $607.20 |
| 0515 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $76,414 | $90,400 | $73,000 |
| 0520 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $79,737 | $92,500 | $76,174 |
| 0525 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $9,828.81 | $10,000 | $9,389.60 |
| 0530 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 4 | $1,920.00 | $2,000.00 | $1,834.20 |
| 0535 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 4 | $2,290.50 | $2,500.00 | $2,188.15 |
| 0540 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 1 | $2,976.42 | $3,250.00 | $2,843.42 |
| 0545 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 39 | $535.78 | $600.00 | $511.84 |
| 0550 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 16 | $942.45 | $1,100.00 | $900.34 |
| 0555 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 4 | $1,721.07 | $2,000.00 | $1,644.16 |
| 0560 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 14 | $211.87 | $250.00 | $202.40 |
| 0565 | Loop assembly, F&I, type F (0660-2106) | AS | 62 | $1,622.40 | $1,750.00 | $1,549.90 |
| 0570 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 24 | $394.22 | $450.00 | $376.60 |
| 0575 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 14 | $105.93 | $125.00 | $101.20 |
| 0580 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $945.52 | $1,100.00 | $903.27 |
| 0585 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 2 | $1,946.48 | $2,000.00 | $1,859.50 |