C.W. Roberts Contracting, Inc. submitted 386 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 121 of them (31%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $1,017,479,662
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 25 | 7 | 28% |
| 2019 | 19 | 4 | 21% |
| 2020 | 35 | 11 | 31% |
| 2021 | 44 | 11 | 25% |
| 2022 | 40 | 15 | 38% |
| 2023 | 46 | 17 | 37% |
| 2024 | 57 | 23 | 40% |
| 2025 | 52 | 18 | 35% |
| 2026 | 68 | 15 | 22% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 181 | 69 | 38% |
| District 1 | 61 | 15 | 25% |
| District 7 | 53 | 14 | 26% |
| District 5 | 47 | 16 | 34% |
| District 4 | 31 | 5 | 16% |
| District 2 | 13 | 2 | 15% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 370 | 143 (39%) | $0.12 | $0.13 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 476 | 142 (30%) | $5.00 | $5.00 |
| Work zone sign | 0102-60 | ED | 371 | 119 (32%) | $0.26 | $0.25 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 423 | 113 (27%) | $1,400.00 | $1,150.00 |
| Traffic control officer | 0102-14 | HR | 273 | 110 (40%) | $87.25 | $80.00 |
| Mowing | 0107-2 | ACRE | 351 | 98 (28%) | $78.91 | $80.65 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 385 | 96 (25%) | $35.35 | $30.82 |
| Portable changeable message sign, temporary | 0102-99 | ED | 367 | 93 (25%) | $12.45 | $12.00 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 324 | 91 (28%) | $7.00 | $6.09 |
| Inlet protection system | 0104-18 | EACH | 332 | 89 (27%) | $182.83 | $150.00 |
| Litter removal | 0107-1 | ACRE | 352 | 88 (25%) | $55.00 | $52.98 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 191 | 88 (46%) | $0.09 | $0.07 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anderson Columbia Co., Inc. | 133 | 86 of 133 |
| Ajax Paving Industries of Florida LLC | 101 | 33 of 101 |
| Preferred Materials Inc. | 73 | 37 of 73 |
| Ranger Construction Industries, Inc. | 73 | 31 of 73 |
| Hubbard Construction Company | 67 | 36 of 67 |
| Capital Asphalt Inc | 42 | 4 of 42 |
| Peavy & Son Construction Co., Inc. | 36 | 13 of 36 |
| Roads, Inc. of NWF | 35 | 16 of 35 |
| Watson Civil Construction, Inc. | 34 | 11 of 34 |
| Panhandle Grading & Paving, Inc. | 34 | 8 of 34 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1937 | District 1 | 44620415201 | 4 of 4 | $25,776,312 | +17% |
| 28 OCT 2026 | T1947 | District 1 | 43975025201 | 2 of 4 | $16,983,941 | +3.0% |
| 28 OCT 2026 | T2A73 | District 2 | SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE | 1 of 8 | $16,278,101 | Low, 0.0% under the second |
| 28 OCT 2026 | T2A84 | District 2 | SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA | 5 of 7 | $10,647,468 | +15% |
| 28 OCT 2026 | T2A86 | District 2 | SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT | 5 of 8 | $10,440,721 | +24% |
| 28 OCT 2026 | T3A08 | District 3 | SR 2 FROM SPRING BRANCH TO E OF COWARTS CREEK BRIDGE | 4 of 5 | $2,266,595 | +37% |
| 28 OCT 2026 | T3A21 | District 3 | SR 75 (US 231) FROM S OF SR 20 TO JACKSON COUNTY LINE | 2 of 3 | $11,480,349 | +12% |
| 28 OCT 2026 | T3A25 | District 3 | SR 8 (I-10) FROM MILLER BLUFF RD TO OKALOOSA COUNTY LINE | 2 of 3 | $15,415,357 | +8.0% |
| 28 OCT 2026 | T3A28 | District 3 | SR 295 (FAIRFIELD DR) FROM W OF SR 292 (N PACE BLVD) TO CSX RAILROAD | 1 of 3 | $1,497,551 | Low, 1.0% under the second |
| 28 OCT 2026 | T7591 | District 7 | SR 600 (US 92) FROM EUREKA SPRINGS RD TO THONOTOSASSA RD | 4 of 5 | $18,766,201 | +12% |
| 30 SEP 2026 | T2A80 | District 2 | SR 55 (US 19) FROM N OF SR 121 TO S OF OTTER CREEK AND AT BULLFROG | 2 of 3 | $20,611,913 | +8.0% |
| 30 SEP 2026 | T3A23 | District 3 | SR 75 (US 231) FROM S OF SR 10 (US 90) TO END OF CURB AND GUTTER | 3 of 3 | $2,338,118 | +18% |
| 30 SEP 2026 | T3A26 | District 3 | SR 10 (US 90 / MAHAN DR) FROM CR 0353 (DEMPSEY MAYO RD) TO APEX DR | 1 of 4 | $5,743,903 | Low, 1.0% under the second |
| 30 SEP 2026 | T3A46 | District 3 | SR 61 (THOMSVILLE HWY) FROM N OF SR 63 (US 27 / MONROE ST) TO N OF 9TH | 2 of 3 | $2,245,879 | +2.0% |
| 30 SEP 2026 | T5893 | District 5 | SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 600 | 6 of 8 | $7,068,139 | +25% |
| 26 AUG 2026 | T1940 | District 1 | SR 25 (US 27) FROM SANTA MARIA WAY TO LAKE ISIS AVE | 2 of 4 | $18,268,520 | +6.0% |
| 26 AUG 2026 | T1945 | District 1 | SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF | 4 of 5 | $19,220,112 | +23% |
| 26 AUG 2026 | T3947 | District 3 | SR 30 (US 98) AT PALMS ST INTERSECTION | 2 of 3 | $1,433,415 | +4.0% |
| 26 AUG 2026 | T3998 | District 3 | SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO | 2 of 3 | $5,179,330 | +10% |
| 26 AUG 2026 | T3A32 | District 3 | SR 10 (US 90) FROM END OF 4 LANE IN GRAND RIDGE TO APALACHICOLA RIVER | 3 of 5 | $5,361,639 | +12% |
| 26 AUG 2026 | T4764 | District 4 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | 4 of 9 | $2,721,084 | +19% |
| 26 AUG 2026 | T7614 | District 7 | SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD | 4 of 6 | $5,678,952 | +3.0% |
| 29 JUL 2026 | T1939 | District 1 | SR 25 (US 27) FROM S OF WAYMAN RD TO N OF FISH EATING CREEK | 2 of 4 | $18,356,004 | +1.0% |
| 29 JUL 2026 | T1942 | District 1 | SR 64 FROM W OF CR 675 TO WINGATE RD | 1 of 4 | $8,312,077 | Low, 20% under the second |
| 29 JUL 2026 | T3920 | District 3 | CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 524178 | 1 of 6 | $962,893 | Low, 0.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.