FDOT contract T6609 bid tabulation
SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT. Let by Florida DOT on August 27, 2025, Miami-Dade, District 6. 7 bids received; low bid $1,720,968 by Florida Engineering & Development Corp.
- Owner
- Florida DOT
- Letting
- 27 AUG 2025
- Pay items
- 99
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Florida Engineering & Development Corp | $1,720,968 | Low |
| 2 | Aum Construction Inc. | $1,744,999 | +1.0% |
| 3 | Arc Electric Inc | $1,777,778 | +3.0% |
| 4 | Signal Technology and Installation Corp. | $1,890,589 | +10% |
| 5 | Roadway Construction, LLC | $1,896,385 | +10% |
| 6 | Jva Engineering Contractor, Inc | $1,937,647 | +13% |
| 7 | Horsepower Electric, Inc. | $2,069,207 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Florida Engineering & Development Corp | 2. Aum Construction Inc. | 3. Arc Electric Inc | 4. Signal Technology and Installation Corp. | 5. Roadway Construction, LLC | 6. Jva Engineering Contractor, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $170,322 | $80,000 | $75,000 | $87,685 | $94,000 | $125,600 |
| 0010 | Mobilization (0101-1) | LS | 1 | $131,945 | $80,000 | $75,000 | $90,359 | $94,000 | $116,100 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $76,173 | $60,000 | $90,000 | $33,678 | $182,243 | $135,500 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $76,173 | $60,000 | $90,000 | $33,678 | $182,243 | $124,200 |
| 0025 | Traffic control officer (0102-14) | HR | 100 | $97.54 | $80.00 | $140.00 | $101.39 | $75.00 | $95.10 |
| 0030 | Work zone sign (0102-60) | ED | 19,800 | $0.22 | $0.30 | $0.25 | $0.29 | $0.20 | $0.25 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 44,280 | $0.09 | $0.20 | $0.12 | $0.13 | $0.10 | $0.11 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 4,050 | $0.08 | $0.30 | $0.10 | $0.11 | $0.07 | $0.06 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 720 | $5.15 | $10.00 | $7.00 | $6.69 | $5.00 | $6.30 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 776 | $10.30 | $15.00 | $11.00 | $13.38 | $9.50 | $11.40 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 540 | $23.18 | $15.00 | $8.00 | $26.95 | $25.10 | $23.70 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 540 | $23.18 | $15.00 | $8.00 | $26.95 | $25.10 | $23.70 |
| 0065 | Type III barricade (0102-115) | ED | 1,440 | $0.26 | $0.40 | $0.35 | $0.34 | $0.20 | $0.32 |
| 0070 | Inlet protection system (0104-18) | EACH | 19 | $97.33 | $250.00 | $225.00 | $143.59 | $309.67 | $160.00 |
| 0075 | Litter removal (0107-1) | ACRE | 7.79 | $0.47 | $100.00 | $225.00 | $114.93 | $0.01 | $270.00 |
| 0080 | Mowing (0107-2) | ACRE | 2.39 | $1.84 | $150.00 | $225.00 | $136.40 | $0.01 | $385.00 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $22,969 | $3,664.49 | $25,000 | $6,333.60 | $5,240.38 | $10,670 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 352 | $48.48 | $40.00 | $95.00 | $50.45 | $171.53 | $60.00 |
| 0095 | Type B stabilization (0160-4) | SY | 24 | $11.86 | $50.00 | $95.00 | $68.70 | $0.01 | $47.40 |
| 0100 | Optional base, base group 09 (0285-709) | SY | 24 | $87.80 | $150.00 | $250.00 | $207.72 | $177.05 | $120.00 |
| 0105 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 11,279 | $3.86 | $7.50 | $3.90 | $7.31 | $3.28 | $5.30 |
| 0110 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 2,192 | $4.12 | $7.50 | $5.00 | $10.51 | $3.28 | $5.80 |
| 0115 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 4.50 | $382.79 | $500.00 | $325.00 | $1,069.68 | $717.40 | $415.00 |
| 0120 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 87.90 | $412.00 | $600.00 | $295.00 | $467.99 | $400.00 | $359.00 |
| 0125 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 775.40 | $283.25 | $300.00 | $280.00 | $431.38 | $226.00 | $239.00 |
| 0130 | Manhole, adjust (0425-5) | EACH | 8 | $981.80 | $1,500.00 | $1,000.00 | $1,671.37 | $500.00 | $1,130.00 |
| 0135 | Concrete curb & gutter, type F (0520-1-10) | LF | 295 | $64.96 | $50.00 | $85.00 | $60.08 | $167.83 | $61.30 |
| 0140 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 139 | $74.35 | $100.00 | $140.00 | $110.34 | $282.44 | $101.00 |
| 0145 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 190 | $100.48 | $130.00 | $200.00 | $130.51 | $427.99 | $112.00 |
| 0150 | Detectable warnings (0527-2) | SF | 136 | $45.99 | $45.00 | $60.00 | $46.80 | $87.17 | $44.00 |
