Weekley Asphalt Paving, Inc.: FDOT bid record

Weekley Asphalt Paving, Inc. submitted 191 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 44 of them (23%). When it was not low, its total sat a median +12% above the low bid.

Owner
Florida DOT
Low bid volume
$129,711,217
Latest bid
28 OCT 2026
Data through
28 OCT 2026
191Bids
44Low bids
23Win rate, percent
+12%Median gap to the low bid when not low, 147 bids

By year

YearBidsLow bidsWin rate
201824625%
2019331030%
202023626%
202124313%
202225520%
20231218%
202419526%
202520420%
202611436%
Weekley Asphalt Paving, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 41062625%
District 6801620%
District 14250%
District 3100%
Weekley Asphalt Paving, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Work zone sign0102-60ED184126 (68%)$0.22$0.25
Conduit, furnish & install, directional bore0630-2-12LF317123 (39%)$28.00$30.82
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH365119 (33%)$834.00$1,150.00
Portable changeable message sign, temporary0102-99ED186114 (61%)$10.00$12.00
Arrow board / advance warning arrow panel0102-76ED172113 (66%)$5.00$5.90
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED18793 (50%)$0.12$0.13
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF16091 (57%)$3.55$6.09
Thermoplastic, standard, solid, 12" for crosswalk and roundabout0711-11123LF14881 (55%)$1.77$3.25
Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron0711-11224LF13179 (60%)$2.70$4.50
Thermoplastic, standard, solid, 18" for diagonals and chevrons0711-11124LF12476 (61%)$2.70$4.58
Aluminum signals pole,0646-1-11EACH13174 (56%)$1,353.91$2,109.50
Litter removal0107-1ACRE12574 (59%)$45.00$52.98
Weekley Asphalt Paving, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Weekley Asphalt Paving, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T4765District 4SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE3 of 6$8,158,412+8.0%
30 SEP 2026T6613District 6SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W1 of 9$1,690,338Low, 8.0% under the second
29 JUL 2026T6595District 6SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST4 of 12$4,512,561+3.0%
10 JUN 2026T4766District 4SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1)4 of 8$1,433,226+14%
29 APR 2026T4723District 4SR 5 (US 1) FROM PALMETTO PARK RD TO SR 850 (NORTHLAKE BLVD)1 of 4$2,274,905Low, 10% under the second
25 MAR 2026T4740District 4SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD)2 of 9$6,393,2370.0%
25 MAR 2026T6591District 6SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM...1 of 7$6,317,176Low, 1.0% under the second
25 FEB 2026T4751District 4SR 704 (OKEECHOBEE BLVD) FROM E OF SR 809 (MILITARY TR) TO..2 of 4$2,356,8390.0%
25 FEB 2026T6619District 6SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR...5 of 6$2,001,900+22%
28 JAN 2026T4749District 4SR 862 (i-595) FROM SB I-95 OFF RAMP TO WB I-5953 of 3$2,209,288+14%
28 JAN 2026T6618District 6SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE1 of 5$2,189,486Low, 2.0% under the second
03 DEC 2025T4717District 4SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1)4 of 8$2,486,564+10%
03 DEC 2025T6614District 6SR 817 (NW 27 AVE) FRM SESAME ST TO DUNAD AVE3 of 6$893,767+3.0%
03 DEC 2025T6615District 6SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61...2 of 8$6,286,7210.0%
03 DEC 2025T6620District 6SR A1A (COLLINS AVE) FROM S OF SR 826 TO N OF 178 ST2 of 5$1,468,745+2.0%
29 OCT 2025T4743District 4SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL5 of 10$2,871,379+15%
29 OCT 2025T6621District 6SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN6 of 6$4,068,413+14%
24 SEP 2025T4741District 4SR 814 (ATLANTIC BLVD) AT LYONS RD2 of 5$1,053,257+4.0%
27 AUG 2025T4715District 4SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 845 of 9$7,635,667+11%
27 AUG 2025T4728District 4N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD2 of 6$3,136,623+7.0%
30 JUL 2025T4648District 4SR 84 AT WESTON ROAD1 of 5$3,189,222Low, 3.0% under the second
30 JUL 2025T4726District 4UTOPIA DR FROM RIVIERA BLVD TO SR 824 (PEMBROKE RD)6 of 6$1,870,312+34%
30 JUL 2025T6599District 6SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL3 of 6$6,059,424+4.0%
28 MAY 2025T4707District 4SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME..1 of 6$3,150,898Low, 8.0% under the second
30 APR 2025T6606District 6SR 953 (LE JEUNE RD / SW 42 AVE) AND SR 976 (BIRD RD / SW...4 of 8$3,819,229+3.0%
Weekley Asphalt Paving, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way