FDOT contract T6609 bid tabulation

SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT. Let by Florida DOT on August 27, 2025, Miami-Dade, District 6. 7 bids received; low bid $1,720,968 by Florida Engineering & Development Corp.

Owner
Florida DOT
Letting
27 AUG 2025
Pay items
99
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Florida Engineering & Development Corp$1,720,968Low
2Aum Construction Inc.$1,744,999+1.0%
3Arc Electric Inc$1,777,778+3.0%
4Signal Technology and Installation Corp.$1,890,589+10%
5Roadway Construction, LLC$1,896,385+10%
6Jva Engineering Contractor, Inc$1,937,647+13%
7Horsepower Electric, Inc.$2,069,207+20%
FDOT contract T6609: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Florida Engineering & Development Corp2. Aum Construction Inc.3. Arc Electric Inc4. Signal Technology and Installation Corp.5. Roadway Construction, LLC6. Jva Engineering Contractor, Inc
0005Mobilization (0101-1)LS1$170,322$80,000$75,000$87,685$94,000$125,600
0010Mobilization (0101-1)LS1$131,945$80,000$75,000$90,359$94,000$116,100
0015Maintenance of traffic (0102-1)DA1$76,173$60,000$90,000$33,678$182,243$135,500
0020Maintenance of traffic (0102-1)DA1$76,173$60,000$90,000$33,678$182,243$124,200
0025Traffic control officer (0102-14)HR100$97.54$80.00$140.00$101.39$75.00$95.10
0030Work zone sign (0102-60)ED19,800$0.22$0.30$0.25$0.29$0.20$0.25
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED44,280$0.09$0.20$0.12$0.13$0.10$0.11
0040Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD4,050$0.08$0.30$0.10$0.11$0.07$0.06
0045Arrow board / advance warning arrow panel (0102-76)ED720$5.15$10.00$7.00$6.69$5.00$6.30
0050Portable changeable message sign, temporary (0102-99)ED776$10.30$15.00$11.00$13.38$9.50$11.40
0055Temporary signalization and maintenance, intersection (0102-104)ED540$23.18$15.00$8.00$26.95$25.10$23.70
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED540$23.18$15.00$8.00$26.95$25.10$23.70
0065Type III barricade (0102-115)ED1,440$0.26$0.40$0.35$0.34$0.20$0.32
0070Inlet protection system (0104-18)EACH19$97.33$250.00$225.00$143.59$309.67$160.00
0075Litter removal (0107-1)ACRE7.79$0.47$100.00$225.00$114.93$0.01$270.00
0080Mowing (0107-2)ACRE2.39$1.84$150.00$225.00$136.40$0.01$385.00
0085Clearing & grubbing (0110-1-1)ACRE1$22,969$3,664.49$25,000$6,333.60$5,240.38$10,670
0090Removal of existing concrete (0110-4-10)SY352$48.48$40.00$95.00$50.45$171.53$60.00
0095Type B stabilization (0160-4)SY24$11.86$50.00$95.00$68.70$0.01$47.40
0100Optional base, base group 09 (0285-709)SY24$87.80$150.00$250.00$207.72$177.05$120.00
0105Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY11,279$3.86$7.50$3.90$7.31$3.28$5.30
0110Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY2,192$4.12$7.50$5.00$10.51$3.28$5.80
0115Superpave asphaltic conc, traffic C (0334-1-13)TN4.50$382.79$500.00$325.00$1,069.68$717.40$415.00
0120Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN87.90$412.00$600.00$295.00$467.99$400.00$359.00
0125Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN775.40$283.25$300.00$280.00$431.38$226.00$239.00
0130Manhole, adjust (0425-5)EACH8$981.80$1,500.00$1,000.00$1,671.37$500.00$1,130.00
0135Concrete curb & gutter, type F (0520-1-10)LF295$64.96$50.00$85.00$60.08$167.83$61.30
0140Concrete sidewalk and driveways, 4" thick (0522-1)SY139$74.35$100.00$140.00$110.34$282.44$101.00
0145Concrete sidewalk and driveways, 6" thick (0522-2)SY190$100.48$130.00$200.00$130.51$427.99$112.00
0150Detectable warnings (0527-2)SF136$45.99$45.00$60.00$46.80$87.17$44.00
0155Performance turf, sod (0570-1-2)SY15$10.26$75.00$80.00$147.09$125.77$35.00
