Jva Engineering Contractor, Inc: FDOT bid record

Jva Engineering Contractor, Inc submitted 59 bids on Florida DOT contracts in the data, from 25 APR 2018 to 29 JUL 2026, and was the low bidder on 8 of them (14%). When it was not low, its total sat a median +13% above the low bid.

Owner
Florida DOT
Low bid volume
$12,107,792
Latest bid
29 JUL 2026
Data through
28 OCT 2026
59Bids
8Low bids
14Win rate, percent
+13%Median gap to the low bid when not low, 51 bids

By year

YearBidsLow bidsWin rate
20187229%
20194125%
20208225%
20211119%
2022800%
20235120%
2024300%
20259111%
2026400%
Jva Engineering Contractor, Inc, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 646715%
District 41218%
District 1100%
Jva Engineering Contractor, Inc, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH12625 (20%)$841.28$1,150.00
Conduit, furnish & install, directional bore0630-2-12LF11018 (16%)$27.52$30.82
Traffic control officer0102-14HR5018 (36%)$57.41$80.00
Single post sign, remove0700-1-60AS4217 (40%)$5.66$31.94
Prestressed concrete pole, type P-II service pole0641-2-12EACH6213 (21%)$2,032.55$2,200.00
Single post sign, F&I ground mount, UP to 12 SF0700-1-11AS4213 (31%)$322.50$406.23
Signal cable- new or reconstructed intersection, furnish & install0632-7-1PI4213 (31%)$6,763.55$8,921.00
Removal of existing concrete0110-4-10SY5612 (21%)$21.38$33.96
Detectable warnings0527-2SF5211 (21%)$30.87$35.00
Aluminum signals pole, remove0646-1-60EACH3411 (32%)$167.50$332.00
Channelizing device- pedestrian LCD (longitudinal channelizing device)0102-74-8FD369 (25%)$0.06$0.07
Sign panel, remove, UP to 12 SF0700-3601EACH359 (26%)$79.30$65.00
Jva Engineering Contractor, Inc, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Jva Engineering Contractor, Inc, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 JUL 2026T6595District 6SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST9 of 12$4,946,946+13%
25 MAR 2026T6589District 6SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE2 of 6$12,038,627+6.0%
25 FEB 2026T6619District 6SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR...6 of 6$2,020,820+23%
28 JAN 2026T6618District 6SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE3 of 5$2,266,277+4.0%
29 OCT 2025T6621District 6SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN5 of 6$3,949,493+11%
24 SEP 2025T4741District 4SR 814 (ATLANTIC BLVD) AT LYONS RD1 of 5$1,013,087Low, 4.0% under the second
24 SEP 2025T6592District 6SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI5 of 7$4,038,868+11%
27 AUG 2025T4728District 4N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD6 of 6$3,618,112+24%
27 AUG 2025T6609District 6SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT6 of 7$1,937,647+13%
30 JUL 2025T6599District 6SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL5 of 6$6,557,500+12%
26 FEB 2025T4712District 4SR 7 (US 441) FROM MP 6.462 TO MP 8.1054 of 5$11,068,501+22%
26 FEB 2025T6602District 6SR 988 (SR 826 FRONTAGE RD / NW 77TH CT) FROM NW 154TH ST...7 of 7$3,765,050+10%
29 JAN 2025T6587District 6SR 972 (CORAL WAY / SW 3 AVE) FROM W OF SW 12 AVE TO BRICK..2 of 7$11,841,505+6.0%
24 APR 2024T6577District 6SR 934 (NW 74 ST / W-E 21 ST) FROM E OF W 4 AVE TO E 4 AVE4 of 4$5,335,641+25%
24 APR 2024T6580District 6SR 90 (SW 8 ST) AND SW 4 AVE FROM SW 4 AVE TO SW 2 AVE AND..6 of 6$8,307,627+40%
27 MAR 2024T4685District 4NW 16TH ST, NW 19TH ST AND NW 26TH ST FROM 49TH AVE TO SR 73 of 4$6,236,237+13%
06 DEC 2023T6564District 6SR 913 (SW/SE 26 RD) FROM SW 1 AVE TO RICKENBACKER CAUSEWAY1 of 5$2,427,793Low, 3.0% under the second
06 DEC 2023T6573District 6SR 976 (SW 40 ST/BIRD RD) FROM E OF SW 87 AVE TO W OF SR 8266 of 9$8,855,833+11%
15 NOV 2023T1866District 1SR 15 (US 98) AND SR 15/SR 700, From SW 23RD ST TO SW 14 ...5 of 5$8,566,288+117%
25 OCT 2023T6574District 6SR 916 (OPA-LOCKA BLVD) (NW 135 ST) (NW 136 ST) FROM W OF...7 of 9$4,195,752+26%
22 FEB 2023T6549District 6SR 994 (QUAIL ROOST DR)4 of 6$4,674,816+13%
27 JUL 2022T4626District 4NW 29TH ST4 of 7$2,595,648+12%
30 MAR 2022T4603District 4SW 64TH AVE5 of 8$2,512,243+12%
30 MAR 2022T4607District 4SW 148TH AVE5 of 7$2,308,104+17%
30 MAR 2022T6513District 6SR 5 (US 1)2 of 5$2,910,880+13%
Jva Engineering Contractor, Inc: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy