28 contracts let by Florida DOT on March 26, 2025, $286,568,425 in low bids, a median of 3.5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 28
- Low bids, total
- $286,568,425
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4722 | SR 9 (I-95) FROM S OF SR 76 (KANNER HWY) TO MARTIN... | District 4 | 4 | C.W. Roberts Contracting, Inc. | $40,833,166 | $44,456,789 | +9.0% | FDOT |
| T4710 | SR 93 (I-75) FROM S ROYAL BLVD TO S SW 14TH ST | District 4 | 2 | Ohla USA Inc | $36,200,328 | $41,930,767 | +16% | FDOT |
| T4699 | CR 510 (85TH ST) FROM CR 512 TO 87TH ST | District 4 | 4 | Timothy Rose Contracting, Inc. | $24,890,809 | $27,113,820 | +9.0% | FDOT |
| T5836 | SR 60 FROM BLANKET BAY SLOUGH TO PEAVINE TR | District 5 | 7 | C.W. Roberts Contracting, Inc. | $18,317,204 | $19,500,000 | +6.0% | FDOT |
| T1910 | SR 55 (US 19) AND SR 684 FROM 23RD AVE W TO 39TH ST E, FR... | District 1 | 3 | Preferred Materials Inc. | $14,661,723 | $16,793,498 | +15% | FDOT |
| T5847 | SR 25 FROM N OF CR 25A TO AVE I AND FROM AVE I TO ALACHUA... | District 5 | 5 | Anderson Columbia Co., Inc. | $14,193,258 | $14,218,001 | 0.0% | FDOT |
| T7569 | SR 43 (US 301) FROM MANATEE CO LINE TO S OF SR 674 (SUN... | District 7 | 4 | Ajax Paving Industries of Florida LLC | $13,589,072 | $15,476,217 | +14% | FDOT |
| T2A19 | SR 5 (US 17) FROM N OF BROWARD RIVER TO NASSAU CO LINE | District 2 | 4 | Preferred Materials Inc. | $13,187,701 | $14,885,983 | +13% | FDOT |
| T2998 | SR 15 (US 17) FROM OAK ST TO BLACK CREEK | District 2 | 4 | Duval Asphalt Products, Inc. | $12,335,810 | $14,603,806 | +18% | FDOT |
| T7547 | SR 595 (ALT US 19 / TYRONE BLVD) FROM 5TH AVE N TO PARK ST N | District 7 | 3 | Gosalia Concrete Constructors, Inc. | $11,332,332 | $13,650,162 | +20% | FDOT |
| T3942 | SR 8 (I-10) FROM W OF SR 81 TO CHOCTAWHATCHEE RIVER BRIDGE | District 3 | 3 | C.W. Roberts Contracting, Inc. | $10,713,495 | $12,160,048 | +14% | FDOT |
| T5837 | SR 5 FROM MYERS DR TO CRANE CREEK BRIDGE, NO 700006 | District 5 | 3 | Timothy Rose Contracting, Inc. | $10,009,766 | $10,611,470 | +6.0% | FDOT |
| T1906 | SR 25 (US 27) FROM STITT RANCH TO W OF FLAGHOLE RD | District 1 | 6 | Ohla USA Inc | $9,321,660 | $9,357,540 | 0.0% | FDOT |
| T3934 | SR 30 (US 98) FROM SANTA ROSA CO LINE TO W OF JOSIE RD | District 3 | 3 | C.W. Roberts Contracting, Inc. | $7,993,242 | $8,990,378 | +12% | FDOT |
| T3944 | SR 10 (US 90/TENNESSEE ST) FROM SR 61 (US 27/MONROE ST) TO.. | District 3 | 2 | C.W. Roberts Contracting, Inc. | $7,523,719 | $8,368,627 | +11% | FDOT |
| T3935 | SR 8 (I-10) FROM W OF OLSON RD TO E OF SR 10 (US 90/MAHAN... | District 3 | 3 | C.W. Roberts Contracting, Inc. | $7,306,078 | $7,669,113 | +5.0% | FDOT |
| T2A18 | SR 16 FROM UNION CO LINE TO SR 200 (US 301) | District 2 | 3 | Anderson Columbia Co., Inc. | $7,268,107 | $8,247,694 | +13% | FDOT |
| T1896 | SR 45 (US 1) FROM N OF SR 55 (US 19) TO N OF 69TH ST E | District 1 | 3 | Preferred Materials Inc. | $6,049,917 | $6,457,275 | +7.0% | FDOT |
| T6611 | SR 5 (US 1/BISCAYNE BLVD) FROM NE 61 ST TO NE 6 AVE | District 6 | 7 | General Asphalt Company, LLC | $5,969,145 | $6,349,722 | +6.0% | FDOT |
| T3948 | SR 61 (S MONRE ST) FROM PERKINS ST TO N OF JEFFERESON ST | District 3 | 2 | C.W. Roberts Contracting, Inc. | $3,748,499 | $5,702,042 | +52% | FDOT |
| T9047 | SR 8 (I-10) AT PENSACOLA WEIGH STATION | StateWide | 1 | E. B. Morris General Contractors, Inc. | $3,694,730 | FDOT | ||
| T6601 | SR 916 (NW 138 ST) FROM E OF NW 67 AVE TO NW 57 AVE | District 6 | 7 | Weekley Asphalt Paving, Inc. | $2,559,250 | $2,669,406 | +4.0% | FDOT |
| T3972 | SR 77 FROM S OF SR 273 TO JACKSON CO LINE | District 3 | 4 | Anderson Columbia Co., Inc. | $1,972,902 | $2,068,484 | +5.0% | FDOT |
| T5858 | SR 528, SR 404, SR 520 AND US 192 AT VARIOUS BRIDGES... | District 5 | 5 | Premier Paving, LLC | $948,635 | $1,711,328 | +80% | FDOT |
| T9042 | SR 47 (US 441) AT LAKE CITY WEIGH STATION | StateWide | 1 | E. B. Morris General Contractors, Inc. | $790,012 | FDOT | ||
| T7570 | SR 45 (US 41) AND SR 54 FROM GATOR LN TO SABAL PALM CT AND.. | District 7 | 5 | Alexander Design + Build, LLC | $643,597 | $664,210 | +3.0% | FDOT |
| T7573 | SR 595 (ALT US 19) AND SR 686 (ROOSEVELT BLVD) AT VARIOUS... | District 7 | 5 | Lakeview Contracting, Inc. | $365,071 | $409,334 | +12% | FDOT |
| T5849 | CR 484 FROM SW 20TH AVE TO CR 475A | District 5 | 1 | Cyclone Contracting Services, L | $149,200 | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.