FDOT contract T7576 bid tabulation
FOREST RIDGE BLVD FROM W LAKE BEVERLY DR TO W COLBERT CT. Let by Florida DOT on May 20, 2026, Citrus, District 7. 3 bids received; low bid $2,959,906 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 81
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $2,959,906 | Low |
| 2 | Blacktip Services Incorporated | $3,236,740 | +9.0% |
| 3 | Superior Asphalt, Inc. | $4,027,001 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Blacktip Services Incorporated | 3. Superior Asphalt, Inc. |
|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $295,000 | $144,736 | $403,670 |
| 0010 | Mobilization (0101-1) | LS | 1 | $136,300 | $144,736 | $403,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $99,500 | $37,500 | $93,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $3,860.00 | $39,600 | $93,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $2,681.00 | $6,500.00 | $7,000.00 |
| 0030 | Work zone sign (0102-60) | ED | 11,937 | $0.23 | $0.23 | $0.26 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 4,095 | $41.00 | $81.00 | $46.49 |
| 0040 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 45 | $22.00 | $86.40 | $24.47 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 23,246 | $0.11 | $0.10 | $0.12 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 7,653 | $0.05 | $0.07 | $0.06 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 269 | $5.42 | $5.40 | $6.12 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 536 | $13.00 | $10.80 | $14.68 |
| 0065 | Type III barricade (0102-115) | ED | 84 | $0.38 | $0.39 | $0.43 |
| 0070 | Sediment barrier (0104-10-3) | LF | 1,399 | $4.21 | $4.00 | $1.53 |
| 0075 | Floating turbidity barrier (0104-11) | LF | 133 | $16.92 | $20.00 | $21.41 |
| 0080 | Soil tracking prevention device (0104-15) | EACH | 1 | $3,700.00 | $500.00 | $3,976.57 |
| 0085 | Inlet protection system (0104-18) | EACH | 19 | $215.00 | $50.00 | $152.95 |
| 0090 | Litter removal (0107-1) | ACRE | 41.16 | $270.00 | $50.00 | $244.71 |
| 0095 | Mowing (0107-2) | ACRE | 41.16 | $215.00 | $50.00 | $520.02 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $100,000 | $400,000 | $19,500 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 194 | $55.50 | $70.00 | $48.45 |
| 0110 | Tree root and branch pruning (0110-22) | EACH | 1 | $2,690.94 | $1,850.00 | $1,200.00 |
| 0115 | Regular excavation (0120-1) | CY | 642.90 | $43.67 | $80.00 | $86.50 |
| 0120 | Embankment (0120-6) | CY | 623 | $61.81 | $30.00 | $155.50 |
| 0125 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 25,861 | $2.25 | $2.97 | $4.13 |
| 0130 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 2,133.50 | $166.00 | $208.17 | $218.82 |
| 0135 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 13 | $4,787.00 | $6,500.00 | $9,850.00 |
| 0140 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 2 | $6,032.00 | $6,500.00 | $11,700 |
| 0145 | Inlets, closed flume (0425-1910) | EACH | 13 | $4,153.00 | $3,500.00 | $9,850.00 |
| 0150 | Manholes, P-7, <10' (0425-2-41) | EACH | 4 | $9,900.00 | $7,500.00 | $11,500 |
| 0155 | Manholes, P-8, <10' (0425-2-61) | EACH | 2 | $8,742.00 | $7,500.00 | $11,500 |
| 0160 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 1,312 | $94.00 | $143.00 | $135.00 |
| 0165 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 251 | $127.00 | $143.00 | $200.00 |
| 0170 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 8 | $923.00 | $143.00 | $1,050.00 |
| 0175 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 59 | $236.00 | $143.00 | $375.00 |
| 0180 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $3,636.00 | $1,300.00 | $8,800.00 |
| 0185 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 1 | $4,085.00 | $1,300.00 | $9,000.00 |
| 0190 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 2,550 | $70.00 | $70.76 | $68.52 |
| 0195 | Concrete curb & gutter, type F (0520-1-10) | LF | 3,954 | $41.00 | $37.78 | $60.29 |
| 0200 | Concrete curb, type D (0520-2-4) | LF | 215 | $60.00 | $37.78 | $74.09 |
| 0205 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 2,706 | $67.00 | $75.00 | $52.00 |
