FDOT contract T1945 bid tabulation
SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF. Let by Florida DOT on August 26, 2026, Manatee, District 1. 5 bids received; low bid $15,653,923 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 119
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $15,653,923 | Low |
| 2 | Ajax Paving Industries of Florida LLC | $16,549,096 | +6.0% |
| 3 | Superior Asphalt, Inc. | $18,997,617 | +21% |
| 4 | C.W. Roberts Contracting, Inc. | $19,220,112 | +23% |
| 5 | Watson Civil Construction, Inc. | $21,371,758 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. Ajax Paving Industries of Florida LLC | 3. Superior Asphalt, Inc. | 4. C.W. Roberts Contracting, Inc. | 5. Watson Civil Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $313,662 | $600,000 | $676,000 | $1,147,889 | $1,315,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $139,300 | $126,500 | $99,300 | $109,821 | $232,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $570,440 | $853,838 | $489,500 | $1,011,958 | $280,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $203,035 | $154,852 | $128,600 | $87,627 | $50,000 |
| 0025 | Traffic control officer (0102-14) | HR | 7,048 | $9.28 | $0.01 | $85.60 | $0.01 | $110.00 |
| 0030 | Work zone sign (0102-60) | ED | 23,890 | $0.20 | $0.20 | $0.25 | $0.22 | $0.33 |
| 0035 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 3,912 | $13.25 | $23.16 | $25.65 | $40.45 | $23.50 |
| 0040 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 3,425 | $6.12 | $8.42 | $9.30 | $17.85 | $8.50 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 192,380 | $0.09 | $0.09 | $0.10 | $0.10 | $0.15 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,250 | $5.17 | $5.26 | $5.85 | $5.81 | $6.00 |
| 0055 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 4,788 | $4.14 | $4.21 | $4.65 | $5.05 | $6.00 |
| 0060 | Temporary crash cushion, redirective option (0102-89-1) | LO | 5 | $1,127.64 | $1,097.04 | $1,270.00 | $8,522.04 | $1,150.00 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 3,842 | $9.31 | $9.48 | $10.50 | $10.46 | $15.00 |
| 0070 | Existing ITS maintenance (0102-112) | DA | 600 | $64.23 | $65.37 | $186.50 | $199.28 | $190.00 |
| 0075 | Type III barricade (0102-115) | ED | 76 | $0.24 | $0.24 | $0.30 | $0.27 | $0.50 |
| 0080 | Portable regulatory, sign (0102-150-1) | ED | 1,800 | $5.17 | $0.01 | $5.85 | $5.81 | $9.00 |
| 0085 | Radar speed display unit (0102-150-2) | ED | 1,800 | $5.17 | $0.01 | $5.85 | $5.81 | $9.00 |
| 0090 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 0.43 | $5,111.84 | $5,264.12 | $5,824.00 | $6,383.41 | $5,000.00 |
| 0095 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.72 | $11,269 | $11,581 | $12,820 | $15,205 | $11,200 |
| 0100 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.36 | $5,158.34 | $5,264.12 | $5,824.00 | $6,291.72 | $5,100.00 |
| 0105 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.71 | $1,031.63 | $1,052.82 | $1,165.00 | $1,258.29 | $1,010.00 |
| 0110 | Sediment barrier (0104-10-3) | LF | 141,575 | $1.12 | $0.01 | $2.20 | $0.01 | $1.00 |
| 0115 | Inlet protection system (0104-18) | EACH | 56 | $155.18 | $184.24 | $220.00 | $159.57 | $146.00 |
| 0120 | Litter removal (0107-1) | ACRE | 2,900.26 | $26.90 | $36.32 | $35.00 | $28.35 | $30.00 |
| 0125 | Mowing (0107-2) | ACRE | 2,656.13 | $46.55 | $36.32 | $70.00 | $78.23 | $40.00 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $13,732 | $40,000 | $25,000 | $76,624 | $60,000 |
| 0135 | Removal of existing concrete (0110-4-10) | SY | 24 | $59.69 | $122.83 | $206.75 | $131.58 | $44.00 |
