Signal Technology and Installation Corp.: FDOT bid record
Signal Technology and Installation Corp. submitted 63 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 OCT 2026, and was the low bidder on 3 of them (5%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $4,103,644
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 0 | 0% |
| 2019 | 5 | 0 | 0% |
| 2020 | 5 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 5 | 1 | 20% |
| 2023 | 3 | 0 | 0% |
| 2024 | 7 | 0 | 0% |
| 2025 | 18 | 2 | 11% |
| 2026 | 10 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 32 | 2 | 6% |
| District 6 | 21 | 0 | 0% |
| District 5 | 4 | 1 | 25% |
| District 1 | 4 | 0 | 0% |
| District 3 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Electrical service wire, & install | 0639-2-1 | LF | 42 | 27 (64%) | $7.39 | $8.33 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 45 | 17 (38%) | $92.27 | $65.00 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 43 | 13 (30%) | $111.65 | $86.00 |
| Litter removal | 0107-1 | ACRE | 34 | 13 (38%) | $82.19 | $52.98 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 83 | 12 (14%) | $1,718.58 | $1,150.00 |
| Pedestrian signal, furnish & install LED countdown, 1 way | 0653-1-11 | AS | 26 | 12 (46%) | $985.69 | $900.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 57 | 11 (19%) | $7.12 | $5.90 |
| Removal of existing concrete | 0110-4-10 | SY | 55 | 11 (20%) | $42.18 | $33.96 |
| Signal cable- new or reconstructed intersection, furnish & install | 0632-7-1 | PI | 30 | 11 (37%) | $10,185 | $8,921.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 61 | 10 (16%) | $0.18 | $0.13 |
| Electrical power service, F&I, underground, meter by contractor | 0639-1122 | AS | 41 | 10 (24%) | $6,384.98 | $4,500.00 |
| Work zone sign | 0102-60 | ED | 60 | 9 (15%) | $0.33 | $0.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aum Construction Inc. | 41 | 31 of 41 |
| Horsepower Electric, Inc. | 27 | 16 of 27 |
| Arc Electric Inc | 26 | 21 of 26 |
| Weekley Asphalt Paving, Inc. | 23 | 13 of 23 |
| Under Power Corp | 16 | 6 of 16 |
| Sice Inc | 14 | 13 of 14 |
| American Lighting and Signalization, LLC. | 13 | 7 of 13 |
| Carr Construction, LLC | 11 | 8 of 11 |
| Florida Engineering & Development Corp | 8 | 4 of 8 |
| Traffic Management Solutions, LLC | 8 | 5 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T5894 | District 5 | SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD | 2 of 5 | $2,569,126 | +3.0% |
| 26 AUG 2026 | T1948 | District 1 | AT CENTRAL ELEMENTARY | 10 of 10 | $1,717,781 | +135% |
| 26 AUG 2026 | T4757 | District 4 | SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27) | 7 of 12 | $6,989,854 | +14% |
| 26 AUG 2026 | T4773 | District 4 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | 11 of 13 | $4,169,372 | +60% |
| 29 JUL 2026 | T4747 | District 4 | SR 5 (S FEDERAL HWY) FROM SR 5 (US1 / N DIXIE HWY) TO 10TH AVE S | 6 of 6 | $1,206,381 | +45% |
| 29 JUL 2026 | T6625 | District 6 | SR 968 (W FLAGLER ST) FROM E OF SW 48 CT TO W OF SW 48 AVE | 6 of 7 | $656,163 | +10% |
| 20 MAY 2026 | T4737 | District 4 | SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS... | 7 of 7 | $3,900,737 | +37% |
| 25 MAR 2026 | T4734 | District 4 | SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS... | 2 of 7 | $1,690,646 | 0.0% |
| 25 MAR 2026 | T4735 | District 4 | SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS.. | 2 of 6 | $3,552,812 | +2.0% |
| 28 JAN 2026 | T4750 | District 4 | SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | 9 of 11 | $2,345,343 | +26% |
| 03 DEC 2025 | T3A01 | District 3 | SR 83 (US 331) AT ROCK HILL RD | 2 of 2 | $1,575,177 | +65% |
| 03 DEC 2025 | T4717 | District 4 | SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1) | 8 of 8 | $2,665,028 | +18% |
| 03 DEC 2025 | T6614 | District 6 | SR 817 (NW 27 AVE) FRM SESAME ST TO DUNAD AVE | 6 of 6 | $992,680 | +14% |
| 29 OCT 2025 | T4743 | District 4 | SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL | 7 of 10 | $2,998,906 | +21% |
| 29 OCT 2025 | T6621 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN | 3 of 6 | $3,725,405 | +4.0% |
| 24 SEP 2025 | T1929 | District 1 | SR 70 (15TH ST E) FROM 30TH AVE E TO 26TH AVE E | 2 of 4 | $1,238,318 | +7.0% |
| 24 SEP 2025 | T4721 | District 4 | SR 811 (DIXIE HWY) FROM N OF SR 816 (OAKLAND PARK BLVD) TO.. | 2 of 4 | $926,909 | +12% |
| 24 SEP 2025 | T4752 | District 4 | SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW.. | 3 of 5 | $319,104 | +14% |
| 27 AUG 2025 | T5864 | District 5 | SR 600 (US 92) AT LOCKHART ST | 1 of 2 | $1,062,598 | Low, 13% under the second |
| 27 AUG 2025 | T5872 | District 5 | SR 438 (SILVER STAR RD) FROM COAST LINE DR TO DARDANELLE DR | 2 of 4 | $2,699,032 | +2.0% |
| 27 AUG 2025 | T6609 | District 6 | SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT | 4 of 7 | $1,890,589 | +10% |
| 11 JUN 2025 | T1914 | District 1 | SR 35 (US 17) FROM REA RD TO SR 62 | 5 of 6 | $2,719,013 | +31% |
| 11 JUN 2025 | T5856 | District 5 | HIGH BRIDGE AND MAIN STREET BRIDGE FROM EB DRAWBRIDGE SIG... | 5 of 5 | $1,008,898 | +84% |
| 28 MAY 2025 | T1911 | District 1 | SR 544, SR 17 AND SR 33 AT OLD LUCERNE PARK RD, AT KOKOMO... | 2 of 2 | $2,693,992 | +1.0% |
| 28 MAY 2025 | T4707 | District 4 | SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME.. | 2 of 6 | $3,414,211 | +8.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.