| 0155 | Performance turf, sod (0570-1-2) | SY | 15 | $10.26 | $75.00 | $80.00 | $147.09 | $125.77 | $35.00 |
| 0160 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0165 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,032.01 | $1,032.01 | $1,032.01 | $1,032.01 | $1,032.01 | $1,032.01 |
| 0170 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $18,739 | $18,739 | $18,739 | $18,739 | $18,739 | $18,739 |
| 0175 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $31,026 | $31,026 | $31,026 | $31,026 | $31,026 | $31,026 |
| 0180 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 7 | $612.85 | $800.00 | $1,000.00 | $775.52 | $500.00 | $705.00 |
| 0185 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,935.50 | $2,400.00 | $1,350.00 | $2,474.35 | $1,800.00 | $3,380.00 |
| 0190 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $3,038.50 | $2,600.00 | $1,500.00 | $3,420.58 | $1,900.00 | $3,500.00 |
| 0195 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212) | EACH | 2 | $3,656.50 | $3,600.00 | $2,000.00 | $7,860.00 | $1,400.00 | $4,210.00 |
| 0200 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1312) | EACH | 1 | $3,656.50 | $4,000.00 | $1,800.00 | $3,565.13 | $1,750.00 | $4,210.00 |
| 0205 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $10.30 | $150.00 | $400.00 | $66.86 | $150.00 | $12.00 |
| 0210 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 2 | $190.55 | $300.00 | $250.00 | $367.70 | $500.00 | $260.00 |
| 0215 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 3 | $1,287.50 | $1,200.00 | $1,000.00 | $1,270.57 | $750.00 | $1,345.66 |
| 0220 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $72.10 | $100.00 | $200.00 | $133.71 | $200.00 | $83.00 |
| 0225 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 3 | $123.60 | $350.00 | $200.00 | $193.88 | $120.00 | $142.00 |
| 0230 | Raised pavement marker, type B (0706-1-3) | EACH | 317 | $5.15 | $7.50 | $7.00 | $5.35 | $5.00 | $5.90 |
| 0235 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 39 | $2.06 | $15.00 | $22.00 | $4.15 | $2.00 | $20.00 |
| 0240 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,580.28 | $10,000 | $8,000.00 | $13,106 | $3,475.80 | $5,930.00 |
| 0245 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,580.28 | $7,500.00 | $5,500.00 | $9,182.50 | $3,475.80 | $2,315.00 |
| 0250 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.03 | $7,621.94 | $25,000 | $12,500 | $15,673 | $7,161.29 | $8,770.00 |
| 0255 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 919 | $2.47 | $4.00 | $6.00 | $3.01 | $2.40 | $2.85 |
| 0260 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 108 | $3.71 | $6.00 | $8.00 | $4.46 | $3.60 | $4.30 |
| 0265 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 273 | $4.94 | $7.00 | $10.00 | $5.69 | $4.80 | $5.70 |
| 0270 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.02 | $2,369.09 | $15,000 | $5,000.00 | $5,930.91 | $2,090.91 | $2,730.00 |
| 0275 | Thermoplastic, standard, arrow (0711-11170) | EACH | 27 | $82.40 | $150.00 | $100.00 | $267.42 | $80.00 | $95.00 |
| 0280 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.01 | $6,526.00 | $25,000 | $10,000 | $5,932.00 | $12,672 | $7,510.00 |
| 0285 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 777 | $19.57 | $24.00 | $22.00 | $24.74 | $19.00 | $22.50 |
| 0290 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.25 | $8,701.44 | $7,500.00 | $9,000.00 | $8,958.52 | $8,448.00 | $10,000 |
| 0295 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.06 | $8,701.38 | $12,000 | $9,000.00 | $8,958.80 | $8,739.31 | $10,000 |
| 0300 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.69 | $6,526.09 | $7,500.00 | $9,000.00 | $8,691.12 | $6,308.57 | $7,510.00 |
| 0305 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.48 | $2,369.00 | $5,500.00 | $5,000.00 | $6,083.82 | $2,290.46 | $2,730.00 |
| 0310 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.38 | $6,526.08 | $7,500.00 | $9,000.00 | $8,691.15 | $6,286.37 | $7,510.00 |
| 0315 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,985 | $36.67 | $40.00 | $44.00 | $46.80 | $38.80 | $47.40 |
| 0320 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $14,717 | $15,000 | $15,000 | $8,965.22 | $15,694 | $13,630 |
| 0325 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $738.41 | $500.00 | $500.00 | $2,020.69 | $802.60 | $710.00 |
| 0330 | Fiber optic cable locator (0633-6) | DA | 180 | $288.50 | $140.00 | $150.00 | $348.35 | $0.01 | $300.00 |