| 0140 | Regular excavation (0120-1) | CY | 55 | $44.79 | $61.26 | $135.00 | $78.36 | $70.00 |
| 0145 | Embankment (0120-6) | CY | 880 | $67.53 | $51.02 | $82.25 | $107.89 | $35.00 |
| 0150 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 14,073 | $2.45 | $2.47 | $2.85 | $2.14 | $3.55 |
| 0155 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 77,946 | $2.25 | $4.83 | $3.60 | $4.56 | $5.05 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 33,037 | $2.79 | $6.91 | $1.85 | $5.10 | $2.60 |
| 0165 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 88,454 | $3.45 | $3.88 | $2.70 | $3.27 | $3.80 |
| 0170 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 1,157 | $15.32 | $11.91 | $8.95 | $8.34 | $10.50 |
| 0175 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 184,832 | $3.44 | $5.01 | $3.60 | $5.25 | $5.35 |
| 0180 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 1,952.30 | $135.59 | $127.13 | $147.75 | $128.77 | $166.50 |
| 0185 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 5,399.20 | $136.43 | $133.41 | $171.90 | $193.52 | $194.00 |
| 0190 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 51,447.80 | $128.48 | $137.06 | $166.50 | $149.73 | $188.00 |
| 0195 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 11,764.80 | $247.95 | $217.00 | $234.45 | $240.84 | $264.50 |
| 0200 | Miscellaneous asphalt (0339-1) | TN | 228.90 | $354.83 | $301.96 | $350.00 | $373.15 | $395.00 |
| 0205 | Shoulder gutter- concrete (0520-6) | LF | 58 | $213.75 | $73.01 | $150.00 | $266.06 | $53.00 |
| 0210 | Guardrail -roadway, general (0536-1-1) | LF | 6,366 | $25.86 | $23.16 | $25.65 | $28.78 | $22.50 |
| 0212 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 3 | $3,879.51 | $3,790.16 | $4,200.00 | $3,949.40 | $3,700.00 |
| 0213 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 4 | $3,103.61 | $1,763.48 | $1,950.00 | $1,986.34 | $1,720.00 |
| 0215 | Guardrail removal (0536-73) | LF | 6,224 | $2.07 | $2.11 | $2.35 | $1.13 | $2.05 |
| 0220 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 4 | $2,069.08 | $1,658.20 | $1,835.00 | $1,497.19 | $1,610.00 |
| 0225 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 3 | $3,413.97 | $2,947.91 | $3,260.00 | $3,355.84 | $2,900.00 |
| 0230 | Performance turf (0570-1-1) | SY | 29,696 | $7.20 | $2.65 | $7.25 | $5.94 | $5.00 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 4,550 | $7.20 | $2.65 | $7.40 | $4.41 | $6.20 |
| 0240 | Shoulder drop off soil (0570-13-1) | CY | 1,601.90 | $16.00 | $52.91 | $48.30 | $101.28 | $38.00 |
| 0245 | Conduit, furnish & install, open trench (0630-2-11) | LF | 62 | $21.30 | $21.68 | $17.50 | $41.23 | $16.50 |
| 0250 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 70 | $28.93 | $29.44 | $35.00 | $158.05 | $49.00 |
| 0260 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,312.83 | $1,336.03 | $1,690.00 | $1,983.76 | $1,260.00 |
| 0265 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 24 | $2,896.73 | $2,947.94 | $2,970.00 | $3,217.31 | $3,220.00 |
| 0270 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 24 | $2,661.49 | $2,708.54 | $2,565.00 | $2,972.00 | $2,800.00 |
| 0275 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 1 | $7,034.16 | $7,158.50 | $8,740.00 | $10,302 | $11,500 |
| 0280 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 13.31 | $1,551.11 | $1,579.24 | $1,750.00 | $1,893.32 | $1,520.00 |
| 0285 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 1.40 | $1,650.55 | $1,684.52 | $1,865.00 | $2,013.18 | $1,620.00 |
| 0290 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.06 | $1,814.91 | $2,105.65 | $2,330.00 | $2,656.49 | $2,150.00 |