| 0210 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 132 | $128.00 | $75.00 | $90.00 |
| 0215 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 1,403 | $120.00 | $65.00 | $71.55 |
| 0220 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 369 | $121.00 | $105.00 | $75.15 |
| 0225 | Detectable warnings (0527-2) | SF | 76 | $30.00 | $35.00 | $52.00 |
| 0230 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 39.10 | $362.00 | $185.00 | $325.00 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 6,370 | $6.84 | $5.00 | $4.82 |
| 0240 | Raised pavement marker, type B (0706-1-3) | EACH | 148 | $5.42 | $6.48 | $7.34 |
| 0245 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.88 | $3,249.80 | $2,160.00 | $2,447.12 |
| 0250 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $20,000 | $20,000 | $20,000 |
| 0255 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $30,000 | $30,000 | $30,000 |
| 0260 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $2,540.00 | $2,540.00 | $2,540.00 |
| 0265 | Single column ground sign assembly, relocate (0700-1500) | EACH | 7 | $108.33 | $243.00 | $275.30 |
| 0270 | Object marker, type 2 (0705-10-2) | EACH | 34 | $102.91 | $216.00 | $244.71 |
| 0275 | Delineator, non-flexible (0705-11-2) | EACH | 16 | $81.25 | $108.00 | $122.36 |
| 0280 | Raised pavement marker, type B (0706-1-3) | EACH | 652 | $5.42 | $6.48 | $7.34 |
| 0285 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 107 | $5.42 | $10.80 | $12.24 |
| 0290 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,323.46 | $4,320.00 | $4,894.25 |
| 0295 | Painted pavement markings, surface (0710-90) | LS | 1 | $8,616.29 | $4,320.00 | $4,894.25 |
| 0300 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 365 | $3.68 | $5.40 | $6.12 |
| 0305 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 82 | $7.37 | $10.80 | $12.24 |
| 0310 | Thermoplastic, standard, arrow (0711-11170) | EACH | 9 | $62.83 | $81.00 | $91.77 |
| 0315 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.31 | $1,927.13 | $4,320.00 | $4,894.25 |
| 0320 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 201 | $18.85 | $16.20 | $18.35 |
| 0325 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.76 | $5,588.71 | $7,128.00 | $8,075.51 |
| 0330 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.75 | $1,394.77 | $2,160.00 | $2,447.12 |
| 0335 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.45 | $4,948.78 | $7,128.00 | $8,075.51 |
| 0340 | Manhole, adjust, utilities (0425-5-1) | EACH | 13 | $511.51 | $1,750.00 | $4,500.00 |
| 0345 | Valve boxes, adjust (0425-6) | EACH | 8 | $199.77 | $800.00 | $2,500.00 |
| 0350 | Utility pipe,remove & dispose, 5- 7.9" (1050-16003) | LF | 23 | $80.68 | $32.40 | $230.00 |
| 0355 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 40 | $46.47 | $32.40 | $460.00 |
| 0360 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 60 | $163.93 | $87.00 | $225.00 |
| 0365 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 12" (1050-31212) | LF | 70 | $294.93 | $87.00 | $440.00 |
| 0370 | Utility fittings for PVC pipe, furnish and install, elbow, 12" (1055-31112) | EACH | 16 | $2,903.88 | $486.00 | $2,400.00 |
| 0375 | Utility fittings for PVC pipe, furnish and install, cap/plug, (1055-31512) | EACH | 4 | $3,614.70 | $972.00 | $2,200.00 |
| 0380 | Utility fixture, valve/meter box, furnish & install, 12" (1080-21112) | EACH | 4 | $372.57 | $540.00 | $795.00 |
| 0385 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 4 | $12,347 | $13,500 | $10,200 |
| 0390 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 4 | $5,877.11 | $8,424.00 | $20,200 |
| 0395 | Utility fixture- line stop assembly, furnish and install, (1080-27112) | EACH | 4 | $28,261 | $16,200 | $36,800 |
| 0400 | Utility fixture, mechanical joint restraint, furnish & install, 6" (1080-29106) | EACH | 14 | $182.38 | $130.00 | $575.00 |
| 0405 | Utility fixture, mechanical joint restraint, furnish & install, 12" (1080-29112) | EACH | 56 | $346.30 | $411.00 | $750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.