Horsepower Electric, Inc.: FDOT bid record
Horsepower Electric, Inc. submitted 61 bids on Florida DOT contracts in the data, from 13 JUN 2018 to 26 AUG 2026, and was the low bidder on 10 of them (16%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $11,423,688
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 0 | 0% |
| 2019 | 10 | 3 | 30% |
| 2020 | 8 | 2 | 25% |
| 2021 | 8 | 2 | 25% |
| 2022 | 5 | 0 | 0% |
| 2023 | 4 | 1 | 25% |
| 2024 | 6 | 1 | 17% |
| 2025 | 9 | 1 | 11% |
| 2026 | 9 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 27 | 2 | 7% |
| District 6 | 20 | 6 | 30% |
| District 1 | 11 | 2 | 18% |
| District 5 | 2 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection system | 0104-18 | EACH | 42 | 27 (64%) | $100.00 | $150.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 86 | 26 (30%) | $30.00 | $30.82 |
| Removal of existing concrete | 0110-4-10 | SY | 49 | 20 (41%) | $39.22 | $33.96 |
| Lighting conductors, remove & dispose, contractor owns | 0715-1-60 | LF | 25 | 19 (76%) | $0.10 | $0.50 |
| Sediment barrier | 0104-10-3 | LF | 24 | 15 (63%) | $2.00 | $2.60 |
| Work zone sign | 0102-60 | ED | 56 | 14 (25%) | $0.25 | $0.25 |
| Mowing | 0107-2 | ACRE | 31 | 13 (42%) | $100.00 | $80.65 |
| Portable changeable message sign, temporary | 0102-99 | ED | 56 | 12 (21%) | $12.75 | $12.00 |
| Traffic control officer | 0102-14 | HR | 39 | 12 (31%) | $85.00 | $80.00 |
| Fiber optic cable locator | 0633-6 | DA | 16 | 12 (75%) | $100.00 | $224.54 |
| Lighting conductors, F&I, insulated, no.8 - 6 | 0715-1-12 | LF | 40 | 11 (28%) | $2.62 | $2.40 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 35 | 11 (31%) | $0.10 | $0.07 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Signal Technology and Installation Corp. | 27 | 11 of 27 |
| Weekley Asphalt Paving, Inc. | 26 | 16 of 26 |
| American Lighting and Signalization, LLC. | 25 | 12 of 25 |
| Aum Construction Inc. | 25 | 9 of 25 |
| Sice Inc | 20 | 10 of 20 |
| Arc Electric Inc | 19 | 16 of 19 |
| Traffic Control Devices, Inc. | 15 | 7 of 15 |
| Florida Engineering & Development Corp | 11 | 7 of 11 |
| Chinchor Electric Inc. | 10 | 8 of 10 |
| Under Power Corp | 8 | 3 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | T4757 | District 4 | SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27) | 11 of 12 | $7,995,263 | +31% |
| 26 AUG 2026 | T4773 | District 4 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | 12 of 13 | $4,633,407 | +78% |
| 29 JUL 2026 | T6625 | District 6 | SR 968 (W FLAGLER ST) FROM E OF SW 48 CT TO W OF SW 48 AVE | 5 of 7 | $649,445 | +9.0% |
| 10 JUN 2026 | T4766 | District 4 | SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1) | 8 of 8 | $1,923,992 | +52% |
| 25 MAR 2026 | T1932 | District 1 | SR 82 AT ALABAMA RD | 3 of 4 | $2,378,533 | +27% |
| 25 MAR 2026 | T1934 | District 1 | SR 45 (US 41) AT MIDWAY BLVD | 2 of 4 | $1,769,769 | +3.0% |
| 25 MAR 2026 | T4734 | District 4 | SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS... | 4 of 7 | $1,869,698 | +11% |
| 25 MAR 2026 | T4735 | District 4 | SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS.. | 3 of 6 | $3,869,869 | +11% |
| 28 JAN 2026 | T4750 | District 4 | SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | 10 of 11 | $2,370,442 | +28% |
| 03 DEC 2025 | T4717 | District 4 | SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1) | 6 of 8 | $2,545,360 | +13% |
| 03 DEC 2025 | T6614 | District 6 | SR 817 (NW 27 AVE) FRM SESAME ST TO DUNAD AVE | 1 of 6 | $868,500 | Low, 0.0% under the second |
| 03 DEC 2025 | T6620 | District 6 | SR A1A (COLLINS AVE) FROM S OF SR 826 TO N OF 178 ST | 3 of 5 | $1,559,244 | +8.0% |
| 29 OCT 2025 | T4743 | District 4 | SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL | 6 of 10 | $2,881,116 | +16% |
| 29 OCT 2025 | T6621 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN | 4 of 6 | $3,853,017 | +8.0% |
| 27 AUG 2025 | T6609 | District 6 | SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT | 7 of 7 | $2,069,207 | +20% |
| 28 MAY 2025 | T4707 | District 4 | SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME.. | 3 of 6 | $3,435,793 | +9.0% |
| 26 FEB 2025 | T6588 | District 6 | SR 7 (US 441/NW 8 AVE/NW 7 AVE) AND SR 993 (NW 12 AVE) FROM. | 5 of 6 | $2,919,069 | +50% |
| 29 JAN 2025 | T6576 | District 6 | SR 932 (NW 103RD ST) AT NW 103 ST AND NW 32 AVE | 5 of 9 | $1,769,769 | +10% |
| 13 NOV 2024 | T1898 | District 1 | SR 80 AND SR 82 FROM VERONICA SHOWMAKER BLVD TO KINGSTON... | 2 of 2 | $7,607,495 | +6.0% |
| 28 AUG 2024 | T6568 | District 6 | SR 915 (NE 6 AVE) AT NE 139 ST | 6 of 6 | $1,268,307 | +19% |
| 28 AUG 2024 | T6597 | District 6 | SR 5 (US 1) AT SW 17 AVE | 3 of 4 | $1,799,999 | +8.0% |
| 31 JUL 2024 | T4703 | District 4 | SR 5, SR 704, SR 809, SR 882, SR 818, SR 811, SR 7 AND SR814 | 3 of 6 | $749,000 | +9.0% |
| 28 FEB 2024 | T6466 | District 6 | SR 916 (NE 135 ST) AT NE 12TH AVE | 1 of 5 | $749,749 | Low, 2.0% under the second |
| 31 JAN 2024 | T4654 | District 4 | SR 9 (I-95), SR 93 (I-75) AND SR 862 (I-595) AT VARIOUS .. | 3 of 5 | $6,269,962 | +11% |
| 06 DEC 2023 | T4658 | District 4 | SR 842, SR 845, SR 811, SR A1A AND SR 810 | 2 of 6 | $649,649 | +4.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.