FDOT contract T6587 bid tabulation
SR 972 (CORAL WAY / SW 3 AVE) FROM W OF SW 12 AVE TO BRICK.. Let by Florida DOT on January 29, 2025, Miami-Dade, District 6. 7 bids received; low bid $11,128,266 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 206
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $11,128,266 | Low |
| 2 | Jva Engineering Contractor, Inc | $11,841,505 | +6.0% |
| 3 | Bacallao Construction & Engineering Development, LLC D/B/A B | $12,312,013 | +11% |
| 4 | Ohla USA Inc | $12,429,319 | +12% |
| 5 | Roadway Construction, LLC | $12,536,420 | +13% |
| 6 | Aum Construction Inc. | $12,974,705 | +17% |
| 7 | Florida Engineering & Development Corp | $12,993,051 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Jva Engineering Contractor, Inc | 3. Bacallao Construction & Engineering Development, LLC D/B/A B | 4. Ohla USA Inc | 5. Roadway Construction, LLC | 6. Aum Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $300,000 | $876,500 | $1,000,000 | $500,000 | $1,253,642 | $500,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $75,000 | $151,000 | $230,000 | $500,000 | $1,253,642 | $500,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $800,000 | $297,400 | $225,000 | $500,000 | $277,543 | $175,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $200,000 | $44,600 | $110,863 | $365,000 | $37,295 | $200,000 |
| 0025 | Traffic control officer (0102-14) | HR | 1,068 | $88.00 | $70.00 | $85.00 | $70.00 | $70.00 | $90.00 |
| 0030 | Work zone sign (0102-60) | ED | 81,520 | $0.22 | $0.30 | $0.23 | $0.20 | $0.19 | $0.35 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 492 | $53.90 | $61.30 | $0.01 | $0.01 | $49.00 | $80.00 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 163,890 | $0.12 | $0.19 | $0.11 | $0.10 | $0.09 | $0.20 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 238,000 | $0.03 | $0.13 | $0.04 | $0.03 | $0.03 | $0.10 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 2,770 | $5.50 | $12.50 | $6.00 | $5.20 | $5.00 | $10.00 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 5,244 | $9.90 | $18.70 | $10.00 | $9.40 | $9.00 | $12.00 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 4,620 | $17.85 | $14.00 | $6.30 | $6.40 | $16.93 | $12.00 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 4,620 | $1.28 | $14.00 | $6.30 | $6.40 | $1.21 | $12.00 |
| 0070 | Type III barricade (0102-115) | ED | 3,120 | $0.03 | $1.25 | $0.25 | $0.30 | $0.23 | $0.50 |
| 0075 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.09 | $11,000 | $5.85 | $6.00 | $21,000 | $13,500 | $20,000 |
| 0080 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 11 | $11.00 | $23.40 | $20.00 | $100.00 | $20.00 | $50.00 |
| 0085 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.15 | $11,000 | $31,500 | $30,000 | $20,000 | $13,776 | $20,000 |
| 0090 | Removable tape, yellow, 10'-30', 9', 6'-10', or 2'-4' skip (0102-913-32) | GM | 0.02 | $11,000 | $8,580.00 | $8,500.00 | $30,000 | $7,222.22 | $15,000 |
| 0095 | Sediment barrier (0104-10-3) | LF | 14,347 | $1.10 | $3.70 | $0.01 | $0.01 | $2.15 | $3.50 |
| 0100 | Inlet protection system (0104-18) | EACH | 131 | $132.00 | $179.00 | $50.00 | $230.00 | $110.00 | $250.00 |
| 0105 | Litter removal (0107-1) | ACRE | 178.46 | $0.01 | $230.00 | $0.01 | $55.00 | $0.01 | $150.00 |
| 0110 | Mowing (0107-2) | ACRE | 144.97 | $0.01 | $250.00 | $0.01 | $155.00 | $0.01 | $150.00 |
