Webber, LLC: FDOT bid record
Webber, LLC submitted 24 bids on Florida DOT contracts in the data, from 25 AUG 2021 to 28 OCT 2026, and was the low bidder on 6 of them (25%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $607,104,245
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 8 | 3 | 38% |
| 2024 | 4 | 1 | 25% |
| 2025 | 5 | 2 | 40% |
| 2026 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 7 | 2 | 29% |
| District 2 | 6 | 1 | 17% |
| District 4 | 4 | 1 | 25% |
| District 3 | 3 | 2 | 67% |
| District 5 | 2 | 0 | 0% |
| District 1 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 41 | 19 (46%) | $37.75 | $30.82 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 51 | 17 (33%) | $16.30 | $16.54 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 42 | 15 (36%) | $1,455.00 | $1,150.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 40 | 14 (35%) | $5.00 | $5.00 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 14 | 14 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 14 | 14 (100%) | $4,500.00 | $4,500.00 |
| Optional base, base group 01 | 0285-701 | SY | 14 | 13 (93%) | $10.95 | $24.00 |
| Electrical service wire, & install | 0639-2-1 | LF | 27 | 12 (44%) | $12.40 | $8.33 |
| Inlet protection system | 0104-18 | EACH | 24 | 12 (50%) | $144.97 | $150.00 |
| Type III barricade | 0102-115 | ED | 23 | 12 (52%) | $0.25 | $0.34 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 20 | 12 (60%) | $92.50 | $80.00 |
| Temporary barrier, F&I, low profile, concrete | 0102-71-13 | LF | 18 | 12 (67%) | $44.00 | $42.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Construction Company Southeast, LLC | 11 | 4 of 11 |
| Gosalia Concrete Constructors, Inc. | 9 | 7 of 9 |
| Prince Contracting, LLC. | 6 | 2 of 6 |
| Vecellio & Grogan, Inc. | 5 | 2 of 5 |
| De Moya Asphalt Joint Venture | 5 | 3 of 5 |
| Watson Civil Construction, Inc. | 5 | 1 of 5 |
| Orion Marine Construction, Inc. | 4 | 1 of 4 |
| Sema Construction, Inc. | 4 | 2 of 4 |
| De Moya Highway Infrastructure LLC | 4 | 2 of 4 |
| Ajax Paving Industries of Florida LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1947 | District 1 | 43975025201 | 3 of 4 | $16,988,000 | +3.0% |
| 29 JUL 2026 | T5883 | District 5 | SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.544 | 9 of 9 | $24,993,061 | +26% |
| 25 MAR 2026 | T1920 | District 1 | SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W | 2 of 6 | $125,214,101 | +2.0% |
| 25 MAR 2026 | T7586 | District 7 | SR 39 (JAMES L REDMAN PKWY) FROM S OF RAYBURN RD TO N OF... | 2 of 6 | $4,157,000 | +5.0% |
| 25 FEB 2026 | T2A37 | District 2 | SR 228 FROM HART BRIDGE TO BEACH BLVD | 3 of 5 | $19,248,697 | +12% |
| 03 DEC 2025 | T4729 | District 4 | SR A1A (JIMMY BUFFETT MEMORIAL HWY) OVER SEBASTIAN INLET | 1 of 8 | $101,965,262 | Low, 12% under the second |
| 24 SEP 2025 | T2A24 | District 2 | SR 23 (FIRST COAST XWAY) FROM SR 9 (I-95) TO E OF CR 2209 | 4 of 8 | $223,726,671 | +9.0% |
| 11 JUN 2025 | T7563 | District 7 | SR 39 (JAMES L REDMAN PKWY) AT TRAPNELL RD | 1 of 5 | $8,023,564 | Low, 4.0% under the second |
| 26 MAR 2025 | T7547 | District 7 | SR 595 (ALT US 19 / TYRONE BLVD) FROM 5TH AVE N TO PARK ST N | 3 of 3 | $15,487,770 | +37% |
| 29 JAN 2025 | T7558 | District 7 | SR 43 (US 301) AT SYMMES ROAD AND AT SHADY PRESERVE DR | 2 of 5 | $13,867,700 | +2.0% |
| 25 SEP 2024 | T2987 | District 2 | SR 23 (FIRST COAST XWAY) FROM E OF CR 2209 TO E OF CR 16A | 4 of 4 | $324,742,351 | +34% |
| 31 JUL 2024 | T2946 | District 2 | SR 9 (I-95) FROM FOREST ST BRIDGE TO RAILROAD BRIDGE AND... | 4 of 4 | $8,442,369 | +29% |
| 19 JUN 2024 | T7501 | District 7 | SR 93A (I-75) FROM S OF TAMPA BYPASS CANAL TO S OF SR 582 (F | 1 of 4 | $125,543,396 | Low, 13% under the second |
| 31 JAN 2024 | T2964 | District 2 | SR 228A (EMERSON ST EXPRESSWAY) AND SR 126 (EMERSON ST EXT) | 2 of 3 | $11,725,500 | +13% |
| 06 DEC 2023 | T7527 | District 7 | SR 93A (I-75) FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD | 2 of 4 | $24,918,133 | +10% |
| 25 OCT 2023 | T3685 | District 3 | SR 8 (I-10) AT SR 95 (US 29) INTERCHANGE | 1 of 2 | $236,284,147 | Low, 16% under the second |
| 27 SEP 2023 | T3854 | District 3 | SR 8 (I-10) OVER SR 10 (US 90A) (NINE MILE RD), BRIDGE NOS. | 1 of 2 | $55,462,468 | Low, 19% under the second |
| 17 MAY 2023 | T3686 | District 3 | SR 77 | 2 of 3 | $62,933,208 | +13% |
| 17 MAY 2023 | T7507 | District 7 | SR 93 (I-275) | 2 of 5 | $28,928,928 | +29% |
| 26 APR 2023 | T4613 | District 4 | SR 710 (BEELINE HWY) | 7 of 8 | $189,616,505 | +28% |
| 29 MAR 2023 | T4639 | District 4 | CR 606 (OSLO RD) | 7 of 7 | $131,745,078 | +38% |
| 22 FEB 2023 | T2891 | District 2 | SR 9 (I-95) | 1 of 5 | $79,825,408 | Low, 5.0% under the second |
| 12 JAN 2022 | T4583 | District 4 | SR A1A (NORTH CAUSEWAY) | 2 of 7 | $113,962,075 | +2.0% |
| 25 AUG 2021 | T5735 | District 5 | NASA CAUSEWAY | 6 of 9 | $160,823,902 | +29% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.