0160Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00$1,000.00
0165Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$1,032.01$1,032.01$1,032.01$1,032.01$1,032.01$1,032.01
0170Initial contingency amount, DO not bid (0999-25)LS1$18,739$18,739$18,739$18,739$18,739$18,739
0175Initial contingency amount, DO not bid (0999-25)LS1$31,026$31,026$31,026$31,026$31,026$31,026
0180Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH7$612.85$800.00$1,000.00$775.52$500.00$705.00
0185Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,935.50$2,400.00$1,350.00$2,474.35$1,800.00$3,380.00
0190Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$3,038.50$2,600.00$1,500.00$3,420.58$1,900.00$3,500.00
0195Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212)EACH2$3,656.50$3,600.00$2,000.00$7,860.00$1,400.00$4,210.00
0200Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1312)EACH1$3,656.50$4,000.00$1,800.00$3,565.13$1,750.00$4,210.00
0205Single column ground sign assembly, remove (0700-1600)EACH5$10.30$150.00$400.00$66.86$150.00$12.00
0210Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$190.55$300.00$250.00$367.70$500.00$260.00
0215Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH3$1,287.50$1,200.00$1,000.00$1,270.57$750.00$1,345.66
0220Sign panel, remove, UP to 12 SF (0700-3601)EACH3$72.10$100.00$200.00$133.71$200.00$83.00
0225Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH3$123.60$350.00$200.00$193.88$120.00$142.00
0230Raised pavement marker, type B (0706-1-3)EACH317$5.15$7.50$7.00$5.35$5.00$5.90
0235Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF39$2.06$15.00$22.00$4.15$2.00$20.00
0240Painted pavement markings, surface (0710-90)LS1$3,580.28$10,000$8,000.00$13,106$3,475.80$5,930.00
0245Painted pavement markings, surface (0710-90)LS1$3,580.28$7,500.00$5,500.00$9,182.50$3,475.80$2,315.00
0250Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.03$7,621.94$25,000$12,500$15,673$7,161.29$8,770.00
0255Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF919$2.47$4.00$6.00$3.01$2.40$2.85
0260Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF108$3.71$6.00$8.00$4.46$3.60$4.30
0265Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF273$4.94$7.00$10.00$5.69$4.80$5.70
0270Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.02$2,369.09$15,000$5,000.00$5,930.91$2,090.91$2,730.00
0275Thermoplastic, standard, arrow (0711-11170)EACH27$82.40$150.00$100.00$267.42$80.00$95.00
0280Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.01$6,526.00$25,000$10,000$5,932.00$12,672$7,510.00
0285Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF777$19.57$24.00$22.00$24.74$19.00$22.50
0290Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM0.25$8,701.44$7,500.00$9,000.00$8,958.52$8,448.00$10,000
0295Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM0.06$8,701.38$12,000$9,000.00$8,958.80$8,739.31$10,000
0300Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.69$6,526.09$7,500.00$9,000.00$8,691.12$6,308.57$7,510.00
0305Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.48$2,369.00$5,500.00$5,000.00$6,083.82$2,290.46$2,730.00
0310Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.38$6,526.08$7,500.00$9,000.00$8,691.15$6,286.37$7,510.00
0315Conduit, furnish & install, directional bore (0630-2-12)LF2,985$36.67$40.00$44.00$46.80$38.80$47.40
0320Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$14,717$15,000$15,000$8,965.22$15,694$13,630
0325Signal cable, remove- intersection (0632-7-6)PI2$738.41$500.00$500.00$2,020.69$802.60$710.00
0330Fiber optic cable locator (0633-6)DA180$288.50$140.00$150.00$348.35$0.01$300.00