| 0115 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.10 | $47,900 | $10,000 | $60,000 | $1,000.00 | $45,000 |
| 0120 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.10 | $4,850.00 | $10,000 | $50,000 | $750.00 | $45,000 |
| 0125 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.10 | $8,190.00 | $8,000.00 | $5,000.00 | $7,000.00 | $15,000 |
| 0130 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $30,256 | $93,600 | $220,000 | $265,000 | $228,884 | $40,000 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $20,187 | $9,360.00 | $10,000 | $265,000 | $228,884 | $25,000 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $24,750 | $10,530 | $12,500 | $265,000 | $228,884 | $32,000 |
| 0145 | Removal of existing concrete (0110-4-10) | SY | 6,013 | $27.50 | $21.00 | $30.00 | $33.00 | $18.24 | $35.00 |
| 0150 | Tree protection barrier (0110-21) | LF | 11,302 | $9.90 | $4.30 | $0.01 | $8.00 | $6.00 | $15.00 |
| 0155 | Tree root and branch pruning (0110-22) | EACH | 20 | $1,320.00 | $5,265.00 | $1,000.00 | $4,275.00 | $1,000.00 | $6,000.00 |
| 0160 | Tree removal (0110-23) | EACH | 7 | $3,300.00 | $3,510.00 | $1,500.00 | $900.00 | $1,500.00 | $3,000.00 |
| 0165 | Borrow excavation, truck measure (0120-2-2) | CY | 97.80 | $27.50 | $45.00 | $50.00 | $68.00 | $89.83 | $50.00 |
| 0170 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $20,350 | $29,460 | $35,000 | $30,000 | $22,681 | $25,000 |
| 0175 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $16,500 | $9,580.00 | $20,000 | $10,500 | $5,668.40 | $21,000 |
| 0180 | Type B stabilization (0160-4) | SY | 1,358 | $7.43 | $28.00 | $0.01 | $1.00 | $28.87 | $20.00 |
| 0185 | Reworking limerock base, 4" (0210-1-8) | SY | 972 | $1.10 | $45.60 | $15.00 | $4.25 | $19.78 | $50.00 |
| 0190 | Reworking limerock base, 3" (0210-1-9) | SY | 127 | $1.10 | $24.90 | $16.00 | $33.00 | $17.29 | $70.00 |
| 0195 | Optional base, base group 06 (0285-706) | SY | 574 | $46.20 | $45.70 | $60.00 | $80.00 | $50.85 | $70.00 |
| 0200 | Optional base, base group 09 (0285-709) | SY | 784 | $49.50 | $55.80 | $110.00 | $95.00 | $40.44 | $80.00 |
| 0205 | Optional base, base group 11 (0285-711) | SY | 287 | $52.80 | $85.70 | $200.00 | $90.00 | $70.30 | $85.00 |
| 0210 | Turnout base- optional materials (0286-1) | SY | 294 | $57.20 | $48.00 | $34.00 | $50.00 | $56.53 | $75.00 |
| 0215 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 16,493 | $3.33 | $5.81 | $7.00 | $5.50 | $3.78 | $5.00 |
| 0220 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 67,247 | $4.28 | $7.00 | $7.00 | $5.20 | $4.87 | $6.00 |
| 0225 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 2,427 | $8.54 | $7.00 | $7.00 | $24.20 | $9.70 | $5.50 |
| 0230 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 4,815.70 | $165.09 | $196.00 | $210.00 | $187.00 | $180.00 | $215.00 |
| 0235 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 6,287.30 | $194.39 | $234.00 | $250.00 | $200.00 | $216.00 | $255.00 |
| 0240 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 2 | $13,587 | $8,470.00 | $8,500.00 | $12,250 | $7,946.88 | $18,500 |
| 0245 | Inlets, curb, type 9, partial (0425-1205) | EACH | 1 | $7,975.00 | $7,070.00 | $4,800.00 | $6,125.00 | $5,386.29 | $11,000 |
| 0250 | Inlets, ditch bottom, type F, J bot, <10' (0425-1563) | EACH | 4 | $17,859 | $10,130 | $10,500 | $12,250 | $9,621.56 | $24,500 |
