Whitehurst, V. E. & Sons, Inc.: FDOT bid record
Whitehurst, V. E. & Sons, Inc. submitted 56 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 11 of them (20%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $60,995,696
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 6 | 2 | 33% |
| 2019 | 6 | 0 | 0% |
| 2020 | 9 | 1 | 11% |
| 2022 | 3 | 1 | 33% |
| 2023 | 5 | 0 | 0% |
| 2024 | 9 | 3 | 33% |
| 2025 | 9 | 1 | 11% |
| 2026 | 9 | 3 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 55 | 11 | 20% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Regular excavation | 0120-1 | CY | 36 | 29 (81%) | $17.50 | $25.47 |
| Inlet protection system | 0104-18 | EACH | 48 | 26 (54%) | $125.00 | $150.00 |
| Performance turf, sod | 0570-1-2 | SY | 52 | 25 (48%) | $2.58 | $5.00 |
| Milling existing asphalt pavement, 1 1/2" avg depth | 0327-70-6 | SY | 30 | 22 (73%) | $2.31 | $4.61 |
| Sediment barrier | 0104-10-3 | LF | 53 | 20 (38%) | $1.75 | $2.60 |
| Asphalt concrete friction course,traffic C, FC-12.5, PG | 0337-7-83 | TN | 43 | 18 (42%) | $144.80 | $185.00 |
| Embankment | 0120-6 | CY | 31 | 18 (58%) | $20.00 | $30.04 |
| Optional base, base group 01 | 0285-701 | SY | 41 | 17 (41%) | $17.50 | $24.00 |
| Superpave asphaltic concrete, traffic C, PG76-22 | 0334-1-53 | TN | 37 | 17 (46%) | $144.70 | $169.18 |
| Optional base, base group 09 | 0285-709 | SY | 29 | 16 (55%) | $58.30 | $43.25 |
| Borrow excavation, truck measure | 0120-2-2 | CY | 21 | 16 (76%) | $15.00 | $38.80 |
| Miscellaneous asphalt | 0339-1 | TN | 20 | 16 (80%) | $212.50 | $375.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anderson Columbia Co., Inc. | 52 | 35 of 52 |
| Preferred Materials Inc. | 48 | 23 of 48 |
| Watson Construction Company, LLC | 15 | 5 of 15 |
| C.W. Roberts Contracting, Inc. | 8 | 6 of 8 |
| Superior Asphalt, Inc. | 5 | 2 of 5 |
| Duval Asphalt Products, Inc. | 4 | 1 of 4 |
| D.A.B. Constructors, Inc. | 3 | 1 of 3 |
| Halifax Paving, Inc. | 3 | 2 of 3 |
| P & S Paving, Inc. | 2 | 2 of 2 |
| Commercial Industrial Corp. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A82 | District 2 | SR 24A / SR 226 (SW 16TH AVE) FROM SR 24 (ARCHER RD) TO SR 331 (SE WILLISTON | 1 of 5 | $2,916,574 | Low, 10% under the second |
| 30 SEP 2026 | T2A80 | District 2 | SR 55 (US 19) FROM N OF SR 121 TO S OF OTTER CREEK AND AT BULLFROG | 3 of 3 | $22,848,946 | +20% |
| 26 AUG 2026 | T2A69 | District 2 | SR 45 (US 27 / US 41) FROM SR 24 (ARCHER RD) TO S OF SR 26 (W NEWBERRY | 4 of 4 | $6,502,630 | +16% |
| 26 AUG 2026 | T2A74 | District 2 | SR 26 (W UNIVERSITY AVE) FROM SW 38TH ST TO GALE LEMERAND DR | 2 of 3 | $3,978,256 | +13% |
| 10 JUN 2026 | T2A50 | District 2 | SR 55 (US 19) AT NW MAIN ST AND AT USHER CREEK BRIDGE FROM.. | 3 of 3 | $18,691,710 | +19% |
| 20 MAY 2026 | T2A66 | District 2 | SR 500 (US ALT 27) AND SR 49 (US 129) AT CR 335A AND AT NW.. | 1 of 4 | $2,146,953 | Low, 6.0% under the second |
| 25 MAR 2026 | T2A70 | District 2 | SR 121 FROM SR 55 (US 19) TO SR 45 (US 41 / SW 7TH ST) | 4 of 5 | $12,217,757 | +15% |
| 25 FEB 2026 | T2A33 | District 2 | SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL | 3 of 8 | $7,569,433 | +21% |
| 25 FEB 2026 | T2A59 | District 2 | SR 500 (US 27) FROM NE 10TH ST TO MARION CO LINE | 1 of 6 | $3,937,846 | Low, 14% under the second |
| 29 OCT 2025 | T2A41 | District 2 | SR 45 (US 27) FROM N OF SR 26 (W NEWBERRY RD) TO SR 25 (US | 2 of 4 | $7,651,964 | +6.0% |
| 29 OCT 2025 | T2A44 | District 2 | SR 45 (US 27) FROM SR 500 (US 27) TO ALACHUA CO LINE | 2 of 5 | $5,903,343 | +5.0% |
| 24 SEP 2025 | T2A45 | District 2 | SR 10 (US 90) AT SW HEATHRIDGE DR | 1 of 4 | $822,535 | Low, 2.0% under the second |
| 30 JUL 2025 | T2A30 | District 2 | SR 20 (US 441 / MARTIN LUTHER KING MEMORIAL HWY) FROM NW 167 | 2 of 4 | $5,993,011 | +4.0% |
| 26 MAR 2025 | T2A18 | District 2 | SR 16 FROM UNION CO LINE TO SR 200 (US 301) | 2 of 3 | $8,247,694 | +13% |
| 26 MAR 2025 | T5847 | District 5 | SR 25 FROM N OF CR 25A TO AVE I AND FROM AVE I TO ALACHUA... | 5 of 5 | $16,159,605 | +14% |
| 26 FEB 2025 | T2A17 | District 2 | SR 222 (NW 39TH AVE) AT SR 25 (US 441/SW 13TH ST) AND FROM.. | 2 of 5 | $5,035,284 | +3.0% |
| 29 JAN 2025 | T2996 | District 2 | SR 200 (US 301) FROM SR 20 TO SR 26 | 3 of 3 | $16,030,353 | +29% |
| 29 JAN 2025 | T2A11 | District 2 | SR 345 FROM CR 345 TO SR 500 | 5 of 5 | $7,521,787 | +52% |
| 04 DEC 2024 | T2A07 | District 2 | SR 26 (NEWBERRY RD) FROM W OF CR 241 S TO W OF SR 93 (I-75) | 4 of 4 | $14,045,339 | +22% |
| 04 DEC 2024 | T2A08 | District 2 | SR 24 (NE WALDO RD) FROM S OF SR 26 TO N OF SR 222 | 4 of 4 | $8,512,023 | +7.0% |
| 13 NOV 2024 | T2A02 | District 2 | SR 200 (US 301) FROM MARION CO LINE TO N OF 203RD ST | 4 of 4 | $7,776,043 | +5.0% |
| 25 SEP 2024 | T2997 | District 2 | SR 24 (ARCHER RD) AT SW 143RD ST AND SW 111TH TERR | 3 of 4 | $3,105,573 | +24% |
| 28 AUG 2024 | T2989 | District 2 | SR 26 FROM E OF SR 200 (US 301) TO SR 21 | 1 of 3 | $5,914,935 | Low, 13% under the second |
| 27 MAR 2024 | T2763 | District 2 | SR 24 AT NE 96TH PLACE AND FROM BRONSON TO ALACHUA CO LINE | 2 of 3 | $7,381,124 | +4.0% |
| 27 MAR 2024 | T2977 | District 2 | SR 24 (NE WALDO RD) FROM SR 222 TO SR 200 (US 301) | 1 of 2 | $20,982,500 | Low, 4.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.