| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $43,351 | $42,000 | $33,257 |
| 0010 | Concrete class IV, culverts (0400-4-1) | CY | 473.60 | $2,226.09 | $2,650.00 | $1,910.00 |
| 0013 | Reinforcing steel- roadway (0415-1-1) | LB | 100,011 | $1.39 | $1.75 | $1.91 |
| 0015 | Mobilization (0101-1) | LS | 1 | $551,149 | $1,021,430 | $1,252,003 |
| 0020 | Mobilization (0101-1) | LS | 1 | $43,351 | $206,000 | $194,667 |
| 0025 | Maintenance of traffic (0102-1) | DA | 1 | $347,371 | $356,550 | $598,300 |
| 0030 | Maintenance of traffic (0102-1) | DA | 1 | $57,437 | $54,425 | $79,345 |
| 0035 | Special detour- temporary pavement (0102-2200) | SY | 1 | $286,952 | $253,250 | $265,000 |
| 0040 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $435,786 | $540,750 | $255,000 |
| 0045 | Work zone sign (0102-60) | ED | 42,170 | $0.21 | $0.27 | $0.27 |
| 0050 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 7,452 | $41.18 | $40.00 | $40.85 |
| 0055 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 1,476 | $27.09 | $27.00 | $26.88 |
| 0060 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 3,372 | $16.26 | $16.00 | $16.13 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 557,660 | $0.11 | $0.10 | $0.10 |
| 0070 | Arrow board / advance warning arrow panel (0102-76) | ED | 4,030 | $5.42 | $5.25 | $5.38 |
| 0075 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 19,691 | $4.61 | $4.50 | $5.38 |
| 0080 | Temporary crash cushion, redirective option (0102-89-1) | LO | 9 | $991.66 | $2,500.00 | $984.00 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 1,835 | $10.84 | $10.50 | $10.75 |
| 0090 | Type III barricade (0102-115) | ED | 7,180 | $0.33 | $0.27 | $0.27 |
| 0095 | Portable regulatory, sign (0102-150-1) | ED | 160 | $5.42 | $10.50 | $10.75 |
| 0100 | Radar speed display unit (0102-150-2) | ED | 2,800 | $5.42 | $5.25 | $5.38 |
| 0105 | Artificial coverings /rolled erosion control products (0104-1) | SY | 154 | $5.42 | $10.00 | $25.00 |
| 0110 | Sediment barrier (0104-10-3) | LF | 6,115 | $3.66 | $1.25 | $1.75 |
| 0115 | Floating turbidity barrier (0104-11) | LF | 116 | $27.09 | $17.50 | $50.00 |
| 0120 | Soil tracking prevention device (0104-15) | EACH | 2 | $3,429.81 | $1,500.00 | $2,500.00 |
| 0125 | Inlet protection system (0104-18) | EACH | 28 | $170.08 | $160.00 | $125.00 |
| 0130 | Litter removal (0107-1) | ACRE | 3,872.01 | $54.19 | $34.00 | $80.63 |
| 0135 | Mowing (0107-2) | ACRE | 3,676.94 | $27.09 | $53.00 | $80.63 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $66,485 | $200,000 | $57,500 |
| 0145 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $105,561 | $78,500 | $91,875 |
| 0150 | Removal of existing concrete (0110-4-10) | SY | 33 | $112.81 | $65.00 | $68.80 |
| 0155 | Regular excavation (0120-1) | CY | 1,104.90 | $29.42 | $13.00 | $10.00 |
| 0160 | Embankment (0120-6) | CY | 7,100.30 | $7.63 | $19.50 | $15.00 |
| 0165 | Type B stabilization (0160-4) | SY | 10,494 | $3.01 | $9.75 | $13.80 |
| 0170 | Optional base, base group 01 (0285-701) | SY | 2,482 | $14.24 | $19.75 | $20.63 |
| 0175 | Optional base, base group 09 (0285-709) | SY | 6,136 | $21.76 | $21.00 | $20.63 |
| 0180 | Turnout base- optional materials (0286-1) | SY | 293 | $22.12 | $37.25 | $25.00 |
| 0185 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 6,370 | $5.88 | $6.50 | $1.98 |
| 0190 | Milling existing asphalt pavement, 5 1/4" avg depth (0327-70-9) | SY | 1,051 | $10.10 | $13.85 | $3.83 |
| 0195 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 288,710 | $1.09 | $1.95 | $2.35 |
| 0200 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 24,293 | $2.98 | $3.85 | $1.55 |
| 0205 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 182,676 | $4.06 | $2.35 | $3.04 |
| 0210 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 35.60 | $247.07 | $295.00 | $165.00 |
| 0215 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 58,182.30 | $134.82 | $127.00 | $156.57 |
| 0220 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 19,217.80 | $177.63 | $216.50 | $214.67 |
| 0225 | Miscellaneous asphalt (0339-1) | TN | 43.50 | $328.29 | $340.00 | $250.00 |
| 0230 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 54.50 | $2,384.32 | $1,750.00 | $2,227.40 |
| 0235 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 4 | $10,281 | $13,750 | $11,596 |