| 0335 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 68 | $1,250.42 | $2,000.00 | $1,800.00 | $1,909.39 | $1,338.70 | $1,956.00 |
| 0340 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 2 | $2,312.25 | $3,000.00 | $3,000.00 | $3,146.19 | $2,472.40 | $3,080.00 |
| 0345 | Pull & splice box, install (0635-2-30) | EACH | 2 | $870.04 | $1,500.00 | $1,800.00 | $1,347.13 | $941.80 | $1,480.00 |
| 0350 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $5,984.92 | $7,500.00 | $7,800.00 | $7,862.45 | $6,372.80 | $6,995.00 |
| 0355 | Electrical service wire, & install (0639-2-1) | LF | 833 | $11.02 | $10.00 | $15.00 | $6.49 | $11.80 | $10.70 |
| 0360 | Electrical service wire, (0639-2-6) | LF | 773 | $0.10 | $1.00 | $1.00 | $1.47 | $0.20 | $1.19 |
| 0365 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 1 | $553.83 | $750.00 | $2,800.00 | $438.73 | $601.90 | $1,000.00 |
| 0370 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $3,108.44 | $3,000.00 | $3,000.00 | $2,169.46 | $3,330.70 | $2,490.00 |
| 0375 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 2 | $738.41 | $1,200.00 | $400.00 | $452.15 | $802.60 | $830.00 |
| 0380 | Aluminum signals pole, (0646-1-11) | EACH | 7 | $2,230.36 | $2,500.00 | $2,000.00 | $3,291.25 | $2,391.30 | $2,195.00 |
| 0385 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 5 | $2,105.63 | $2,400.00 | $2,400.00 | $3,161.06 | $2,259.30 | $2,135.00 |
| 0390 | Steel mast arm assembly, and install, double arm 50'-30' (0649-21-7) | EACH | 1 | $83,196 | $86,500 | $100,000 | $89,239 | $88,256 | $97,810 |
| 0395 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 1 | $80,408 | $85,000 | $95,000 | $79,573 | $85,254 | $90,700 |
| 0400 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $3,322.58 | $5,000.00 | $4,500.00 | $5,274.92 | $3,611.40 | $4,740.00 |
| 0405 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 6 | $1,368.66 | $2,000.00 | $2,200.00 | $1,850.04 | $1,455.60 | $1,780.00 |
| 0410 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 1 | $2,099.14 | $2,500.00 | $2,500.00 | $2,648.55 | $2,233.50 | $2,960.00 |
| 0415 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 13 | $1,279.57 | $1,900.00 | $2,000.00 | $1,694.91 | $1,361.30 | $2,370.00 |
| 0420 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 10 | $437.54 | $650.00 | $700.00 | $943.90 | $468.20 | $1,090.00 |
| 0425 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $952.13 | $1,800.00 | $1,500.00 | $1,099.28 | $1,017.80 | $1,420.00 |
| 0430 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 5 | $344.74 | $300.00 | $500.00 | $236.93 | $367.30 | $710.00 |
| 0435 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 6 | $92.39 | $50.00 | $100.00 | $13.48 | $100.40 | $65.20 |
| 0440 | Loop assembly, F&I, type F (0660-2106) | AS | 5 | $1,630.59 | $2,000.00 | $3,000.00 | $3,188.06 | $1,727.10 | $2,310.00 |
| 0445 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $5,456.53 | $7,000.00 | $5,500.00 | $7,115.08 | $5,792.30 | $6,200.00 |
| 0450 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $2,729.71 | $3,500.00 | $3,200.00 | $3,247.01 | $2,908.50 | $3,675.00 |
| 0455 | Vehicle detection system- remove (0660-4-60) | EACH | 2 | $184.68 | $500.00 | $500.00 | $584.95 | $200.70 | $150.00 |
| 0460 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 16 | $330.01 | $450.00 | $650.00 | $590.36 | $354.40 | $426.00 |
| 0465 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 4 | $92.39 | $50.00 | $200.00 | $219.36 | $100.40 | $60.00 |
| 0470 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $45,498 | $50,000 | $43,473 | $50,198 | $48,247 | $61,650 |
| 0475 | Traffic controller assembly, remove controller with (0670-5600) | AS | 2 | $738.41 | $1,500.00 | $500.00 | $2,339.77 | $802.60 | $710.00 |
| 0480 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $1,894.27 | $2,500.00 | $2,000.00 | $5,685.15 | $2,008.70 | $2,730.00 |
| 0485 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 2 | $2,809.22 | $3,500.00 | $4,200.00 | $4,300.03 | $2,981.80 | $3,675.00 |
| 0490 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $234.30 | $234.30 | $234.30 | $234.30 | $234.30 | $234.30 |
| 0495 | Utility fixture, valve assembly, adjust/modify (1080-24500) | EACH | 7 | $1,003.19 | $1,000.00 | $1,000.00 | $953.69 | $650.00 | $1,050.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.