FDOT letting results, September 30, 2026
15 contracts let by Florida DOT on September 30, 2026, $136,943,675 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 15
- Low bids, total
- $136,943,675
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T6398 | SR 907 (ALTON RD) FROM MICHIGAN AVE TO S OF 43 ST (ED SULLIVAN DR) | District 6 | 4 | Ohla USA Inc | $75,760,761 | $85,893,694 | +13% | FDOT |
| T2A80 | SR 55 (US 19) FROM N OF SR 121 TO S OF OTTER CREEK AND AT BULLFROG | District 2 | 3 | Anderson Columbia Co., Inc. | $19,095,716 | $20,611,913 | +8.0% | FDOT |
| T3937 | CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 530026 | District 3 | 4 | Murphree Bridge Corporation | $7,547,559 | $9,343,927 | +24% | FDOT |
| T3A26 | SR 10 (US 90 / MAHAN DR) FROM CR 0353 (DEMPSEY MAYO RD) TO APEX DR | District 3 | 4 | C.W. Roberts Contracting, Inc. | $5,743,903 | $5,773,174 | +1.0% | FDOT |
| T5893 | SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 600 | District 5 | 8 | Masci General Contractors, Inc | $5,641,959 | $5,934,449 | +5.0% | FDOT |
| T2A79 | SR 25 (US 41) FROM N OF SR 8 (I-10) TO HAMILTON CO LINE | District 2 | 1 | Anderson Columbia Co., Inc. | $5,638,495 | FDOT | ||
| T2A81 | SR 20 (US 27) FROM SJ TOM MOORE AVE TO END OF 4-LANE | District 2 | 3 | Anderson Columbia Co., Inc. | $3,421,662 | $4,133,882 | +21% | FDOT |
| T6593 | SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY | District 6 | 5 | Ohla USA Inc | $2,978,999 | $3,425,838 | +15% | FDOT |
| T3908 | SCOTT RD OVER ECONFINA CREEK, BRIDGE NO 464423 | District 3 | 5 | RBM Contracting Services, LLC | $2,633,800 | $2,679,117 | +2.0% | FDOT |
| T3A46 | SR 61 (THOMSVILLE HWY) FROM N OF SR 63 (US 27 / MONROE ST) TO N OF 9TH | District 3 | 3 | Capital Asphalt Inc | $2,194,287 | $2,245,879 | +2.0% | FDOT |
| T3A23 | SR 75 (US 231) FROM S OF SR 10 (US 90) TO END OF CURB AND GUTTER | District 3 | 3 | American Sand & X-Cavation, Inc. DBA American Sand & Asphalt Paving | $1,987,512 | $2,040,118 | +3.0% | FDOT |
| T6613 | SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W | District 6 | 9 | Weekley Asphalt Paving, Inc. | $1,690,338 | $1,828,110 | +8.0% | FDOT |
| T1944 | HOMESTEAD AVE OVER MARSH CREEK, BRIDGE NO 074026 | District 1 | 8 | Zep Construction, Inc. | $1,043,588 | $1,572,671 | +51% | FDOT |
| T1943 | SR 776 AT OCEANSPRAY BLVD | District 1 | 5 | Yoroca Engineering Contractors, LLC | $973,567 | $1,051,260 | +8.0% | FDOT |
| T7622 | SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM | District 7 | 9 | Blacktip Services Incorporated | $591,529 | $593,478 | 0.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.