FDOT contract T1947 bid tabulation
43975025201. Let by Florida DOT on October 28, 2026, Highlands, District 1. 4 bids received; low bid $16,495,027 by Ajax Paving Industries of Florida LLC.
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 173
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ajax Paving Industries of Florida LLC | $16,495,027 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $16,983,941 | +3.0% |
| 3 | Webber, LLC | $16,988,000 | +3.0% |
| 4 | Gosalia Concrete Constructors, Inc. | $18,760,314 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ajax Paving Industries of Florida LLC | 2. C.W. Roberts Contracting, Inc. | 3. Webber, LLC | 4. Gosalia Concrete Constructors, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $350,000 | $75,000 | $800,000 | $450,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $847,600 | $1,262,000 | $800,000 | $720,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $200,180 | $92,000 | $750,000 | $250,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $519,880 | $205,000 | $750,000 | $400,000 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $350,040 | $434,000 | $347,786 | $600,000 |
| 0030 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $275,890 | $496,000 | $171,506 | $600,000 |
| 0035 | Traffic control officer (0102-14) | HR | 304 | $105.00 | $114.50 | $80.00 | $95.00 |
| 0040 | Work zone sign (0102-60) | ED | 67,717 | $0.20 | $0.20 | $0.18 | $0.22 |
| 0045 | Business sign (0102-61) | EACH | 10 | $44.14 | $45.75 | $40.00 | $42.00 |
| 0050 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 4,284 | $44.14 | $40.65 | $40.00 | $40.00 |
| 0055 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 9,743 | $11.04 | $21.00 | $10.00 | $1.00 |
| 0060 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 176,298 | $0.10 | $0.10 | $0.09 | $0.11 |
| 0065 | Temporary separator, F&I remove (0102-75-1) | LF | 4,665 | $20.97 | $21.75 | $19.00 | $30.00 |
| 0070 | Arrow board / advance warning arrow panel (0102-76) | ED | 575 | $5.52 | $5.75 | $5.00 | $6.00 |
| 0075 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 11,416 | $4.41 | $4.65 | $4.00 | $4.00 |
| 0080 | Portable changeable message sign, temporary (0102-99) | ED | 2,377 | $11.04 | $11.50 | $10.00 | $11.00 |
| 0085 | Temporary signalization and maintenance, intersection (0102-104) | ED | 850 | $34.21 | $10.50 | $50.10 | $31.00 |
| 0090 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 850 | $1.10 | $12.75 | $36.80 | $1.00 |
| 0095 | Type III barricade (0102-115) | ED | 6,838 | $0.25 | $0.25 | $0.23 | $0.30 |
| 0100 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 75 | $27.59 | $74.50 | $65.00 | $35.00 |
| 0105 | Removable tape, white, solid 6" (0102-913-21) | GM | 3.95 | $11,588 | $12,000 | $10,497 | $10,497 |
| 0110 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 2.18 | $5,517.90 | $5,800.00 | $2,756.32 | $4,988.51 |
| 0115 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 184 | $11.04 | $11.60 | $13.00 | $10.00 |
| 0120 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 45 | $110.36 | $116.00 | $225.00 | $100.00 |
| 0125 | Removable tape, yellow, solid, (0102-913-31) | GM | 1.00 | $11,588 | $12,000 | $10,490 | $10,490 |
| 0130 | Sediment barrier (0104-10-3) | LF | 11,663 | $1.05 | $5.25 | $1.15 | $1.50 |
| 0135 | Soil tracking prevention device (0104-15) | EACH | 6 | $3,862.53 | $1,000.00 | $3,250.00 | $3,500.00 |
| 0140 | Inlet protection system (0104-18) | EACH | 7 | $193.13 | $567.00 | $125.00 | $150.00 |
| 0145 | Litter removal (0107-1) | ACRE | 764.26 | $70.00 | $86.00 | $35.00 | $35.00 |
| 0150 | Mowing (0107-2) | ACRE | 662.60 | $70.00 | $86.00 | $35.00 | $120.00 |
| 0155 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $5,517.90 | $3,320.00 | $10,350 | $10,350 |
