Blacktip Services Incorporated: FDOT bid record
Blacktip Services Incorporated submitted 67 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 OCT 2026, and was the low bidder on 19 of them (28%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $29,278,449
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 8 | 5 | 63% |
| 2019 | 6 | 0 | 0% |
| 2020 | 4 | 2 | 50% |
| 2021 | 3 | 1 | 33% |
| 2022 | 2 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 7 | 4 | 57% |
| 2025 | 10 | 2 | 20% |
| 2026 | 24 | 4 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 33 | 11 | 33% |
| District 1 | 23 | 6 | 26% |
| District 5 | 7 | 1 | 14% |
| District 2 | 2 | 1 | 50% |
| District 3 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection system | 0104-18 | EACH | 52 | 50 (96%) | $50.00 | $150.00 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 52 | 34 (65%) | $80.00 | $86.00 |
| Mowing | 0107-2 | ACRE | 48 | 29 (60%) | $57.50 | $80.65 |
| Litter removal | 0107-1 | ACRE | 50 | 28 (56%) | $55.00 | $52.98 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 61 | 27 (44%) | $18.00 | $16.54 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 54 | 25 (46%) | $36.38 | $30.82 |
| Embankment | 0120-6 | CY | 44 | 25 (57%) | $22.00 | $30.04 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 42 | 21 (50%) | $47.50 | $42.32 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 58 | 19 (33%) | $1,631.50 | $1,150.00 |
| Performance turf, sod | 0570-1-2 | SY | 56 | 18 (32%) | $7.00 | $5.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 54 | 15 (28%) | $12.00 | $12.00 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 33 | 15 (45%) | $65.00 | $65.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ajax Paving Industries of Florida LLC | 30 | 5 of 30 |
| Preferred Materials Inc. | 23 | 8 of 23 |
| American Design Engineering Construction Inc. | 14 | 6 of 14 |
| Burgess Civil, LLC | 12 | 3 of 12 |
| Yoroca Engineering Contractors, LLC | 10 | 6 of 10 |
| C.W. Roberts Contracting, Inc. | 9 | 5 of 9 |
| Rogar Management & Consulting of Florida LLC | 8 | 1 of 8 |
| Cone & Graham, Inc. | 6 | 1 of 6 |
| American Lighting and Signalization, LLC. | 6 | 1 of 6 |
| Hubbard Construction Company | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T5894 | District 5 | SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD | 5 of 5 | $3,183,921 | +28% |
| 28 OCT 2026 | T7616 | District 7 | SR 55 (US 19) FROM S OF TUDOR LN TO N OF TUDOR LN | 3 of 5 | $1,019,891 | +15% |
| 30 SEP 2026 | T1943 | District 1 | SR 776 AT OCEANSPRAY BLVD | 4 of 5 | $1,380,431 | +42% |
| 30 SEP 2026 | T7622 | District 7 | SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM | 1 of 9 | $591,529 | Low, 0.0% under the second |
| 26 AUG 2026 | T1948 | District 1 | AT CENTRAL ELEMENTARY | 8 of 10 | $1,268,045 | +73% |
| 26 AUG 2026 | T7604 | District 7 | MIDDLE SCHOOL SIDEWALKS AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 3 of 9 | $1,828,516 | +18% |
| 26 AUG 2026 | T7605 | District 7 | SR 45 (US 41 / S FLORIDA AVE) FROM CR 480 TO E TOWER TR | 10 of 12 | $1,512,151 | +69% |
| 26 AUG 2026 | T7613 | District 7 | SR 55 (US 19 / COMMERCIAL WAY) FROM APPLEGATE DR TO E TRENTON AVE | 3 of 10 | $1,330,943 | +32% |
| 26 AUG 2026 | T7624 | District 7 | SR 93 (I-275), SR 690 AND SR 686 FROM SR 686 TO OLD TAMPA BAY, FROM SR 694 TO | 6 of 7 | $1,253,864 | +205% |
| 29 JUL 2026 | T7619 | District 7 | MULTIUSE TRAIL AT SR 60 (W COURTNEY CAMPBELL CAUSEWAY) | 4 of 6 | $2,444,954 | +51% |
| 20 MAY 2026 | T7576 | District 7 | FOREST RIDGE BLVD FROM W LAKE BEVERLY DR TO W COLBERT CT | 2 of 3 | $3,236,740 | +9.0% |
| 20 MAY 2026 | T7595 | District 7 | SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO | 4 of 8 | $13,429,834 | +5.0% |
| 20 MAY 2026 | T7607 | District 7 | SR 93 (I-75) AT CR 54 | 1 of 6 | $1,685,246 | Low, 2.0% under the second |
| 20 MAY 2026 | T7609 | District 7 | SR 685 | 1 of 4 | $414,615 | Low, 10% under the second |
| 29 APR 2026 | T3997 | District 3 | SR 10 (US 90 / W TENNESSEE ST) FROM CALLARK ST TO W BREVARD | 4 of 4 | $1,688,759 | +75% |
| 29 APR 2026 | T7611 | District 7 | SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST | 5 of 9 | $12,269,865 | +19% |
| 29 APR 2026 | T7615 | District 7 | SR 595 (651 / ALT US 19 / N MISSOURI AVE) AT ROSERY RD | 3 of 4 | $1,051,075 | +14% |
| 25 MAR 2026 | T1928 | District 1 | SR 544 FROM LAKE BLUE DR TO 26TH ST NW | 2 of 10 | $1,268,638 | +6.0% |
| 25 MAR 2026 | T1932 | District 1 | SR 82 AT ALABAMA RD | 1 of 4 | $1,867,531 | Low, 22% under the second |
| 25 MAR 2026 | T1934 | District 1 | SR 45 (US 41) AT MIDWAY BLVD | 3 of 4 | $1,867,531 | +9.0% |
| 25 MAR 2026 | T5878 | District 5 | SR 438 AT HASTINGS ST / SHERINGHAM RD INTERSECTION | 3 of 3 | $1,143,617 | +10% |
| 25 FEB 2026 | T5868 | District 5 | SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR | 5 of 11 | $229,722 | +54% |
| 28 JAN 2026 | T7579 | District 7 | SR 600 (US 92 / HILLSBOROUGH AVE) FROM W OF N 39TH ST TO... | 2 of 6 | $1,774,727 | +8.0% |
| 28 JAN 2026 | T7580 | District 7 | SR 574 (W REYNOLDS ST) FROM E OF SR 39 TO W OF US 92 | 4 of 4 | $1,834,535 | +127% |
| 24 SEP 2025 | T7566 | District 7 | SR 595 (ALT US 19 / BAYSHORE DR) FROM WILSON ST TO CURLEW ST | 3 of 6 | $1,399,047 | +10% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.