Ajax Paving Industries of Florida LLC: FDOT bid record
Ajax Paving Industries of Florida LLC submitted 250 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 55 of them (22%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $463,004,855
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 31 | 7 | 23% |
| 2019 | 19 | 3 | 16% |
| 2020 | 21 | 4 | 19% |
| 2021 | 31 | 6 | 19% |
| 2022 | 24 | 6 | 25% |
| 2023 | 22 | 5 | 23% |
| 2024 | 37 | 11 | 30% |
| 2025 | 30 | 4 | 13% |
| 2026 | 35 | 9 | 26% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 142 | 45 | 32% |
| District 7 | 105 | 10 | 10% |
| District 5 | 2 | 0 | 0% |
| StateWide | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 234 | 87 (37%) | $0.11 | $0.13 |
| Detectable warnings | 0527-2 | SF | 182 | 85 (47%) | $25.80 | $35.00 |
| Mowing | 0107-2 | ACRE | 219 | 74 (34%) | $74.74 | $80.65 |
| Sediment barrier | 0104-10-3 | LF | 203 | 74 (36%) | $1.40 | $2.60 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 381 | 73 (19%) | $18.24 | $16.54 |
| Work zone sign | 0102-60 | ED | 231 | 68 (29%) | $0.24 | $0.25 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 356 | 60 (17%) | $35.62 | $30.82 |
| Portable changeable message sign, temporary | 0102-99 | ED | 232 | 56 (24%) | $11.22 | $12.00 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 124 | 56 (45%) | $0.06 | $0.07 |
| Traffic control officer | 0102-14 | HR | 191 | 53 (28%) | $85.36 | $80.00 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 349 | 50 (14%) | $1,332.54 | $1,150.00 |
| Performance turf, sod | 0570-1-2 | SY | 228 | 49 (21%) | $5.40 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Preferred Materials Inc. | 153 | 95 of 153 |
| C.W. Roberts Contracting, Inc. | 101 | 68 of 101 |
| Hubbard Construction Company | 74 | 50 of 74 |
| Watson Civil Construction, Inc. | 52 | 32 of 52 |
| Superior Asphalt, Inc. | 43 | 24 of 43 |
| Ohla USA Inc | 31 | 13 of 31 |
| Blacktip Services Incorporated | 30 | 25 of 30 |
| Russell Engineering, Inc. | 29 | 16 of 29 |
| Cone & Graham, Inc. | 19 | 12 of 19 |
| Wright Construction Group, Inc. | 18 | 9 of 18 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1937 | District 1 | 44620415201 | 1 of 4 | $21,994,345 | Low, 6.0% under the second |
| 28 OCT 2026 | T1941 | District 1 | SR 29 FROM N OF OIL WELL RD (CR 858) TO N OF BRIDGE #030304 | 1 of 2 | $3,830,094 | Low, 11% under the second |
| 28 OCT 2026 | T1947 | District 1 | 43975025201 | 1 of 4 | $16,495,027 | Low, 3.0% under the second |
| 28 OCT 2026 | T1949 | District 1 | SR 93 (I-75) FROM N OF ALICO RD TO S OF DANIELS PKWY | 2 of 3 | $6,744,868 | +2.0% |
| 28 OCT 2026 | T7591 | District 7 | SR 600 (US 92) FROM EUREKA SPRINGS RD TO THONOTOSASSA RD | 3 of 5 | $18,525,449 | +11% |
| 28 OCT 2026 | T7616 | District 7 | SR 55 (US 19) FROM S OF TUDOR LN TO N OF TUDOR LN | 5 of 5 | $1,067,387 | +20% |
| 30 SEP 2026 | T7622 | District 7 | SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM | 9 of 9 | $998,720 | +69% |
| 26 AUG 2026 | T1940 | District 1 | SR 25 (US 27) FROM SANTA MARIA WAY TO LAKE ISIS AVE | 1 of 4 | $17,290,361 | Low, 6.0% under the second |
| 26 AUG 2026 | T1945 | District 1 | SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF | 2 of 5 | $16,549,096 | +6.0% |
| 26 AUG 2026 | T7614 | District 7 | SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD | 5 of 6 | $5,897,601 | +7.0% |
| 29 JUL 2026 | T1939 | District 1 | SR 25 (US 27) FROM S OF WAYMAN RD TO N OF FISH EATING CREEK | 3 of 4 | $18,472,862 | +1.0% |
| 29 JUL 2026 | T1942 | District 1 | SR 64 FROM W OF CR 675 TO WINGATE RD | 2 of 4 | $9,933,293 | +20% |
| 29 JUL 2026 | T7599 | District 7 | SR 45 (US 41) FROM S OF COUNTY LINE RD TO S OF POWELL RD | 4 of 4 | $9,595,574 | +21% |
| 29 JUL 2026 | T7619 | District 7 | MULTIUSE TRAIL AT SR 60 (W COURTNEY CAMPBELL CAUSEWAY) | 3 of 6 | $2,408,939 | +48% |
| 10 JUN 2026 | T1930 | District 1 | SR 25/SR 80 (US 27) FROM INDUSTRIAL CANAL TO W SAGAMORE AVE | 1 of 5 | $4,783,901 | Low, 1.0% under the second |
| 10 JUN 2026 | T7534 | District 7 | US 41B (N TAMPA ST) AND N FLORIDA AVE FROM JACKSON ST TO... | 4 of 4 | $39,696,018 | +68% |
| 20 MAY 2026 | T1933 | District 1 | SR 25 (US 27) FROM MP 4.478 TO MP 4.856 | 4 of 6 | $6,576,642 | +22% |
| 20 MAY 2026 | T7587 | District 7 | SR 597 (N DALE MABRY HWY) FROM N OF W SOUTH AVE TO N OF W... | 4 of 5 | $10,788,825 | +45% |
| 20 MAY 2026 | T7595 | District 7 | SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO | 8 of 8 | $15,187,558 | +19% |
| 20 MAY 2026 | T7607 | District 7 | SR 93 (I-75) AT CR 54 | 5 of 6 | $1,913,893 | +14% |
| 29 APR 2026 | T7562 | District 7 | SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)... | 7 of 7 | $54,886,754 | +98% |
| 29 APR 2026 | T7611 | District 7 | SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST | 4 of 9 | $11,790,338 | +15% |
| 29 APR 2026 | T7615 | District 7 | SR 595 (651 / ALT US 19 / N MISSOURI AVE) AT ROSERY RD | 4 of 4 | $1,160,668 | +25% |
| 25 MAR 2026 | T1915 | District 1 | SR 78 FROM W OF SANTA BARBARA BLVD TO E OF DEL PRADO BLVD | 1 of 4 | $6,891,904 | Low, 3.0% under the second |
| 25 MAR 2026 | T1919 | District 1 | SR 35 (US 17) FROM S OF PINEGROVE CR TO N OF WASHINGTON LOOP | 1 of 4 | $7,440,041 | Low, 2.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.