FDOT contract T4743 bid tabulation
SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL. Let by Florida DOT on October 29, 2025, Palm Beach, District 4. 10 bids received; low bid $2,487,603 by Sice Inc.
- Owner
- Florida DOT
- Letting
- 29 OCT 2025
- Pay items
- 40
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sice Inc | $2,487,603 | Low |
| 2 | American Lighting and Signalization, LLC. | $2,575,000 | +4.0% |
| 3 | Aum Construction Inc. | $2,769,699 | +11% |
| 4 | Arc Electric Inc | $2,777,778 | +12% |
| 5 | Weekley Asphalt Paving, Inc. | $2,871,379 | +15% |
| 6 | Horsepower Electric, Inc. | $2,881,116 | +16% |
| 7 | Signal Technology and Installation Corp. | $2,998,906 | +21% |
| 8 | Florida Engineering & Development Corp | $3,025,662 | +22% |
| 9 | Traffic Management Solutions, LLC | $3,333,481 | +34% |
| 10 | Ferreira Construction Co., Inc. | $3,654,228 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sice Inc | 2. American Lighting and Signalization, LLC. | 3. Aum Construction Inc. | 4. Arc Electric Inc | 5. Weekley Asphalt Paving, Inc. | 6. Horsepower Electric, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $25,103 | $94,856 | $100,000 | $84,900 | $15,000 | $50,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $223,610 | $95,000 | $200,000 | $84,900 | $150,000 | $95,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $48,635 | $51,679 | $50,000 | $50,000 | $23,000 | $21,717 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $146,422 | $51,679 | $90,000 | $50,000 | $220,000 | $75,000 |
| 0025 | Traffic control officer (0102-14) | HR | 102 | $102.39 | $206.00 | $80.00 | $85.00 | $89.00 | $90.00 |
| 0030 | Work zone sign (0102-60) | ED | 11,596 | $0.25 | $2.00 | $0.50 | $0.35 | $0.23 | $0.23 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 27,454 | $0.10 | $0.50 | $0.75 | $0.20 | $0.12 | $0.13 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 2,631 | $0.17 | $4.50 | $0.30 | $1.00 | $0.05 | $0.12 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 716 | $4.55 | $19.00 | $10.00 | $10.00 | $6.00 | $5.75 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 854 | $10.24 | $22.00 | $15.00 | $20.00 | $12.00 | $11.30 |
| 0055 | Type III barricade (0102-115) | ED | 210 | $0.27 | $50.00 | $2.00 | $1.00 | $0.30 | $0.75 |
| 0060 | Portable regulatory, sign (0102-150-1) | ED | 108 | $5.69 | $101.00 | $15.00 | $15.00 | $6.00 | $9.20 |
| 0065 | Radar speed display unit (0102-150-2) | ED | 108 | $6.83 | $101.00 | $15.00 | $15.00 | $6.00 | $9.20 |
| 0070 | Sediment barrier (0104-10-3) | LF | 73 | $3.41 | $147.00 | $15.00 | $20.00 | $6.00 | $10.00 |
| 0075 | Inlet protection system (0104-18) | EACH | 193 | $113.77 | $247.00 | $150.00 | $80.00 | $155.00 | $100.00 |
| 0080 | Litter removal (0107-1) | ACRE | 153 | $40.96 | $84.00 | $35.00 | $80.00 | $10.00 | $30.00 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 1,066 | $56.88 | $98.00 | $45.00 | $60.00 | $45.00 | $49.20 |
| 0090 | Concrete curb & gutter, type F (0520-1-10) | LF | 131 | $73.95 | $137.00 | $60.00 | $100.00 | $110.00 | $73.60 |
| 0095 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 965 | $136.52 | $166.00 | $100.00 | $90.00 | $61.00 | $127.00 |
| 0100 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 72 | $159.27 | $326.00 | $120.00 | $150.00 | $71.00 | $156.00 |
| 0105 | Detectable warnings (0527-2) | SF | 51 | $113.77 | $244.00 | $60.00 | $50.00 | $44.00 | $55.20 |
| 0110 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0115 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $5,665.00 | $5,665.00 | $5,665.00 | $5,665.00 | $5,665.00 | $5,665.00 |
| 0120 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $44,335 | $44,335 | $44,335 | $44,335 | $44,335 | $44,335 |
| 0125 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 2 | $739.48 | $5,572.00 | $2,000.00 | $500.00 | $900.00 | $731.00 |
| 0130 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $56.88 | $5,202.00 | $500.00 | $100.00 | $300.00 | $230.00 |
| 0135 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 19,014 | $28.44 | $23.00 | $32.00 | $30.00 | $31.47 | $30.00 |
| 0140 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 78 | $568.83 | $1,012.00 | $1,800.00 | $1,500.00 | $1,499.87 | $2,000.00 |
| 0145 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 64,173 | $1.56 | $2.00 | $3.00 | $5.00 | $3.34 | $2.00 |
| 0150 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 60,162 | $0.27 | $0.50 | $0.15 | $0.25 | $0.32 | $0.10 |
| 0155 | Load center, rework, voltage (0715-7-21) | EACH | 3 | $2,574.52 | $4,125.00 | $4,700.00 | $6,000.00 | $4,970.00 | $3,000.00 |
| 0160 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 153 | $942.03 | $1,467.00 | $1,250.00 | $1,250.00 | $1,585.00 | $1,700.00 |
| 0165 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 7 | $6,709.78 | $6,905.00 | $7,500.00 | $10,000 | $8,990.00 | $13,000 |
| 0170 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 59 | $10,492 | $8,455.00 | $8,500.00 | $11,500 | $11,723 | $14,200 |
| 0175 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 122 | $769.06 | $901.00 | $1,500.00 | $800.00 | $920.00 | $1,000.00 |
| 0180 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 66 | $619.09 | $699.00 | $750.00 | $650.00 | $1,096.00 | $990.00 |
| 0185 | Fiber optic cable locator (0633-6) | DA | 247 | $163.82 | $62.00 | $150.00 | $175.00 | $167.00 | $200.00 |
| 0190 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 7 | $824.80 | $2,630.00 | $2,000.00 | $2,000.00 | $1,750.00 | $2,200.00 |
| 0195 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 6 | $824.80 | $2,875.00 | $2,000.00 | $2,000.00 | $1,749.00 | $2,200.00 |
| 0200 | Pull & splice box, F&I, 30" X 48" cover size (0635-2-15) | EACH | 1 | $3,299.20 | $14,263 | $5,009.90 | $5,036.87 | $3,900.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.