Lead Engineering Contractors, LLC: FDOT bid record

Lead Engineering Contractors, LLC submitted 49 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 30 SEP 2026, and was the low bidder on 6 of them (12%). When it was not low, its total sat a median +19% above the low bid.

Owner
Florida DOT
Low bid volume
$76,871,419
Latest bid
30 SEP 2026
Data through
28 OCT 2026
49Bids
6Low bids
12Win rate, percent
+19%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
201810110%
20197114%
202011218%
20217114%
20222150%
2023400%
2024400%
2025200%
2026200%
Lead Engineering Contractors, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 629414%
District 419211%
District 1100%
Lead Engineering Contractors, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Thermoplastic, standard, arrow0711-11170EACH4026 (65%)$45.00$80.00
Thermoplastic, standard, message or symbol0711-11160EACH3725 (68%)$63.00$149.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED4722 (47%)$0.10$0.13
Performance turf, sod0570-1-2SY4322 (51%)$3.75$5.00
Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6"0711-11141GM3921 (54%)$1,025.00$2,500.00
Work zone sign0102-60ED4820 (42%)$0.20$0.25
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH10519 (18%)$775.00$1,150.00
Conduit, furnish & install, directional bore0630-2-12LF9618 (19%)$24.00$30.82
Portable changeable message sign, temporary0102-99ED4717 (36%)$10.25$12.00
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF4217 (40%)$3.10$6.09
Arrow board / advance warning arrow panel0102-76ED4017 (43%)$5.08$5.90
Thermoplastic, preformed, white, solid, 24" for crosswalk0711-14125LF3617 (47%)$14.50$17.00
Lead Engineering Contractors, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Lead Engineering Contractors, LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 SEP 2026T6398District 6SR 907 (ALTON RD) FROM MICHIGAN AVE TO S OF 43 ST (ED SULLIVAN DR)2 of 4$85,893,694+13%
20 MAY 2026T4666District 4SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD)8 of 8$72,977,218+34%
27 AUG 2025T4688District 4SR 817 (UNIVERSITY DR) FROM N OF SR 824 (PEMBROKE RD) TO N..2 of 7$43,214,810+1.0%
30 JUL 2025T4736District 4SR 27 (US 27) AT I-75/US 27 INTERCHANGE2 of 7$22,688,237+8.0%
30 OCT 2024T6604District 6SR 860 (MIAMI GARDENS DR) FROM W OF NW 27 AVE TO W OF NW 2ND3 of 4$11,291,702+19%
22 MAY 2024T4677District 4SR 810 (HILLSBORO BLVD) FROM SR 7 (US 441) TO SR 845 (POW...3 of 4$9,587,286+23%
22 MAY 2024T6566District 6SR 932 (NW 103 ST / W 49 ST) FROM W OF NW 82 AVE TO E...3 of 6$9,101,000+10%
27 MAR 2024T4661District 4SR 820 (PINES BLVD) FROM SR 93 (I-75 N / ALLIGATOR ALLEY)...4 of 4$11,652,486+23%
06 DEC 2023T4662District 4NORTH SHORE DR FROM S OF CARVER CANAL TO N OF CARVER CANAL3 of 4$3,300,302+22%
25 OCT 2023T6574District 6SR 916 (OPA-LOCKA BLVD) (NW 135 ST) (NW 136 ST) FROM W OF...8 of 9$4,323,099+29%
22 FEB 2023T6541District 6SR A1A (COLLINS AVE)3 of 4$7,070,671+16%
25 JAN 2023T6552District 6SR 909 (W DIXIE HWY)4 of 5$7,351,300+26%
25 MAY 2022T6538District 6SR 90 (SW 8TH ST)1 of 6$13,790,706Low, 4.0% under the second
27 APR 2022T6537District 6SR 5/US-1/S DIXIE HWY2 of 3$6,910,638+14%
26 MAY 2021T4582District 4SR 5 (US 1)1 of 3$28,428,146Low, 28% under the second
28 APR 2021T6528District 6SR 826 (FRONTAGE RD)6 of 12$2,096,943+3.0%
31 MAR 2021T6506District 6SR 994 (QUAIL ROOST DR)6 of 12$4,411,317+9.0%
17 FEB 2021T4568District 4SR 700 (OLD CONNERS HWY)7 of 11$10,336,311+26%
27 JAN 2021T4559District 4CORAL RIDGE DR10 of 13$9,580,620+27%
27 JAN 2021T4560District 4BRANT DR BRIDGE REPLACEMENT6 of 7$3,062,873+24%
27 JAN 2021T6452District 6SR 989 AND SR 5 (US 1)2 of 6$2,415,484+1.0%
18 NOV 2020T4556District 4SR 834 (SAMPLE RD)2 of 11$2,834,635+5.0%
30 SEP 2020T6486District 6SR 860/MIAMI GARDENS/NW 183 ST4 of 11$3,856,742+5.0%
26 AUG 2020T6505District 6SR 94 (KENDALL DR/SW 88 ST)12 of 14$5,110,111+11%
29 JUL 2020T6507District 6SR 90/SW 8TH ST7 of 12$1,695,640+10%
Lead Engineering Contractors, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy