Preferred Materials Inc.: FDOT bid record
Preferred Materials Inc. submitted 351 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 96 of them (27%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $770,412,981
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 35 | 6 | 17% |
| 2019 | 32 | 13 | 41% |
| 2020 | 23 | 6 | 26% |
| 2021 | 21 | 7 | 33% |
| 2022 | 38 | 13 | 34% |
| 2023 | 48 | 14 | 29% |
| 2024 | 58 | 13 | 22% |
| 2025 | 44 | 8 | 18% |
| 2026 | 52 | 16 | 31% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 152 | 43 | 28% |
| District 7 | 85 | 32 | 38% |
| District 1 | 78 | 19 | 24% |
| District 5 | 35 | 2 | 6% |
| District 4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 338 | 190 (56%) | $0.11 | $0.13 |
| Work zone sign | 0102-60 | ED | 336 | 190 (57%) | $0.22 | $0.25 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 431 | 186 (43%) | $4.64 | $5.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 337 | 184 (55%) | $10.50 | $12.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 432 | 182 (42%) | $16.54 | $16.54 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 417 | 174 (42%) | $1,241.50 | $1,150.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 296 | 155 (52%) | $5.26 | $5.90 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 313 | 154 (49%) | $75.00 | $80.00 |
| Thermoplastic, standard-other surfaces, yellow, solid, 6" | 0711-16201 | GM | 290 | 153 (53%) | $4,600.00 | $5,200.00 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 293 | 152 (52%) | $4,700.00 | $5,220.00 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 318 | 150 (47%) | $1,347.43 | $1,350.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 404 | 148 (37%) | $32.48 | $30.82 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ajax Paving Industries of Florida LLC | 153 | 58 of 153 |
| Hubbard Construction Company | 149 | 67 of 149 |
| Anderson Columbia Co., Inc. | 79 | 50 of 79 |
| Duval Asphalt Products, Inc. | 74 | 34 of 74 |
| C.W. Roberts Contracting, Inc. | 73 | 36 of 73 |
| Watson Civil Construction, Inc. | 52 | 25 of 52 |
| Whitehurst, V. E. & Sons, Inc. | 48 | 25 of 48 |
| Superior Asphalt, Inc. | 39 | 15 of 39 |
| Masci General Contractors, Inc | 30 | 15 of 30 |
| Ohla USA Inc | 30 | 15 of 30 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1949 | District 1 | SR 93 (I-75) FROM N OF ALICO RD TO S OF DANIELS PKWY | 3 of 3 | $7,108,555 | +8.0% |
| 28 OCT 2026 | T2A73 | District 2 | SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE | 3 of 8 | $18,699,872 | +15% |
| 28 OCT 2026 | T2A82 | District 2 | SR 24A / SR 226 (SW 16TH AVE) FROM SR 24 (ARCHER RD) TO SR 331 (SE WILLISTON | 2 of 5 | $3,221,205 | +10% |
| 28 OCT 2026 | T2A83 | District 2 | SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR | 1 of 6 | $2,053,866 | Low, 6.0% under the second |
| 28 OCT 2026 | T2A84 | District 2 | SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA | 4 of 7 | $10,173,460 | +10% |
| 28 OCT 2026 | T2A86 | District 2 | SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT | 3 of 8 | $9,707,652 | +15% |
| 28 OCT 2026 | T7591 | District 7 | SR 600 (US 92) FROM EUREKA SPRINGS RD TO THONOTOSASSA RD | 1 of 5 | $16,764,997 | Low, 3.0% under the second |
| 26 AUG 2026 | T1945 | District 1 | SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF | 1 of 5 | $15,653,923 | Low, 6.0% under the second |
| 26 AUG 2026 | T2A69 | District 2 | SR 45 (US 27 / US 41) FROM SR 24 (ARCHER RD) TO S OF SR 26 (W NEWBERRY | 3 of 4 | $6,077,673 | +8.0% |
| 26 AUG 2026 | T2A74 | District 2 | SR 26 (W UNIVERSITY AVE) FROM SW 38TH ST TO GALE LEMERAND DR | 1 of 3 | $3,511,852 | Low, 13% under the second |
| 26 AUG 2026 | T2A75 | District 2 | SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN | 1 of 5 | $2,092,518 | Low, 3.0% under the second |
| 26 AUG 2026 | T2A78 | District 2 | SR 15 (US 1 / NEW KINGS RD) FROM TROUT RIVER BLVD TO SR 104 | 2 of 3 | $4,086,676 | 0.0% |
| 26 AUG 2026 | T7614 | District 7 | SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD | 6 of 6 | $7,146,825 | +29% |
| 29 JUL 2026 | T1942 | District 1 | SR 64 FROM W OF CR 675 TO WINGATE RD | 4 of 4 | $11,070,010 | +33% |
| 29 JUL 2026 | T2A29 | District 2 | SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER | 2 of 4 | $9,236,795 | +5.0% |
| 29 JUL 2026 | T5889 | District 5 | SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA | 3 of 5 | $3,588,295 | +20% |
| 29 JUL 2026 | T5891 | District 5 | SR 9 (I-95) FROM CITRUS BLVD TO ADDISON CANAL | 3 of 4 | $15,894,822 | +6.0% |
| 29 JUL 2026 | T7599 | District 7 | SR 45 (US 41) FROM S OF COUNTY LINE RD TO S OF POWELL RD | 3 of 4 | $8,626,077 | +9.0% |
| 10 JUN 2026 | T2A47 | District 2 | SR 10 (US 90 / BEAVER ST) AT CR 119 (OTTIS RD) | 2 of 5 | $812,998 | +10% |
| 10 JUN 2026 | T2A50 | District 2 | SR 55 (US 19) AT NW MAIN ST AND AT USHER CREEK BRIDGE FROM.. | 2 of 3 | $16,175,713 | +3.0% |
| 10 JUN 2026 | T2A63 | District 2 | SR 24 (US 441 / SW 13TH ST / MLK JR HWY) AT SR 24 (SW ARCHER | 4 of 4 | $4,541,529 | +34% |
| 10 JUN 2026 | T7534 | District 7 | US 41B (N TAMPA ST) AND N FLORIDA AVE FROM JACKSON ST TO... | 1 of 4 | $23,563,969 | Low, 16% under the second |
| 20 MAY 2026 | T2A66 | District 2 | SR 500 (US ALT 27) AND SR 49 (US 129) AT CR 335A AND AT NW.. | 4 of 4 | $3,216,042 | +50% |
| 20 MAY 2026 | T7587 | District 7 | SR 597 (N DALE MABRY HWY) FROM N OF W SOUTH AVE TO N OF W... | 3 of 5 | $8,978,340 | +21% |
| 20 MAY 2026 | T7595 | District 7 | SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO | 5 of 8 | $13,603,764 | +7.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.