| 0255 | Inlets, ditch bottom, type F, partial (0425-1565) | EACH | 1 | $6,358.00 | $7,190.00 | $4,000.00 | $6,125.00 | $5,908.34 | $9,000.00 |
| 0260 | Manholes, P-7, <10' (0425-2-41) | EACH | 4 | $10,780 | $8,440.00 | $10,000 | $12,500 | $7,631.38 | $15,000 |
| 0265 | Inlets, adjust (0425-4) | EACH | 28 | $572.00 | $2,340.00 | $750.00 | $2,050.00 | $909.60 | $1,000.00 |
| 0270 | Manhole, adjust (0425-5) | EACH | 62 | $880.00 | $1,050.00 | $750.00 | $815.00 | $787.82 | $1,500.00 |
| 0275 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 4 | $880.00 | $1,010.00 | $740.00 | $300.00 | $573.48 | $1,200.00 |
| 0280 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 4 | $880.00 | $870.00 | $800.00 | $300.00 | $581.87 | $1,200.00 |
| 0285 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 49 | $550.00 | $323.00 | $350.00 | $300.00 | $449.90 | $850.00 |
| 0290 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 10 | $880.00 | $450.00 | $225.00 | $300.00 | $454.17 | $1,300.00 |
| 0295 | French drain, 24" (0443-70-4) | LF | 265 | $412.50 | $249.00 | $340.00 | $400.00 | $301.82 | $600.00 |
| 0300 | Concrete curb & gutter, type E (0520-1-7) | LF | 45 | $63.80 | $117.00 | $46.00 | $54.00 | $54.46 | $85.00 |
| 0305 | Concrete curb & gutter, type F (0520-1-10) | LF | 4,547 | $74.80 | $53.00 | $45.00 | $50.00 | $39.75 | $95.00 |
| 0310 | Concrete curb, type D (0520-2-4) | LF | 1,286 | $42.90 | $49.00 | $42.00 | $38.00 | $36.19 | $60.00 |
| 0315 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,624 | $90.20 | $71.00 | $80.00 | $82.00 | $64.61 | $110.00 |
| 0320 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 4,756 | $121.00 | $84.50 | $110.00 | $94.00 | $92.92 | $140.00 |
| 0325 | Pavers, architectural, (0526-1-2) | SY | 8 | $260.70 | $340.00 | $425.00 | $400.00 | $350.00 | $500.00 |
| 0330 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 65 | $99.00 | $141.00 | $260.00 | $300.00 | $85.00 | $150.00 |
| 0335 | Detectable warnings (0527-2) | SF | 2,073 | $35.20 | $41.00 | $34.00 | $38.00 | $33.59 | $45.00 |
| 0340 | Guardrail removal (0536-73) | LF | 17 | $11.00 | $100.00 | $6.00 | $20.00 | $100.00 | $100.00 |
| 0345 | Performance turf, sod (0570-1-2) | SY | 3,033 | $10.78 | $13.90 | $3.50 | $17.00 | $16.99 | $20.00 |
| 0350 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 4,069 | $16.87 | $14.70 | $8.00 | $14.00 | $20.77 | $30.00 |
| 0355 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 173 | $47.88 | $76.00 | $42.25 | $36.00 | $45.42 | $40.00 |
| 0360 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,882.79 | $2,340.00 | $1,650.00 | $1,710.00 | $1,785.88 | $1,800.00 |
| 0365 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $14,000 | $14,000 | $14,000 | $14,000 | $14,000 | $14,000 |
| 0370 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0375 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 9 | $2,087.39 | $2,925.00 | $2,050.00 | $2,065.00 | $1,979.85 | $2,000.00 |
| 0380 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 9 | $2,322.41 | $2,340.00 | $2,750.00 | $2,650.00 | $2,202.86 | $1,800.00 |
| 0385 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 2 | $9,555.04 | $7,605.00 | $11,000 | $10,225 | $9,063.21 | $10,000 |
| 0390 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 3.87 | $2,750.00 | $3,089.00 | $3,100.00 | $1,700.00 | $1,350.35 | $2,000.00 |
| 0395 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 1.26 | $2,915.00 | $3,410.00 | $3,400.00 | $2,250.00 | $1,494.02 | $2,500.00 |
