Traffic Control Devices, Inc.: FDOT bid record
Traffic Control Devices, Inc. submitted 104 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 29 APR 2026, and was the low bidder on 24 of them (23%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $34,214,183
- Latest bid
- 29 APR 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 19 | 2 | 11% |
| 2019 | 23 | 3 | 13% |
| 2020 | 13 | 1 | 8% |
| 2021 | 17 | 6 | 35% |
| 2022 | 14 | 7 | 50% |
| 2023 | 5 | 1 | 20% |
| 2024 | 2 | 1 | 50% |
| 2025 | 8 | 2 | 25% |
| 2026 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 32 | 7 | 22% |
| District 1 | 26 | 7 | 27% |
| District 2 | 16 | 7 | 44% |
| District 7 | 11 | 2 | 18% |
| District 4 | 11 | 0 | 0% |
| StateWide | 5 | 1 | 20% |
| District 3 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 103 | 36 (35%) | $22.00 | $30.82 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 103 | 33 (32%) | $1,124.00 | $1,150.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 87 | 30 (34%) | $0.15 | $0.13 |
| Work zone sign | 0102-60 | ED | 89 | 29 (33%) | $0.30 | $0.25 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 106 | 20 (19%) | $12.47 | $16.54 |
| Temporary traffic detection and maintenance, intersection | 0102-107-1 | ED | 28 | 20 (71%) | $2.00 | $11.10 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 75 | 18 (24%) | $6.85 | $5.90 |
| Portable changeable message sign, temporary | 0102-99 | ED | 74 | 17 (23%) | $13.75 | $12.00 |
| Electrical service wire, & install | 0639-2-1 | LF | 64 | 15 (23%) | $7.35 | $8.33 |
| Itsfm subsurface documentation- project length | 0611-1-1 | MI | 24 | 15 (63%) | $1,730.00 | $3,780.07 |
| Fiber optic connection hardware, F&I, buffer tube fan out kit | 0633-3-14 | EACH | 22 | 15 (68%) | $87.00 | $106.23 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-7 | LF | 31 | 14 (45%) | $5.60 | $5.80 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| American Lighting and Signalization, LLC. | 63 | 26 of 63 |
| Chinchor Electric Inc. | 57 | 38 of 57 |
| Highway Safety Devices, Inc. | 50 | 18 of 50 |
| Powercore, Inc. | 41 | 21 of 41 |
| Sice Inc | 28 | 18 of 28 |
| Florida Safety Contractors, Inc. | 24 | 13 of 24 |
| Contact Network LLC | 16 | 12 of 16 |
| Horsepower Electric, Inc. | 15 | 8 of 15 |
| Carr Construction, LLC | 10 | 7 of 10 |
| Traffic Management Solutions, LLC | 9 | 8 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 APR 2026 | T3997 | District 3 | SR 10 (US 90 / W TENNESSEE ST) FROM CALLARK ST TO W BREVARD | 3 of 4 | $1,145,145 | +19% |
| 25 MAR 2026 | T3962 | District 3 | SR 75 (US 231) AT CR 388 | 2 of 2 | $1,238,238 | +4.0% |
| 25 MAR 2026 | T5878 | District 5 | SR 438 AT HASTINGS ST / SHERINGHAM RD INTERSECTION | 1 of 3 | $1,041,041 | Low, 1.0% under the second |
| 29 OCT 2025 | T5873 | District 5 | SR 200 (SW COLLEGE RD) AT SW 60TH AVE | 2 of 2 | $1,072,250 | +6.0% |
| 24 SEP 2025 | T5867 | District 5 | SR 423 (LEE RD) FROM W OF KINGSWOOD DR TO E OF ADANSON ST | 2 of 2 | $3,756,000 | +6.0% |
| 30 JUL 2025 | T7574 | District 7 | SR 93 (I-75), 93A (I-275) and SR 400 (I-4) FROM MANATEE/PI.. | 5 of 6 | $5,127,127 | +17% |
| 11 JUN 2025 | T5856 | District 5 | HIGH BRIDGE AND MAIN STREET BRIDGE FROM EB DRAWBRIDGE SIG... | 1 of 5 | $549,199 | Low, 14% under the second |
| 28 MAY 2025 | T1900 | District 1 | SR 45 (US 41) FROM 63RD AVE TO 53RD AVE | 3 of 4 | $5,222,222 | +12% |
| 29 JAN 2025 | T2993 | District 2 | SR 200 (US 301) FROM S OF SE 53RD ST TO N OF NW CR 223 | 1 of 3 | $4,420,420 | Low, 8.0% under the second |
| 29 JAN 2025 | T5845 | District 5 | SR 9/400 (I-95 / I-4) AT SR 400 (I-4 / US 92) INTERCHANGES | 3 of 5 | $2,339,000 | +14% |
| 29 JAN 2025 | T9044 | StateWide | SR 5 (US17) AT YULEE WEIGH STATION | 2 of 3 | $555,555 | +41% |
| 30 OCT 2024 | T5832 | District 5 | SR 430 (MASON AVE) FROM CLYDE MORRIS BLVD TO E OF BEACH ST | 2 of 3 | $14,062,551 | +17% |
| 27 MAR 2024 | T9033 | StateWide | SR 15 (US 17) AT NB AND SB PALATKA WEIGH STATIONS | 1 of 2 | $422,422 | Low, 0.0% under the second |
| 15 NOV 2023 | T3882 | District 3 | SR 83 (US 331) AND SR 30 (US 98) AT VARIOUS LOCATIONS AS ... | 2 of 2 | $11,164,164 | +10% |
| 13 SEP 2023 | T5794 | District 5 | SR 423 (JOHN YOUNG PKWY) FROM SR 408 TO SHADER RD | 4 of 4 | $923,333 | +31% |
| 14 JUN 2023 | T2925 | District 2 | SR223(ALT US301/TRUCK ROUTE) | 1 of 3 | $4,229,229 | Low, 4.0% under the second |
| 24 MAY 2023 | T5790 | District 5 | SR 93 (I-75) | 2 of 2 | $775,500 | +3.0% |
| 29 MAR 2023 | T5785 | District 5 | I-95 | 2 of 4 | $594,000 | +13% |
| 07 DEC 2022 | T5774 | District 5 | SR 500 (US 27) (US 441) | 1 of 3 | $662,662 | Low, 14% under the second |
| 26 OCT 2022 | T2889 | District 2 | SR 115 (MLK EXPY) | 2 of 3 | $4,345,345 | +13% |
| 26 OCT 2022 | T4625 | District 4 | SR 5 US 1) AND SR 794 | 4 of 7 | $4,197,197 | +18% |
| 05 OCT 2022 | T5766 | District 5 | SR 50 | 1 of 3 | $1,397,100 | Low, 0.0% under the second |
| 05 OCT 2022 | T5769 | District 5 | SR 438 | 1 of 3 | $1,830,300 | Low, 26% under the second |
| 27 JUL 2022 | T5750 | District 5 | SR 44 | 2 of 3 | $1,062,062 | +10% |
| 15 JUN 2022 | T2866 | District 2 | SR 105 | 2 of 4 | $1,791,791 | +1.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.