General Asphalt Company, LLC: FDOT bid record
General Asphalt Company, LLC submitted 186 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 47 of them (25%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $298,400,413
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 18 | 4 | 22% |
| 2019 | 19 | 3 | 16% |
| 2020 | 17 | 4 | 24% |
| 2021 | 19 | 4 | 21% |
| 2022 | 28 | 8 | 29% |
| 2023 | 25 | 5 | 20% |
| 2024 | 22 | 9 | 41% |
| 2025 | 26 | 8 | 31% |
| 2026 | 12 | 2 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 95 | 23 | 24% |
| District 6 | 84 | 23 | 27% |
| District 1 | 7 | 1 | 14% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Weekley Asphalt Paving, Inc. | 114 | 49 of 114 |
| Ranger Construction Industries, Inc. | 93 | 17 of 93 |
| Ohla USA Inc | 74 | 25 of 74 |
| Roadway Construction, LLC | 69 | 26 of 69 |
| The Stout Group LLC | 64 | 15 of 64 |
| Horizon Contractors, Inc. | 60 | 15 of 60 |
| Florida Engineering & Development Corp | 56 | 26 of 56 |
| Halley Engineering Contractors, Inc. | 54 | 21 of 54 |
| Asphalt Group, Inc. | 51 | 11 of 51 |
| Jva Engineering Contractor, Inc | 38 | 12 of 38 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1941 | District 1 | SR 29 FROM N OF OIL WELL RD (CR 858) TO N OF BRIDGE #030304 | 2 of 2 | $4,262,013 | +11% |
| 28 OCT 2026 | T4765 | District 4 | SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE | 1 of 6 | $7,579,227 | Low, 3.0% under the second |
| 30 SEP 2026 | T1944 | District 1 | HOMESTEAD AVE OVER MARSH CREEK, BRIDGE NO 074026 | 5 of 8 | $1,792,844 | +72% |
| 30 SEP 2026 | T6593 | District 6 | SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY | 3 of 5 | $3,545,236 | +19% |
| 30 SEP 2026 | T6613 | District 6 | SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W | 9 of 9 | $2,630,269 | +56% |
| 29 JUL 2026 | T1939 | District 1 | SR 25 (US 27) FROM S OF WAYMAN RD TO N OF FISH EATING CREEK | 4 of 4 | $18,973,667 | +4.0% |
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 2 of 12 | $4,413,442 | +1.0% |
| 10 JUN 2026 | T4766 | District 4 | SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1) | 7 of 8 | $1,691,787 | +34% |
| 25 MAR 2026 | T4740 | District 4 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | 1 of 9 | $6,362,382 | Low, 0.0% under the second |
| 25 MAR 2026 | T6591 | District 6 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | 2 of 7 | $6,364,891 | +1.0% |
| 25 FEB 2026 | T6619 | District 6 | SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR... | 4 of 6 | $1,950,487 | +19% |
| 28 JAN 2026 | T6618 | District 6 | SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE | 4 of 5 | $2,755,758 | +26% |
| 03 DEC 2025 | T6615 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... | 1 of 8 | $6,267,634 | Low, 0.0% under the second |
| 29 OCT 2025 | T4727 | District 4 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | 9 of 13 | $6,566,546 | +34% |
| 24 SEP 2025 | T4741 | District 4 | SR 814 (ATLANTIC BLVD) AT LYONS RD | 5 of 5 | $1,242,838 | +23% |
| 24 SEP 2025 | T6592 | District 6 | SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI | 7 of 7 | $4,614,885 | +27% |
| 27 AUG 2025 | T4688 | District 4 | SR 817 (UNIVERSITY DR) FROM N OF SR 824 (PEMBROKE RD) TO N.. | 5 of 7 | $52,839,615 | +23% |
| 27 AUG 2025 | T4702 | District 4 | SR 7 (US 441) AT LAKE WORTH RD | 3 of 8 | $3,453,411 | +1.0% |
| 27 AUG 2025 | T4715 | District 4 | SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 84 | 2 of 9 | $7,472,654 | +9.0% |
| 27 AUG 2025 | T4728 | District 4 | N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD | 4 of 6 | $3,492,378 | +19% |
| 30 JUL 2025 | T4648 | District 4 | SR 84 AT WESTON ROAD | 3 of 5 | $3,640,990 | +14% |
| 30 JUL 2025 | T4674 | District 4 | SR 80 (SOUTHERN BLVD RAMPS) AT SR 7 (US 441) | 1 of 4 | $8,259,855 | Low, 14% under the second |
| 30 JUL 2025 | T4716 | District 4 | SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD | 1 of 8 | $5,935,381 | Low, 1.0% under the second |
| 30 JUL 2025 | T4726 | District 4 | UTOPIA DR FROM RIVIERA BLVD TO SR 824 (PEMBROKE RD) | 2 of 6 | $1,481,919 | +6.0% |
| 28 MAY 2025 | T4719 | District 4 | SR 15 (E MAIN ST) FROM ANNONA ST TO S OF SR 700 (CONNERS HWY | 1 of 6 | $3,433,755 | Low, 18% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.