| 0160 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $325,537 | $340,000 | $2,150,675 | $400,000 |
| 0165 | Removal of existing concrete (0110-4-10) | SY | 1,837 | $44.81 | $20.50 | $48.93 | $55.00 |
| 0170 | Regular excavation (0120-1) | CY | 1,177.90 | $26.21 | $61.25 | $20.48 | $75.00 |
| 0175 | Embankment (0120-6) | CY | 2,863.90 | $50.54 | $5.75 | $25.42 | $100.00 |
| 0180 | Type B stabilization (0160-4) | SY | 33,104 | $37.52 | $18.00 | $4.98 | $24.80 |
| 0185 | Optional base, base group 01 (0285-701) | SY | 1,898 | $44.36 | $24.85 | $18.45 | $51.40 |
| 0190 | Optional base, base group 02 (0285-702) | SY | 1,576 | $59.70 | $56.80 | $22.86 | $59.19 |
| 0195 | Optional base, base group 03 (0285-703) | SY | 23,348 | $34.31 | $43.50 | $36.80 | $37.00 |
| 0200 | Optional base, base group 09 (0285-709) | SY | 1,440 | $125.35 | $33.25 | $28.64 | $85.25 |
| 0205 | Optional base, base group 10 (0285-710) | SY | 177 | $220.41 | $70.25 | $116.58 | $274.59 |
| 0210 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 75,702 | $4.05 | $2.90 | $5.50 | $5.50 |
| 0215 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 763 | $14.44 | $16.00 | $14.40 | $14.40 |
| 0220 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 531 | $1.58 | $20.00 | $18.00 | $18.00 |
| 0225 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 35,016 | $2.80 | $1.65 | $2.75 | $2.75 |
| 0230 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 17,298 | $4.29 | $2.45 | $4.30 | $4.30 |
| 0235 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 8,543 | $155.00 | $176.50 | $157.00 | $157.00 |
| 0240 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 2,499.50 | $184.60 | $202.75 | $184.50 | $184.50 |
| 0245 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 814.30 | $296.00 | $318.50 | $315.50 | $315.50 |
| 0250 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 9,265.10 | $186.00 | $185.75 | $190.00 | $190.00 |
| 0255 | Plain cement concrete 9" (0350-3-7) | SY | 23,009 | $123.60 | $129.50 | $84.59 | $190.00 |
| 0260 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 29,925 | $4.41 | $4.50 | $3.36 | $4.90 |
| 0265 | Grinding concrete pavement (0352-70) | SY | 23,009 | $4.36 | $9.50 | $4.58 | $4.58 |
| 0270 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 2 | $7,119.25 | $5,200.00 | $6,213.49 | $17,293 |
| 0275 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 1 | $13,025 | $6,000.00 | $7,102.47 | $17,484 |
| 0280 | Replace grate (0425-82) | EACH | 2 | $2,098.47 | $4,000.00 | $1,513.94 | $1,900.92 |
| 0285 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 293 | $122.21 | $140.00 | $128.86 | $236.99 |
| 0290 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 84 | $242.85 | $220.00 | $133.54 | $282.16 |
| 0295 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 4 | $949.12 | $880.00 | $1,295.31 | $936.48 |
| 0300 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 8 | $518.03 | $895.00 | $830.49 | $489.78 |
| 0305 | Pipe culvert,optional material,other-elip/arch, (0430-175215) | LF | 162 | $142.63 | $168.50 | $174.65 | $240.43 |
| 0310 | Mitered end section, optional round, 15" CD (0430-982123) | EACH | 1 | $2,486.95 | $3,500.00 | $5,316.18 | $5,631.85 |
| 0315 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 2 | $2,619.81 | $3,600.00 | $5,316.31 | $5,748.42 |
| 0320 | Mitered end section, optional - elliptical / arch, 15" CD (0430-982623) | EACH | 1 | $2,540.09 | $3,500.00 | $6,240.78 | $5,665.02 |
| 0325 | Mitered end section, optional round, 15" SD (0430-984123) | EACH | 6 | $2,976.46 | $3,500.00 | $5,793.90 | $5,635.79 |
| 0330 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 1 | $2,858.92 | $3,900.00 | $6,240.78 | $8,473.43 |
| 0335 | Edgedrain draincrete, (0446-1-1) | LF | 3,202 | $52.37 | $142.00 | $35.53 | $110.00 |