0335Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH68$1,250.42$2,000.00$1,800.00$1,909.39$1,338.70$1,956.00
0340Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH2$2,312.25$3,000.00$3,000.00$3,146.19$2,472.40$3,080.00
0345Pull & splice box, install (0635-2-30)EACH2$870.04$1,500.00$1,800.00$1,347.13$941.80$1,480.00
0350Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$5,984.92$7,500.00$7,800.00$7,862.45$6,372.80$6,995.00
0355Electrical service wire, & install (0639-2-1)LF833$11.02$10.00$15.00$6.49$11.80$10.70
0360Electrical service wire, (0639-2-6)LF773$0.10$1.00$1.00$1.47$0.20$1.19
0365Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH1$553.83$750.00$2,800.00$438.73$601.90$1,000.00
0370Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$3,108.44$3,000.00$3,000.00$2,169.46$3,330.70$2,490.00
0375Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH2$738.41$1,200.00$400.00$452.15$802.60$830.00
0380Aluminum signals pole, (0646-1-11)EACH7$2,230.36$2,500.00$2,000.00$3,291.25$2,391.30$2,195.00
0385Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH5$2,105.63$2,400.00$2,400.00$3,161.06$2,259.30$2,135.00
0390Steel mast arm assembly, and install, double arm 50'-30' (0649-21-7)EACH1$83,196$86,500$100,000$89,239$88,256$97,810
0395Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$80,408$85,000$95,000$79,573$85,254$90,700
0400Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH2$3,322.58$5,000.00$4,500.00$5,274.92$3,611.40$4,740.00
0405Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS6$1,368.66$2,000.00$2,200.00$1,850.04$1,455.60$1,780.00
0410Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18)AS1$2,099.14$2,500.00$2,500.00$2,648.55$2,233.50$2,960.00
0415Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS13$1,279.57$1,900.00$2,000.00$1,694.91$1,361.30$2,370.00
0420Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH10$437.54$650.00$700.00$943.90$468.20$1,090.00
0425Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$952.13$1,800.00$1,500.00$1,099.28$1,017.80$1,420.00
0430Loop detector inductive, F&I, type 9 (0660-1109)EACH5$344.74$300.00$500.00$236.93$367.30$710.00
0435Loop detector inductive, remove- cabinet to remain (0660-1600)EACH6$92.39$50.00$100.00$13.48$100.40$65.20
0440Loop assembly, F&I, type F (0660-2106)AS5$1,630.59$2,000.00$3,000.00$3,188.06$1,727.10$2,310.00
0445Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH4$5,456.53$7,000.00$5,500.00$7,115.08$5,792.30$6,200.00
0450Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH4$2,729.71$3,500.00$3,200.00$3,247.01$2,908.50$3,675.00
0455Vehicle detection system- remove (0660-4-60)EACH2$184.68$500.00$500.00$584.95$200.70$150.00
0460Pedestrian detector, furnish & install, standard (0665-1-11)EACH16$330.01$450.00$650.00$590.36$354.40$426.00
0465Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH4$92.39$50.00$200.00$219.36$100.40$60.00
0470Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180)AS1$45,498$50,000$43,473$50,198$48,247$61,650
0475Traffic controller assembly, remove controller with (0670-5600)AS2$738.41$1,500.00$500.00$2,339.77$802.60$710.00
0480Cellular modem, furnish and install (0684-8-1)EACH1$1,894.27$2,500.00$2,000.00$5,685.15$2,008.70$2,730.00
0485Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH2$2,809.22$3,500.00$4,200.00$4,300.03$2,981.80$3,675.00
0490Initial contingency amount, DO not bid (0999-25)LS1$234.30$234.30$234.30$234.30$234.30$234.30
0495Utility fixture, valve assembly, adjust/modify (1080-24500)EACH7$1,003.19$1,000.00$1,000.00$953.69$650.00$1,050.00
FDOT contract T6609: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy