FDOT contract T7570 bid tabulation
SR 45 (US 41) AND SR 54 FROM GATOR LN TO SABAL PALM CT AND.. Let by Florida DOT on March 26, 2025, Pasco, District 7. 5 bids received; low bid $643,597 by Alexander Design + Build, LLC.
- Owner
- Florida DOT
- Letting
- 26 MAR 2025
- Pay items
- 39
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Alexander Design + Build, LLC | $643,597 | Low |
| 2 | Lakeview Contracting, Inc. | $664,210 | +3.0% |
| 3 | Yoroca Engineering Contractors, LLC | $731,313 | +14% |
| 4 | Blacktip Services Incorporated | $765,432 | +19% |
| 5 | Rogar Management & Consulting of Florida LLC | $788,319 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alexander Design + Build, LLC | 2. Lakeview Contracting, Inc. | 3. Yoroca Engineering Contractors, LLC | 4. Blacktip Services Incorporated | 5. Rogar Management & Consulting of Florida LLC |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $145,770 | $60,000 | $80,000 | $169,650 | $100,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $22,874 | $49,000 | $26,101 | $4,400.00 | $75,000 |
| 0015 | Work zone sign (0102-60) | ED | 2,790 | $0.01 | $0.44 | $0.28 | $0.40 | $1.00 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 9,000 | $0.01 | $0.17 | $0.15 | $0.20 | $0.20 |
| 0025 | Arrow board / advance warning arrow panel (0102-76) | ED | 180 | $0.01 | $19.00 | $10.00 | $7.00 | $10.00 |
| 0030 | Portable changeable message sign, temporary (0102-99) | ED | 180 | $0.01 | $17.91 | $15.00 | $14.00 | $15.00 |
| 0035 | Type III barricade (0102-115) | ED | 180 | $0.01 | $3.90 | $0.38 | $0.75 | $1.00 |
| 0040 | Sediment barrier (0104-10-3) | LF | 784 | $5.20 | $5.00 | $10.00 | $4.00 | $2.00 |
| 0045 | Soil tracking prevention device (0104-15) | EACH | 2 | $5,850.00 | $2,500.00 | $4,000.00 | $1,200.00 | $100.00 |
| 0050 | Inlet protection system (0104-18) | EACH | 5 | $286.00 | $225.00 | $600.00 | $55.00 | $100.00 |
| 0055 | Litter removal (0107-1) | ACRE | 15.81 | $195.00 | $70.00 | $1.00 | $55.00 | $10.00 |
| 0060 | Mowing (0107-2) | ACRE | 12.46 | $195.00 | $95.00 | $1.00 | $55.00 | $10.00 |
| 0065 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $16,250 | $21,300 | $64,339 | $99,494 | $45,000 |
| 0070 | Removal of existing concrete (0110-4-10) | SY | 19 | $71.50 | $190.00 | $100.00 | $50.00 | $100.00 |
| 0075 | Regular excavation (0120-1) | CY | 224.80 | $8.78 | $35.00 | $60.00 | $50.00 | $24.00 |
| 0080 | Embankment (0120-6) | CY | 1,140.60 | $19.50 | $29.00 | $60.00 | $25.00 | $27.00 |
| 0082 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $6,500.00 | $13,000 | $15,000 | $8,000.00 | $15,000 |
| 0085 | Inlets, DT bot, type E, J bot, <10' (0425-1553) | EACH | 1 | $15,600 | $16,000 | $15,000 | $21,000 | $17,000 |
| 0090 | Manhole, adjust (0425-5) | EACH | 1 | $2,600.00 | $2,500.00 | $1,000.00 | $600.00 | $1,500.00 |
| 0092 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 23 | $123.50 | $180.00 | $200.00 | $500.00 | $400.00 |
| 0095 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 147 | $136.50 | $265.00 | $200.00 | $500.00 | $225.00 |
| 0100 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 38 | $299.00 | $380.00 | $350.00 | $700.00 | $400.00 |
| 0105 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 4 | $4,550.00 | $3,500.00 | $4,000.00 | $1,500.00 | $3,500.00 |
| 0110 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,285 | $75.40 | $86.00 | $84.00 | $57.00 | $100.00 |
| 0115 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 542 | $98.80 | $110.00 | $95.00 | $80.00 | $125.00 |
| 0120 | Detectable warnings (0527-2) | SF | 72 | $37.70 | $125.00 | $18.00 | $30.00 | $50.00 |
| 0125 | Performance turf, sod (0570-1-2) | SY | 5,742 | $4.55 | $5.50 | $6.00 | $7.00 | $8.00 |
| 0130 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $36,000 | $36,000 | $36,000 | $36,000 | $36,000 |
| 0135 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 1 | $1,274.00 | $800.00 | $1,000.00 | $672.00 | $400.00 |
| 0140 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 3 | $2,925.00 | $1,500.00 | $2,400.00 | $2,800.00 | $1,100.00 |
| 0145 | Single column ground sign assembly, relocate (0700-1500) | EACH | 3 | $585.00 | $1,200.00 | $500.00 | $336.00 | $100.00 |
| 0150 | Single column ground sign assembly, remove (0700-1600) | EACH | 3 | $130.00 | $500.00 | $50.00 | $112.00 | $100.00 |
| 0155 | Raised pavement marker, type B (0706-1-3) | EACH | 4 | $32.50 | $25.00 | $7.00 | $12.00 | $10.00 |
| 0160 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 661 | $6.50 | $7.20 | $10.00 | $8.00 | $6.00 |
| 0165 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 34 | $32.50 | $10.00 | $10.00 | $14.00 | $10.00 |
| 0170 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 500 | $28.60 | $20.00 | $23.00 | $20.00 | $24.00 |
| 0175 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 130 | $32.50 | $21.00 | $40.00 | $45.00 | $25.00 |
| 0180 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 200 | $26.00 | $13.35 | $40.00 | $28.00 | $15.00 |
| 0185 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.02 | $52,000 | $9,000.00 | $25,000 | $7,840.00 | $250,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 26, 2025. Compiled by Mirage Metrics.