| 0400 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 7,126 | $1.10 | $1.00 | $0.90 | $1.50 | $1.00 | $1.50 |
| 0405 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,370 | $1.65 | $1.40 | $1.40 | $1.60 | $2.00 | $3.00 |
| 0410 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,586 | $2.20 | $1.90 | $1.75 | $1.70 | $3.00 | $4.50 |
| 0415 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 3.42 | $2,750.00 | $772.00 | $775.00 | $500.00 | $799.77 | $1,200.00 |
| 0420 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.26 | $2,750.00 | $772.00 | $775.00 | $675.00 | $800.00 | $1,200.00 |
| 0425 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 95 | $55.00 | $70.00 | $70.00 | $33.00 | $85.00 | $130.00 |
| 0430 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 96 | $33.00 | $35.00 | $35.00 | $33.00 | $40.00 | $60.00 |
| 0435 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 377 | $1.10 | $4.70 | $4.50 | $5.00 | $15.00 | $22.50 |
| 0440 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 2.46 | $2,750.00 | $2,570.00 | $2,500.00 | $1,700.00 | $1,345.61 | $2,000.00 |
| 0445 | Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202) | GM | 1.73 | $2,915.00 | $1,280.00 | $1,550.00 | $2,250.00 | $1,500.00 | $2,500.00 |
| 0450 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 634 | $1.65 | $1.40 | $1.25 | $1.60 | $2.00 | $3.00 |
| 0455 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.29 | $2,750.00 | $765.00 | $800.00 | $670.00 | $791.81 | $4,000.00 |
| 0460 | Painted pavement markings, standard, blue, solid for parking lot- accessible markings, 6" (0710-11421) | LF | 104 | $2.20 | $1.00 | $1.00 | $3.00 | $5.00 | $10.00 |
| 0465 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $98,324 | $98,324 | $98,324 | $98,324 | $98,324 | $98,324 |
| 0470 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $2,852.00 | $2,852.00 | $2,852.00 | $2,852.00 | $2,852.00 | $2,852.00 |
| 0475 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $16,572 | $16,572 | $16,572 | $16,572 | $16,572 | $16,572 |
| 0480 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 30 | $49.71 | $117.00 | $41.00 | $40.00 | $47.15 | $40.00 |
| 0485 | Loop detector inductive, F&I, type 2 (0660-1102) | EACH | 2 | $545.35 | $655.00 | $1,000.00 | $860.00 | $517.28 | $200.00 |
| 0490 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 215 | $544.50 | $579.00 | $450.00 | $425.00 | $500.00 | $800.00 |
| 0495 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 11 | $1,705.00 | $2,750.00 | $350.00 | $1,375.00 | $1,800.00 | $1,500.00 |
| 0500 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 33 | $1,815.00 | $2,980.00 | $1,725.00 | $1,550.00 | $1,900.00 | $1,900.00 |
| 0505 | Single column ground sign assembly, F&I ground mount, SF sheeting area for back to back signs (0700-1114) | EACH | 22 | $2,145.00 | $2,980.00 | $2,900.00 | $1,850.00 | $1,850.00 | $2,500.00 |
| 0510 | Single column ground sign assembly, install (0700-1400) | EACH | 3 | $440.00 | $1,164.00 | $450.00 | $135.00 | $300.00 | $950.00 |
| 0515 | Single column ground sign assembly, relocate (0700-1500) | EACH | 4 | $385.00 | $497.00 | $350.00 | $225.00 | $300.00 | $1,500.00 |
| 0520 | Single column ground sign assembly, remove (0700-1600) | EACH | 176 | $44.00 | $11.70 | $20.00 | $25.00 | $150.00 | $150.00 |