| 0340 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 159 | $37.52 | $127.00 | $35.53 | $309.61 |
| 0345 | Concrete curb & gutter, type F (0520-1-10) | LF | 5,646 | $33.14 | $56.75 | $37.00 | $55.00 |
| 0350 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 122 | $67.48 | $130.00 | $85.00 | $105.51 |
| 0355 | Detectable warnings (0527-2) | SF | 16 | $43.59 | $57.25 | $27.10 | $71.14 |
| 0360 | Performance turf, sod (0570-1-2) | SY | 41,848 | $3.40 | $6.50 | $4.80 | $3.00 |
| 0365 | Shoulder drop off soil (0570-13-1) | CY | 2,286 | $55.68 | $48.65 | $21.39 | $40.00 |
| 0370 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 19.38 | $1,489.83 | $1,600.00 | $1,790.00 | $1,349.72 |
| 0375 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.62 | $1,655.37 | $1,750.00 | $2,250.00 | $1,492.78 |
| 0380 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 462 | $1.10 | $1.15 | $1.25 | $1.00 |
| 0385 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,580 | $1.38 | $1.50 | $1.35 | $1.25 |
| 0390 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,092 | $1.66 | $1.75 | $1.45 | $1.50 |
| 0395 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 3.17 | $772.51 | $820.00 | $485.00 | $699.34 |
| 0400 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.67 | $772.51 | $820.00 | $580.00 | $698.74 |
| 0405 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 49 | $77.25 | $82.00 | $40.00 | $70.00 |
| 0410 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 316 | $33.11 | $35.00 | $35.00 | $30.00 |
| 0415 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 15.78 | $1,489.83 | $1,600.00 | $1,795.00 | $1,350.00 |
| 0420 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,544 | $1.38 | $1.50 | $1.35 | $1.25 |
| 0425 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 1.70 | $772.51 | $812.00 | $500.00 | $698.36 |
| 0430 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.66 | $772.51 | $804.00 | $600.00 | $691.49 |
| 0435 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0440 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $100,000 | $100,000 | $100,000 | $100,000 |
| 0445 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 14.09 | $2,179.04 | $2,200.00 | $1,400.00 | $1,350.29 |
| 0450 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 16 | $595.93 | $630.00 | $590.00 | $540.00 |
| 0455 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 20 | $2,207.16 | $2,300.00 | $1,850.00 | $2,000.00 |
| 0460 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $2,427.88 | $2,500.00 | $2,400.00 | $2,200.00 |
| 0465 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $551.79 | $590.00 | $350.00 | $500.00 |
| 0470 | Single column ground sign assembly, remove (0700-1600) | EACH | 32 | $22.07 | $24.00 | $50.00 | $20.00 |
| 0475 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 2 | $9,601.14 | $10,000 | $6,500.00 | $8,700.00 |
| 0480 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 3 | $10,043 | $11,000 | $7,500.00 | $9,100.00 |
| 0485 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $11,036 | $11,600 | $10,000 | $10,000 |
| 0490 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 7 | $1,655.37 | $1,750.00 | $1,200.00 | $1,500.00 |
| 0495 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 2 | $220.72 | $230.00 | $78.00 | $200.00 |
| 0500 | Profiled thermoplastic,standard- concrete surfaces, white, solid,6" (0701-17101) | GM | 0.12 | $13,243 | $13,900 | $12,000 | $11,901 |
| 0505 | Delineator, non-flexible (0705-11-2) | EACH | 28 | $110.36 | $116.25 | $90.00 | $100.00 |
| 0510 | Raised pavement marker, type B (0706-1-3) | EACH | 2,715 | $4.41 | $4.50 | $4.00 | $4.00 |
| 0515 | Painted pavement markings, surface (0710-90) | LS | 1 | $34,763 | $36,000 | $80,000 | $31,500 |
| 0520 | Painted pavement markings, surface (0710-90) | LS | 1 | $11,588 | $12,200 | $25,000 | $10,500 |
