Wright Construction Group, Inc.: FDOT bid record
Wright Construction Group, Inc. submitted 28 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 MAY 2025, and was the low bidder on 5 of them (18%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $28,176,396
- Latest bid
- 28 MAY 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 9 | 1 | 11% |
| 2019 | 8 | 2 | 25% |
| 2020 | 1 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 1 | 1 | 100% |
| 2025 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 42 | 32 (76%) | $7.17 | $16.54 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 29 | 22 (76%) | $492.00 | $1,150.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 42 | 19 (45%) | $26.00 | $30.82 |
| Work zone sign | 0102-60 | ED | 22 | 19 (86%) | $0.21 | $0.25 |
| Electrical service wire, & install | 0639-2-1 | LF | 24 | 18 (75%) | $4.65 | $8.33 |
| Sediment barrier | 0104-10-3 | LF | 22 | 17 (77%) | $0.95 | $2.60 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 21 | 17 (81%) | $0.11 | $0.13 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 21 | 16 (76%) | $49.90 | $86.00 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 17 | 15 (88%) | $1,000.00 | $1,350.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 21 | 14 (67%) | $10.50 | $12.00 |
| Performance turf, sod | 0570-1-2 | SY | 21 | 14 (67%) | $2.35 | $5.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 20 | 14 (70%) | $5.00 | $5.90 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ajax Paving Industries of Florida LLC | 18 | 9 of 18 |
| Community Asphalt Corp. | 9 | 3 of 9 |
| Preferred Materials Inc. | 7 | 4 of 7 |
| Watson Civil Construction, Inc. | 5 | 5 of 5 |
| Russell Engineering, Inc. | 4 | 2 of 4 |
| Traffic Control Devices, Inc. | 4 | 2 of 4 |
| V & H Construction, Inc. | 3 | 2 of 3 |
| Ibt Construction, LLC | 3 | 1 of 3 |
| Florida Safety Contractors, Inc. | 3 | 1 of 3 |
| American Lighting and Signalization, LLC. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 MAY 2025 | T1926 | District 1 | SR 93 (I-75) AT CR 876 (DANIELS PKWY) | 4 of 5 | $44,545,308 | +4.0% |
| 13 NOV 2024 | T1898 | District 1 | SR 80 AND SR 82 FROM VERONICA SHOWMAKER BLVD TO KINGSTON... | 1 of 2 | $7,155,811 | Low, 6.0% under the second |
| 06 DEC 2023 | T1887 | District 1 | SR 865 (SAN CARLOS BLVD), FROM N OF CRESCENT ST TO N OF... | 1 of 4 | $13,177,472 | Low, 15% under the second |
| 07 DEC 2022 | T1860 | District 1 | COPELAND AVE AND SR 90 (US 41) | 2 of 3 | $4,683,804 | +8.0% |
| 27 JUL 2022 | T1843 | District 1 | SR 884 (COLONIAL BLVD) | 2 of 3 | $4,220,783 | +1.0% |
| 09 JUN 2021 | T1761 | District 1 | SR 80 | 3 of 6 | $4,398,129 | +7.0% |
| 28 APR 2021 | T1797 | District 1 | SR 45 | 3 of 4 | $1,717,086 | +9.0% |
| 31 MAR 2021 | T1770 | District 1 | SR 72 | 6 of 8 | $3,600,000 | +40% |
| 31 MAR 2021 | T1783 | District 1 | SR 93 (I-75) | 6 of 7 | $62,074,783 | +18% |
| 17 FEB 2021 | T1778 | District 1 | SR 90 (US 41) | 2 of 4 | $5,499,518 | +7.0% |
| 29 JUL 2020 | T1789 | District 1 | SR 45 (US 41) | 2 of 5 | $2,472,849 | +5.0% |
| 04 DEC 2019 | T1755 | District 1 | SR 776 | 4 of 4 | $6,549,978 | +17% |
| 30 OCT 2019 | T1768 | District 1 | SR 29 | 1 of 4 | $1,847,556 | Low, 12% under the second |
| 25 SEP 2019 | T1756 | District 1 | BONITA SPRINGS ELEMENTARY (SRTS) SIDEWALK | 3 of 5 | $1,145,000 | +10% |
| 28 AUG 2019 | T1747 | District 1 | SR 45 (US 41/TAMIAMI TRAIL) | 2 of 6 | $13,669,076 | +12% |
| 31 JUL 2019 | T1769 | District 1 | SR 884 (COLONIAL BLVD) | 2 of 4 | $373,829 | +3.0% |
| 24 APR 2019 | T1724 | District 1 | SR 93 (I-75) | 3 of 4 | $8,993,066 | +4.0% |
| 27 MAR 2019 | T1725 | District 1 | VENTURA AVE | 2 of 2 | $1,439,023 | +46% |
| 27 FEB 2019 | T1742 | District 1 | SR 45 (US 41) | 1 of 6 | $3,732,644 | Low, 10% under the second |
| 05 DEC 2018 | T1717 | District 1 | SR 45A (US 41) (VENICE BYPASS) | 7 of 8 | $20,409,324 | +29% |
| 05 DEC 2018 | T1739 | District 1 | SR 776 | 2 of 4 | $1,106,000 | +1.0% |
| 26 SEP 2018 | T1734 | District 1 | SR 45 (US 41) | 4 of 8 | $634,011 | +16% |
| 25 JUL 2018 | T1727 | District 1 | SR 876 (DANIELS PKWY) | 4 of 4 | $2,898,544 | +9.0% |
| 25 JUL 2018 | T1730 | District 1 | JEFFCOTT ST | 4 of 6 | $561,000 | +21% |
| 13 JUN 2018 | T1676 | District 1 | SR 45 (US 41) | 2 of 3 | $20,274,060 | +1.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.