| 0525 | Single column ground sign assembly, F&I cantilever mount, less than 12 SF (0700-1911) | EACH | 8 | $715.00 | $1,860.00 | $450.00 | $500.00 | $525.00 | $2,250.00 |
| 0530 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 7 | $715.00 | $216.00 | $275.00 | $200.00 | $250.00 | $600.00 |
| 0535 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 2 | $935.00 | $240.00 | $550.00 | $350.00 | $350.00 | $825.00 |
| 0540 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 4 | $6,297.45 | $5,675.00 | $3,500.00 | $3,000.00 | $2,905.90 | $7,700.00 |
| 0545 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 1 | $8,214.33 | $11,000 | $5,000.00 | $4,150.00 | $4,105.30 | $11,000 |
| 0550 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 95 | $440.00 | $438.00 | $650.00 | $150.00 | $100.00 | $400.00 |
| 0555 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 1 | $1,045.00 | $678.00 | $850.00 | $380.00 | $150.00 | $1,050.00 |
| 0560 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 33 | $71.50 | $82.00 | $150.00 | $185.00 | $100.00 | $150.00 |
| 0565 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 3 | $82.50 | $117.00 | $150.00 | $175.00 | $150.00 | $400.00 |
| 0570 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 2 | $825.00 | $702.00 | $900.00 | $525.00 | $748.30 | $900.00 |
| 0575 | Overhead static sign furnish & install, cantilever, 40 FT (0700-4113) | EACH | 1 | $121,380 | $162,000 | $90,000 | $88,000 | $86,199 | $130,000 |
| 0580 | Overhead static sign furnish & install, cantilever, 50 FT (0700-4114) | EACH | 1 | $135,055 | $263,250 | $100,000 | $100,000 | $99,294 | $150,000 |
| 0585 | Overhead static sign shallow foundation removal, span (0700-4621) | EACH | 2 | $19,229 | $17,550 | $7,250.00 | $6,000.00 | $5,986.40 | $25,000 |
| 0590 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 117 | $115.50 | $105.00 | $125.00 | $95.00 | $110.00 | $135.00 |
| 0595 | Object marker, type 3 (0705-10-3) | EACH | 1 | $247.50 | $462.00 | $100.00 | $225.00 | $300.00 | $225.00 |
| 0600 | Object marker, type 4 (0705-10-4) | EACH | 2 | $247.50 | $462.00 | $100.00 | $250.00 | $300.00 | $375.00 |
| 0605 | Delineator, flexible tubular (0705-11-1) | EACH | 40 | $110.00 | $105.00 | $100.00 | $135.00 | $100.00 | $200.00 |
| 0610 | Raised pavement marker, type B (0706-1-3) | EACH | 4,340 | $3.85 | $5.80 | $5.00 | $3.75 | $5.00 | $7.50 |
| 0615 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 145 | $5.50 | $2.30 | $2.25 | $4.00 | $5.00 | $10.00 |
| 0620 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 140 | $5.50 | $2.30 | $2.25 | $4.00 | $6.00 | $12.00 |
| 0625 | Painted pavement markings, surface (0710-90) | LS | 1 | $49,143 | $34,380 | $45,000 | $33,750 | $30,000 | $40,000 |
| 0630 | Painted pavement markings, surface (0710-90) | LS | 1 | $14,179 | $23,400 | $10,000 | $8,425.00 | $7,000.00 | $10,000 |
| 0635 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,254 | $2.20 | $2.80 | $2.75 | $3.20 | $4.00 | $6.00 |
| 0640 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,370 | $3.30 | $4.20 | $4.25 | $4.80 | $5.00 | $7.50 |
| 0645 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,526 | $4.40 | $5.60 | $5.50 | $6.50 | $6.00 | $9.00 |
| 0650 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.26 | $4,647.50 | $1,850.00 | $1,750.00 | $2,500.00 | $3,500.00 | $5,000.00 |
| 0655 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 51 | $132.00 | $140.00 | $140.00 | $125.00 | $225.00 | $3.50 |
