Ferreira Construction Co., Inc.: FDOT bid record
Ferreira Construction Co., Inc. submitted 24 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 30 SEP 2026, and was the low bidder on 8 of them (33%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $64,178,487
- Latest bid
- 30 SEP 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 4 | 3 | 75% |
| 2019 | 6 | 2 | 33% |
| 2020 | 3 | 0 | 0% |
| 2021 | 5 | 1 | 20% |
| 2023 | 1 | 1 | 100% |
| 2024 | 1 | 1 | 100% |
| 2025 | 1 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 17 | 4 | 24% |
| District 6 | 6 | 4 | 67% |
| District 1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 25 | 10 (40%) | $20.00 | $30.82 |
| Electrical power service, F&I, underground, meter by contractor | 0639-1122 | AS | 14 | 9 (64%) | $1,874.85 | $4,500.00 |
| Prestressed concrete pole, type P-II service pole | 0641-2-12 | EACH | 16 | 8 (50%) | $1,555.45 | $2,200.00 |
| Lighting conductors, F&I, insulated, no.8 - 6 | 0715-1-12 | LF | 18 | 7 (39%) | $1.70 | $2.40 |
| Performance turf, sod | 0570-1-2 | SY | 18 | 6 (33%) | $4.25 | $5.00 |
| Lighting conductors, F&I, insulated, no 4 to no 2 | 0715-1-13 | LF | 12 | 6 (50%) | $1.59 | $3.50 |
| Optional base, base group 09 | 0285-709 | SY | 8 | 6 (75%) | $13.00 | $43.25 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 23 | 5 (22%) | $10.85 | $16.54 |
| Portable changeable message sign, temporary | 0102-99 | ED | 22 | 4 (18%) | $11.18 | $12.00 |
| Litter removal | 0107-1 | ACRE | 15 | 4 (27%) | $30.00 | $52.98 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 15 | 4 (27%) | $60.00 | $65.00 |
| Pole cable distribution system, furnish and install, conventional | 0715-500-1 | EACH | 12 | 4 (33%) | $557.00 | $816.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Halley Engineering Contractors, Inc. | 8 | 3 of 8 |
| Lead Engineering Contractors, LLC | 8 | 4 of 8 |
| Carr Construction, LLC | 6 | 5 of 6 |
| Jva Engineering Contractor, Inc | 6 | 1 of 6 |
| American Lighting and Signalization, LLC. | 6 | 4 of 6 |
| Horsepower Electric, Inc. | 6 | 1 of 6 |
| Zahlene Enterprises Inc. | 6 | 4 of 6 |
| Traffic Management Solutions, LLC | 5 | 3 of 5 |
| Arc Electric Inc | 5 | 4 of 5 |
| Condotte America, Inc. | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 SEP 2026 | T1944 | District 1 | HOMESTEAD AVE OVER MARSH CREEK, BRIDGE NO 074026 | 6 of 8 | $1,798,675 | +72% |
| 26 AUG 2026 | T4773 | District 4 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | 9 of 13 | $3,299,688 | +27% |
| 28 JAN 2026 | T4750 | District 4 | SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | 7 of 11 | $2,114,794 | +14% |
| 29 OCT 2025 | T4743 | District 4 | SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL | 10 of 10 | $3,654,228 | +47% |
| 25 SEP 2024 | T4714 | District 4 | SR 5 (US 1) OVER EARMAN RIVER (C-17) BRIDGE NO 930003 | 1 of 5 | $13,692,603 | Low, 2.0% under the second |
| 06 DEC 2023 | T4662 | District 4 | NORTH SHORE DR FROM S OF CARVER CANAL TO N OF CARVER CANAL | 1 of 4 | $2,710,165 | Low, 10% under the second |
| 28 APR 2021 | T6528 | District 6 | SR 826 (FRONTAGE RD) | 1 of 12 | $2,045,400 | Low, 0.0% under the second |
| 17 FEB 2021 | T4568 | District 4 | SR 700 (OLD CONNERS HWY) | 10 of 11 | $10,898,973 | +33% |
| 27 JAN 2021 | T4558 | District 4 | SR 704 (OKEECHOBEE BLVD) | 3 of 4 | $719,569 | +13% |
| 27 JAN 2021 | T4559 | District 4 | CORAL RIDGE DR | 13 of 13 | $11,258,400 | +49% |
| 27 JAN 2021 | T4572 | District 4 | AUSTRALIAN AVE | 2 of 11 | $2,991,926 | +1.0% |
| 25 MAR 2020 | T4539 | District 4 | SR 93/SR 84 | 9 of 9 | $7,833,400 | +10% |
| 26 FEB 2020 | T4537 | District 4 | SR 9 (I-95) | 2 of 7 | $12,553,790 | +2.0% |
| 29 JAN 2020 | T6523 | District 6 | SR 9 (NW 27TH AVE) | 9 of 9 | $2,529,400 | +59% |
| 30 OCT 2019 | T4531 | District 4 | SR 656 (17TH ST) | 1 of 1 | $1,219,731 | Low |
| 28 AUG 2019 | T6485 | District 6 | SR 5 (US 1) | 1 of 9 | $6,666,400 | Low, 5.0% under the second |
| 24 APR 2019 | T4516 | District 4 | SR 838 AND SR A1A | 6 of 7 | $1,841,145 | +19% |
| 24 APR 2019 | T4517 | District 4 | SR 816 AND SR 870 | 2 of 7 | $2,267,382 | +23% |
| 27 FEB 2019 | T4498 | District 4 | CONGRESS AVE | 4 of 4 | $4,290,838 | +25% |
| 30 JAN 2019 | T4499 | District 4 | SR A1A | 3 of 7 | $5,598,679 | +4.0% |
| 05 DEC 2018 | T4489 | District 4 | SR 9 (I-95) | 1 of 5 | $5,985,000 | Low, 2.0% under the second |
| 13 JUN 2018 | T6427 | District 6 | SR 847 (NW 47 AVE) | 1 of 5 | $18,966,444 | Low, 10% under the second |
| 13 JUN 2018 | T6442 | District 6 | SR 847 (NW 47 AVE) | 1 of 7 | $12,892,744 | Low, 7.0% under the second |
| 23 MAY 2018 | T6422 | District 6 | SR 997 (KROME AVE) (SW 177TH AVE) | 5 of 9 | $39,889,400 | +7.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.