| 0240 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 1,685 | $49.85 | $75.00 | $240.88 |
| 0245 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 352 | $80.20 | $80.00 | $79.55 |
| 0250 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 52 | $185.50 | $260.00 | $185.00 |
| 0255 | Guardrail -roadway, general (0536-1-1) | LF | 1,381 | $28.18 | $28.75 | $27.95 |
| 0260 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 4 | $3,251.35 | $3,850.00 | $3,762.50 |
| 0265 | Guardrail removal (0536-73) | LF | 1,217 | $2.17 | $2.20 | $2.15 |
| 0270 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $6,400.13 | $3,640.00 | $3,536.75 |
| 0275 | Fencing, type A, 0.0-5.0', standard (0550-10110) | LF | 105 | $136.09 | $26.25 | $10.00 |
| 0280 | Fencing, type A, 8.1-10.0', (0550-10150) | LF | 9,412 | $31.66 | $22.80 | $35.00 |
| 0285 | Performance turf, sod (0570-1-2) | SY | 116,773 | $2.38 | $4.10 | $2.63 |
| 0290 | Shoulder drop off soil (0570-13-1) | CY | 12,938 | $18.23 | $11.85 | $12.50 |
| 0295 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 33.06 | $1,842.43 | $1,800.00 | $1,775.00 |
| 0300 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 201 | $2.00 | $2.00 | $1.61 |
| 0305 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 26.15 | $758.65 | $735.00 | $860.00 |
| 0310 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.58 | $867.03 | $840.00 | $860.00 |
| 0315 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 104 | $50.93 | $50.00 | $48.40 |
| 0320 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 26.10 | $1,842.43 | $1,800.00 | $1,775.00 |
| 0325 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 2.10 | $867.03 | $840.00 | $860.00 |
| 0330 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $121,229 | $121,229 | $121,229 |
| 0335 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $28,771 | $28,771 | $28,771 |
| 0340 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 48.48 | $2,046.66 | $2,575.00 | $2,080.00 |
| 0345 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 90 | $536.48 | $520.00 | $532.15 |
| 0350 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,162.15 | $2,100.00 | $2,145.00 |
| 0355 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $162.57 | $158.00 | $161.25 |
| 0360 | Single column ground sign assembly, remove (0700-1600) | EACH | 28 | $27.09 | $26.00 | $26.88 |
| 0365 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $49.90 | $48.50 | $49.50 |
| 0370 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 80 | $70.45 | $68.25 | $70.00 |
| 0375 | Object marker, type 2 (0705-10-2) | EACH | 8 | $81.29 | $78.75 | $80.65 |
| 0380 | Delineator, flexible tubular (0705-11-1) | EACH | 76 | $65.03 | $63.00 | $64.50 |
| 0385 | Raised pavement marker, type B (0706-1-3) | EACH | 17,101 | $4.61 | $4.50 | $5.38 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,441.77 | $2,375.00 | $209,625 |
| 0395 | Painted pavement markings, surface (0710-90) | LS | 1 | $166,955 | $115,950 | $5,375.00 |
| 0400 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 201 | $8.67 | $7.50 | $8.00 |
| 0405 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.58 | $3,142.98 | $1,550.00 | $2,890.00 |
| 0410 | Thermoplastic, standard, arrow (0711-11170) | EACH | 104 | $75.87 | $100.00 | $115.56 |
| 0415 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 2.10 | $3,142.98 | $1,550.00 | $2,080.15 |
| 0420 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 26.19 | $4,985.42 | $6,265.00 | $6,703.00 |
| 0425 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 26.15 | $1,734.06 | $1,550.00 | $1,850.00 |
| 0430 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 23.92 | $4,985.42 | $6,265.00 | $6,703.00 |
| 0435 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.29 | $5,093.81 | $5,550.00 | $5,780.00 |
| 0440 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.08 | $5,093.81 | $5,550.00 | $5,780.00 |
| 0445 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.07 | $51,317 | $36,750 | $52,004 |
| 0450 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.05 | $34,139 | $12,600 | $11,557 |
| 0455 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.07 | $51,317 | $36,750 | $52,004 |
| 0460 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.04 | $34,139 | $12,600 | $11,557 |
| 0465 | Preformed/permanent tape, remove (0713-107) | SF | 559 | $4.33 | $3.25 | $2.31 |