| 0660 | Thermoplastic, standard, arrow (0711-11170) | EACH | 96 | $66.00 | $93.00 | $95.00 | $69.00 | $85.00 | $130.00 |
| 0665 | Thermoplastic, standard, yield line (0711-11180) | LF | 377 | $1.10 | $23.00 | $23.00 | $8.00 | $15.00 | $23.00 |
| 0670 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 634 | $3.30 | $4.20 | $4.25 | $4.50 | $5.00 | $7.50 |
| 0675 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.29 | $4,647.50 | $7,330.00 | $7,500.00 | $2,475.00 | $3,464.16 | $5,000.00 |
| 0680 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 104 | $4.40 | $0.70 | $0.70 | $4.00 | $10.00 | $15.00 |
| 0685 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 3,827 | $13.20 | $12.80 | $13.00 | $9.00 | $8.00 | $15.00 |
| 0690 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,614 | $22.00 | $22.20 | $22.00 | $18.00 | $16.00 | $25.00 |
| 0695 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 86 | $385.00 | $304.00 | $310.00 | $355.00 | $285.00 | $425.00 |
| 0700 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 38 | $220.00 | $175.00 | $175.00 | $115.00 | $100.00 | $150.00 |
| 0705 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 2 | $3,300.00 | $3,530.00 | $3,500.00 | $3,025.00 | $2,500.00 | $4,000.00 |
| 0710 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 3.79 | $5,808.00 | $7,410.00 | $7,500.00 | $5,225.00 | $5,500.00 | $8,500.00 |
| 0715 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 1.34 | $6,930.00 | $7,716.24 | $7,750.00 | $7,000.00 | $6,040.27 | $9,000.00 |
| 0720 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.36 | $5,808.00 | $1,850.00 | $1,800.00 | $1,300.00 | $3,498.96 | $5,000.00 |
| 0725 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.05 | $5,808.00 | $3,432.00 | $4,000.00 | $2,400.00 | $6,481.48 | $20,000 |
| 0730 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 2.46 | $5,808.00 | $7,420.00 | $7,500.00 | $5,225.00 | $5,504.48 | $8,000.00 |
| 0735 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 1.73 | $6,930.00 | $7,720.00 | $7,900.00 | $7,000.00 | $6,000.00 | $9,000.00 |
| 0740 | Green-colored pavement markings, bike lane (0714-10) | SF | 814 | $11.00 | $11.70 | $10.00 | $9.00 | $10.00 | $15.00 |
| 0745 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,875 | $44.50 | $41.00 | $85.00 | $84.00 | $42.50 | $40.00 |
| 0750 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 130 | $1,882.79 | $1,989.00 | $1,700.00 | $1,715.00 | $1,785.88 | $1,800.00 |
| 0755 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 5 | $5,192.25 | $7,254.00 | $7,250.00 | $7,135.00 | $4,924.99 | $7,500.00 |
| 0760 | Electrical power service, remove underground (0639-1620) | AS | 4 | $1,020.15 | $995.00 | $900.00 | $860.00 | $967.64 | $750.00 |
| 0765 | Electrical service wire, & install (0639-2-1) | LF | 440 | $12.03 | $17.50 | $18.00 | $17.50 | $11.42 | $10.00 |
| 0770 | Electrical service wire, (0639-2-6) | LF | 235 | $0.64 | $1.20 | $0.25 | $0.20 | $0.06 | $1.00 |
| 0775 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 5 | $4,860.35 | $4,563.00 | $4,000.00 | $4,135.00 | $4,610.28 | $1,750.00 |
| 0780 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 1 | $765.12 | $655.00 | $600.00 | $575.00 | $725.73 | $500.00 |
| 0785 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 5 | $4,445.74 | $3,393.00 | $3,500.00 | $3,500.00 | $4,216.90 | $2,500.00 |