| 0295 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 2,992 | $2.07 | $2.11 | $2.35 | $2.52 | $2.05 |
| 0300 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 22.13 | $724.14 | $736.98 | $815.00 | $883.25 | $710.00 |
| 0305 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.25 | $1,642.14 | $1,684.52 | $1,865.00 | $2,002.94 | $1,620.00 |
| 0310 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $87.93 | $89.49 | $100.00 | $107.26 | $86.00 |
| 0315 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 5 | $46.56 | $47.38 | $53.00 | $56.78 | $46.00 |
| 0320 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 11.06 | $1,551.38 | $1,579.24 | $1,750.00 | $1,892.24 | $1,520.00 |
| 0325 | Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202) | GM | 2.18 | $1,854.47 | $1,895.08 | $2,100.00 | $2,272.35 | $1,850.00 |
| 0330 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $110,000 | $110,000 | $110,000 | $110,000 | $110,000 |
| 0335 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $40,000 | $40,000 | $40,000 | $40,000 | $40,000 |
| 0340 | Ground-in rumble strips, 16" (0546-72-1) | GM | 24.77 | $2,568.03 | $1,719.30 | $1,800.00 | $2,098.94 | $1,900.00 |
| 0345 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 21 | $537.96 | $547.47 | $605.00 | $595.54 | $527.00 |
| 0350 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 19 | $2,069.07 | $2,105.65 | $2,330.00 | $2,290.55 | $2,050.00 |
| 0355 | Single column ground sign assembly, remove (0700-1600) | EACH | 33 | $10.35 | $10.53 | $11.65 | $11.45 | $10.20 |
| 0360 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $8,793.56 | $8,949.00 | $9,900.00 | $9,734.83 | $8,600.00 |
| 0365 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $12,414 | $12,634 | $13,980 | $13,743 | $12,200 |
| 0370 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $21,725 | $22,109 | $24,500 | $24,051 | $21,300 |
| 0375 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 5 | $1,551.80 | $1,579.24 | $1,750.00 | $1,717.91 | $1,520.00 |
| 0380 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 2 | $620.73 | $631.69 | $700.00 | $687.17 | $610.00 |
| 0385 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 5 | $1,241.44 | $1,263.39 | $1,400.00 | $1,374.33 | $1,220.00 |
| 0390 | Sign panel, furnish & install ground mount, 101-200 SF (0700-3106) | EACH | 5 | $6,000.31 | $6,106.38 | $6,755.00 | $6,642.59 | $5,900.00 |
| 0395 | Sign panel, furnish & install ground mount, 201-300 SF (0700-3107) | EACH | 1 | $14,484 | $14,740 | $16,310 | $16,034 | $14,200 |
| 0400 | Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203) | EACH | 7 | $1,034.54 | $1,052.82 | $1,165.00 | $1,145.28 | $1,020.00 |
| 0405 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 2 | $3,310.52 | $3,369.04 | $3,730.00 | $3,664.88 | $3,230.00 |
| 0410 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 3 | $4,138.15 | $4,211.29 | $4,660.00 | $4,581.09 | $4,050.00 |
| 0415 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 1 | $12,414 | $12,634 | $13,980 | $13,743 | $12,220 |
| 0420 | Sign panel, furnish & install overhead mount, 301-400 SF (0700-3208) | EACH | 3 | $13,966 | $14,213 | $15,725 | $15,461 | $13,700 |
| 0425 | Sign panel, furnish & install overhead mount, 401-500 SF (0700-3209) | EACH | 4 | $16,553 | $16,845 | $18,650 | $18,324 | $16,200 |
| 0430 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $20.69 | $21.06 | $23.30 | $22.91 | $20.50 |
| 0435 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 7 | $103.45 | $105.28 | $117.00 | $114.53 | $102.00 |
| 0440 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 5 | $310.36 | $315.85 | $350.00 | $343.58 | $304.00 |