| 0525 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.04 | $7,173.27 | $7,600.00 | $6,300.00 | $6,500.00 |
| 0530 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 901 | $5.52 | $5.85 | $5.00 | $5.00 |
| 0535 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 442 | $6.62 | $7.00 | $7.00 | $6.00 |
| 0540 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.22 | $3,310.74 | $3,400.00 | $2,000.00 | $2,889.91 |
| 0545 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 9 | $248.31 | $260.00 | $150.00 | $225.00 |
| 0550 | Thermoplastic, standard, arrow (0711-11170) | EACH | 65 | $88.29 | $93.00 | $55.00 | $80.00 |
| 0555 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 2,022 | $5.52 | $6.00 | $5.00 | $5.00 |
| 0560 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.37 | $3,310.74 | $3,400.00 | $2,000.00 | $2,926.83 |
| 0565 | Thermoplastic, refurbishment, white, solid, 6" (0711-12101) | GM | 0.02 | $3,310.74 | $235.00 | $4,000.00 | $2,000.00 |
| 0570 | Thermoplastic, refurbishment, white, solid, 24" for stop line or crosswalk (0711-12125) | LF | 50 | $4.41 | $4.65 | $5.00 | $4.00 |
| 0575 | Thermoplastic, refurbishment, yellow, solid, 6" (0711-12201) | GM | 0.02 | $3,310.74 | $3,500.00 | $3,000.00 | $3,000.00 |
| 0580 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 462 | $11.04 | $11.50 | $8.00 | $10.00 |
| 0585 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.23 | $22,072 | $22,500 | $9,000.00 | $19,383 |
| 0590 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 20 | $882.86 | $930.00 | $600.00 | $800.00 |
| 0595 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 67 | $772.51 | $815.00 | $550.00 | $700.00 |
| 0600 | Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241) | GM | 0.10 | $22,072 | $22,500 | $8,500.00 | $19,417 |
| 0605 | Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341) | GM | 0.17 | $22,072 | $22,500 | $9,000.00 | $19,394 |
| 0610 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 153 | $27.59 | $29.00 | $20.00 | $25.00 |
| 0615 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.87 | $6,621.48 | $6,950.00 | $6,600.00 | $5,993.11 |
| 0620 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.19 | $7,173.27 | $7,550.00 | $8,800.00 | $6,500.00 |
| 0625 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 1.04 | $3,310.74 | $3,480.00 | $1,650.00 | $2,994.24 |
| 0630 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.64 | $6,621.48 | $6,900.00 | $5,900.00 | $5,952.76 |
| 0635 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 10.72 | $5,738.62 | $6,100.00 | $4,700.00 | $5,195.63 |
| 0640 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.12 | $6,180.05 | $6,500.00 | $6,250.00 | $5,600.00 |
| 0645 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 9.94 | $5,738.62 | $6,100.00 | $4,200.00 | $5,199.48 |
| 0650 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.70 | $2,758.95 | $2,900.00 | $1,000.00 | $2,494.13 |
| 0655 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 1.21 | $44,143 | $46,500 | $35,000 | $39,967 |
| 0660 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.93 | $11,036 | $11,500 | $8,500.00 | $9,967.85 |
| 0665 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.92 | $11,036 | $1,200.00 | $8,500.00 | $9,923.66 |
| 0670 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,615 | $15.45 | $9.75 | $20.00 | $14.00 |
| 0675 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 744 | $38.07 | $35.75 | $30.00 | $34.50 |
| 0680 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 32 | $2,601.14 | $1,000.00 | $1,350.00 | $2,357.00 |
| 0685 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $7,759.27 | $7,600.00 | $7,000.00 | $7,031.00 |
| 0690 | Electrical service wire, & install (0639-2-1) | LF | 81 | $10.54 | $6.75 | $12.00 | $9.55 |