| 0790 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 5 | $765.12 | $1,053.00 | $900.00 | $860.00 | $725.73 | $750.00 |
| 0795 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 7,894 | $4.02 | $3.50 | $4.50 | $4.20 | $3.81 | $3.25 |
| 0800 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 1,580 | $6.09 | $6.60 | $5.00 | $5.00 | $5.78 | $5.00 |
| 0805 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 3,930 | $0.51 | $0.53 | $0.25 | $0.20 | $0.48 | $0.50 |
| 0810 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 5 | $19,699 | $26,325 | $18,000 | $18,000 | $18,685 | $20,000 |
| 0815 | Load center, remove, voltage (0715-7-41) | EACH | 5 | $1,530.23 | $1,050.00 | $1,100.00 | $1,150.00 | $1,451.47 | $750.00 |
| 0820 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pendant/teardrop (0715-11216) | EACH | 59 | $3,267.98 | $2,726.00 | $3,100.00 | $3,100.00 | $3,099.77 | $2,300.00 |
| 0825 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 74 | $1,458.77 | $1,040.00 | $1,250.00 | $1,200.00 | $1,383.67 | $750.00 |
| 0830 | Light pole complete- special design, F&I, single arm shoulder mount, aluminum, 20' (0715-511120) | EACH | 7 | $21,319 | $19,830 | $16,000 | $15,600 | $20,221 | $18,000 |
| 0835 | Light pole complete- special design, remove (0715-550000) | EACH | 6 | $1,275.20 | $700.00 | $900.00 | $860.00 | $1,209.56 | $1,500.00 |
| 0840 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 7,854 | $44.04 | $46.80 | $100.00 | $96.00 | $41.77 | $40.00 |
| 0845 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 8 | $10,907 | $10,530 | $20,500 | $17,125 | $10,346 | $15,000 |
| 0850 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $2,040.31 | $995.00 | $1,100.00 | $1,800.00 | $1,935.29 | $750.00 |
| 0855 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 247 | $1,808.14 | $1,989.00 | $2,000.00 | $1,900.00 | $1,715.07 | $1,800.00 |
| 0860 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 8 | $3,066.82 | $3,740.00 | $3,000.00 | $2,635.00 | $2,908.96 | $3,500.00 |
| 0865 | Pull & splice box, install (0635-2-30) | EACH | 16 | $1,351.93 | $1,400.00 | $900.00 | $870.00 | $1,282.35 | $1,500.00 |
| 0870 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 16 | $7,265.90 | $6,550.00 | $5,500.00 | $4,900.00 | $6,891.89 | $7,500.00 |
| 0875 | Electrical service wire, & install (0639-2-1) | LF | 3,263 | $12.03 | $11.70 | $15.00 | $12.70 | $11.42 | $10.00 |
| 0880 | Electrical service wire, (0639-2-6) | LF | 160 | $0.51 | $0.59 | $0.25 | $0.20 | $0.48 | $1.00 |
| 0885 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 4 | $765.12 | $995.00 | $900.00 | $760.00 | $725.73 | $500.00 |
| 0890 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 16 | $4,445.74 | $655.00 | $3,250.00 | $3,125.00 | $4,216.90 | $2,500.00 |
| 0895 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 5 | $765.12 | $3,800.00 | $900.00 | $760.00 | $725.73 | $750.00 |
| 0900 | Aluminum signals pole, (0646-1-11) | EACH | 61 | $3,006.66 | $175.00 | $3,000.00 | $2,600.00 | $2,851.90 | $2,000.00 |
| 0905 | Aluminum signals pole, remove (0646-1-60) | EACH | 22 | $765.12 | $175.00 | $900.00 | $760.00 | $725.73 | $500.00 |
| 0910 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 51 | $1,113.49 | $1,111.00 | $550.00 | $500.00 | $1,056.17 | $600.00 |
| 0915 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 50 | $1,173.65 | $1,400.00 | $900.00 | $825.00 | $1,113.23 | $1,800.00 |