| 0445 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 2 | $362.09 | $368.49 | $408.00 | $400.85 | $354.00 |
| 0450 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 5 | $465.54 | $473.77 | $524.00 | $515.37 | $455.00 |
| 0455 | Sign panel, remove, 201-300 SF (0700-3607) | EACH | 1 | $775.90 | $789.62 | $874.00 | $858.96 | $758.00 |
| 0460 | Sign panel, remove, 401-500 SF (0700-3609) | EACH | 1 | $775.90 | $789.62 | $874.00 | $858.96 | $758.00 |
| 0465 | Sign panel, remove, 101-200 SF with lighting (0700-3626) | EACH | 3 | $1,551.81 | $1,579.24 | $1,750.00 | $1,717.91 | $1,520.00 |
| 0470 | Sign panel, remove panel, SF with lighting (0700-3627) | EACH | 1 | $2,069.07 | $2,105.65 | $2,330.00 | $2,290.54 | $2,050.00 |
| 0475 | Sign panel, remove panel, SF with lighting (0700-3628) | EACH | 3 | $2,069.07 | $2,105.65 | $2,330.00 | $2,290.55 | $2,050.00 |
| 0480 | Sign panel, remove panel, SF with lighting (0700-3629) | EACH | 3 | $2,069.07 | $2,105.65 | $2,330.00 | $2,290.55 | $2,050.00 |
| 0485 | Object marker, type 3 (0705-10-3) | EACH | 14 | $289.67 | $294.79 | $326.00 | $320.68 | $283.00 |
| 0490 | Raised pavement marker, type B (0706-1-3) | EACH | 4,788 | $4.14 | $4.21 | $4.65 | $5.05 | $4.05 |
| 0495 | Painted pavement markings, surface (0710-90) | LS | 1 | $58,451 | $59,485 | $65,810 | $71,294 | $57,300 |
| 0500 | Painted pavement markings, surface (0710-90) | LS | 1 | $9,828.10 | $10,002 | $11,065 | $11,987 | $9,600.00 |
| 0505 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.06 | $10,890 | $12,634 | $13,980 | $15,939 | $12,800 |
| 0510 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,992 | $5.17 | $5.26 | $5.85 | $6.31 | $5.05 |
| 0515 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $310.36 | $315.85 | $350.00 | $378.55 | $304.00 |
| 0520 | Thermoplastic, standard, arrow (0711-11170) | EACH | 5 | $93.11 | $94.75 | $105.00 | $113.57 | $91.00 |
| 0525 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 2 | $1,551.81 | $1,579.24 | $1,750.00 | $1,892.76 | $1,520.00 |
| 0530 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 13.31 | $5,997.61 | $6,106.38 | $6,755.00 | $7,320.85 | $5,900.00 |
| 0535 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 1.40 | $6,395.85 | $6,527.51 | $7,220.00 | $7,801.10 | $6,300.00 |
| 0540 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 22.13 | $2,586.22 | $2,632.06 | $2,910.00 | $3,154.45 | $2,600.00 |
| 0545 | Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133) | GM | 0.25 | $5,131.63 | $5,264.12 | $5,825.00 | $6,259.13 | $5,020.00 |
| 0550 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 13.24 | $5,999.41 | $6,106.38 | $6,755.00 | $7,317.54 | $5,900.00 |
| 0555 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 1.83 | $31,002 | $31,585 | $34,950 | $38,020 | $30,300 |
| 0560 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.07 | $36,513 | $42,113 | $46,600 | $51,958 | $41,600 |
| 0565 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 1.48 | $10,303 | $10,528 | $11,650 | $12,653 | $10,200 |
| 0570 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 1.83 | $30,917 | $31,585 | $34,950 | $37,917 | $30,400 |
| 0575 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 1.54 | $10,345 | $10,528 | $11,650 | $12,618 | $10,200 |
| 0580 | Conduit, furnish & install, open trench (0630-2-11) | LF | 122 | $21.19 | $21.56 | $14.00 | $38.51 | $16.50 |
| 0585 | Fiber optic cable locator (0633-6) | DA | 300 | $79.77 | $81.18 | $145.00 | $168.81 | $174.00 |
| 0590 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 10 | $1,312.23 | $1,335.42 | $1,690.00 | $1,983.76 | $1,260.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.