| 0695 | Electrical service wire, (0639-2-6) | LF | 45 | $1.21 | $2.00 | $50.00 | $1.10 |
| 0700 | Electrical power service- contribution in aid of construction (ciac), duke (DO not bid) (0639-8100) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0705 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,055.81 | $2,670.00 | $3,500.00 | $2,769.00 |
| 0710 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $366.39 | $740.00 | $1,000.00 | $332.00 |
| 0715 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 15,641 | $3.20 | $3.25 | $3.90 | $2.90 |
| 0720 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 703 | $1.21 | $0.50 | $0.25 | $1.10 |
| 0725 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 4 | $1,863.95 | $2,500.00 | $1,750.00 | $1,689.00 |
| 0730 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 16 | $10,399 | $15,000 | $7,500.00 | $9,423.00 |
| 0735 | Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366) | EACH | 1 | $11,883 | $17,000 | $8,500.00 | $10,768 |
| 0740 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 17 | $2,543.75 | $740.00 | $850.00 | $2,305.00 |
| 0745 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 17 | $938.04 | $1,100.00 | $925.00 | $850.00 |
| 0750 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $1,989.75 | $9,100.00 | $3,200.00 | $1,803.00 |
| 0755 | Conduit, furnish & install, open trench (0630-2-11) | LF | 185 | $25.38 | $32.00 | $25.00 | $23.00 |
| 0760 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 470 | $113.67 | $92.00 | $50.00 | $103.00 |
| 0765 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $17,924 | $16,500 | $17,000 | $16,242 |
| 0770 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 10 | $1,472.18 | $1,260.00 | $1,500.00 | $1,334.00 |
| 0775 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $7,759.27 | $6,500.00 | $10,500 | $7,031.00 |
| 0780 | Electrical power service, remove overhead (0639-1610) | AS | 1 | $1,589.15 | $416.25 | $830.00 | $1,440.00 |
| 0785 | Electrical service wire, & install (0639-2-1) | LF | 95 | $9.10 | $126.00 | $12.00 | $8.25 |
| 0790 | Electrical service wire, (0639-2-6) | LF | 10 | $3.64 | $6.25 | $50.00 | $3.30 |
| 0795 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $7,078.36 | $2,150.00 | $3,500.00 | $6,414.00 |
| 0800 | Steel strain pole, remove, deep foundation removal, bolt on attachment (0649-1-65) | EACH | 2 | $28,201 | $14,600 | $20,000 | $25,554 |
| 0805 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 3 | $101,801 | $135,250 | $100,000 | $92,246 |
| 0810 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $109,411 | $137,000 | $110,000 | $99,142 |
| 0815 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 10 | $2,222.61 | $2,400.00 | $1,500.00 | $2,014.00 |
| 0820 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $3,152.93 | $4,100.00 | $2,500.00 | $2,857.00 |
| 0825 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $33,614 | $50,000 | $29,000 | $30,459 |
| 0830 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $6,757.22 | $8,500.00 | $6,000.00 | $6,123.00 |
| 0835 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 1 | $46,779 | $70,000 | $50,000 | $42,388 |
| 0840 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,787.80 | $625.00 | $1,000.00 | $1,620.00 |
| 0845 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $10,315 | $9,200.00 | $10,000 | $9,347.00 |
| 0850 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $5,164.75 | $4,300.00 | $5,500.00 | $4,680.00 |
| 0855 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $4,566.61 | $4,800.00 | $7,500.00 | $4,138.00 |
| 0860 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $11,761 | $15,800 | $15,000 | $10,657 |
| 0865 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $7,302.39 | $6,200.00 | $3,500.00 | $6,617.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.