| 0920 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 11 | $2,175.20 | $2,165.00 | $2,000.00 | $1,735.00 | $2,063.23 | $2,500.00 |
| 0925 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 24 | $255.04 | $58.50 | $150.00 | $125.00 | $241.91 | $250.00 |
| 0930 | Midblock crosswalk: rectangular rapid flashing beacon, furnish & install- AC, complete sign assembly- back back (0654-2-12) | AS | 11 | $16,235 | $11,670 | $15,000 | $13,325 | $15,400 | $16,000 |
| 0935 | Midblock crosswalk: rectangular rapid flashing beacon, remove complete sign assembly (0654-2-60) | AS | 10 | $1,020.15 | $1,400.00 | $900.00 | $760.00 | $967.64 | $1,500.00 |
| 0940 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 2 | $456.71 | $760.00 | $400.00 | $360.00 | $433.20 | $250.00 |
| 0945 | Loop assembly, F&I, type F (0660-2106) | AS | 6 | $2,486.92 | $2,925.00 | $2,800.00 | $2,350.00 | $2,358.91 | $1,800.00 |
| 0950 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 6 | $8,958.96 | $9,595.00 | $7,900.00 | $6,500.00 | $8,497.82 | $10,000 |
| 0955 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 8 | $5,504.47 | $3,800.00 | $3,500.00 | $3,000.00 | $5,221.14 | $4,000.00 |
| 0960 | Vehicle detection system- adjust/modify above ground equipment (0660-4-52) | EACH | 4 | $1,434.88 | $1,400.00 | $1,225.00 | $1,020.00 | $1,361.03 | $2,000.00 |
| 0965 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 75 | $462.41 | $655.00 | $300.00 | $265.00 | $438.60 | $450.00 |
| 0970 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 10 | $2,264.34 | $4,500.00 | $2,500.00 | $2,115.00 | $2,147.79 | $1,500.00 |
| 0975 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 16 | $127.52 | $53.00 | $150.00 | $125.00 | $120.96 | $50.00 |
| 0980 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 7 | $53,868 | $54,990 | $75,000 | $51,000 | $51,095 | $50,000 |
| 0985 | Traffic controller assembly, remove controller with (0670-5600) | AS | 7 | $2,040.31 | $936.00 | $1,200.00 | $1,000.00 | $1,935.29 | $1,500.00 |
| 0990 | Network device, cellular (0684-90102) | EACH | 7 | $3,187.48 | $2,925.00 | $2,000.00 | $2,000.00 | $3,023.41 | $2,500.00 |
| 0995 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 4 | $1,550.89 | $216.00 | $800.00 | $680.00 | $1,470.22 | $950.00 |
| 1000 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 5 | $1,887.99 | $1,123.00 | $1,325.00 | $1,135.00 | $1,790.80 | $1,500.00 |
| 1005 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 5 | $255.04 | $122.00 | $200.00 | $190.00 | $241.91 | $250.00 |
| 1010 | Internally illuminated sign, furnish & install ground UP to 12 SF (0700-5-11) | EACH | 3 | $5,663.69 | $4,095.00 | $4,000.00 | $3,815.00 | $5,372.17 | $4,000.00 |
| 1015 | Internally illuminated sign, remove (0700-5-60) | EACH | 3 | $1,020.15 | $526.00 | $300.00 | $250.00 | $967.64 | $750.00 |
| 1020 | Enhanced highway sign AC powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-141131) | EACH | 4 | $18,170 | $14,040 | $19,000 | $16,400 | $17,235 | $16,000 |
| 1025 | Enhanced highway sign AC powered, F&I ground mount, W/eds, 12-20 SF of static sign panels (0700-141132) | EACH | 2 | $18,675 | $20,475 | $19,000 | $16,400 | $17,714 | $17,000 |
| 1030 | Enhanced highway sign AC powered, remove - ground mount (0700-141902) | EACH | 2 | $1,020.15 | $995.00 | $900.00 | $760.00 | $967.64 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.