FDOT letting results, September 24, 2025
13 contracts let by Florida DOT on September 24, 2025, $234,967,337 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 13
- Low bids, total
- $234,967,337
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T2A24 | SR 23 (FIRST COAST XWAY) FROM SR 9 (I-95) TO E OF CR 2209 | District 2 | 8 | Mastec Civil LLC | $205,250,003 | $210,019,944 | +2.0% | FDOT |
| T2A38 | SR 16 FROM SR 21 TO SR 15 (US 17) | District 2 | 4 | Anderson Columbia Co., Inc. | $9,992,549 | $12,279,261 | +23% | FDOT |
| T7567 | SR 55 (US 19/US 98/N SUNCOAST BLVD) FROM S OF NE 1ST TERR... | District 7 | 3 | Superior Asphalt, Inc. | $4,438,001 | $4,471,570 | +1.0% | FDOT |
| T6592 | SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI | District 6 | 7 | Roadway Construction, LLC | $3,628,931 | $3,867,097 | +7.0% | FDOT |
| T5867 | SR 423 (LEE RD) FROM W OF KINGSWOOD DR TO E OF ADANSON ST | District 5 | 2 | Chinchor Electric Inc. | $3,558,075 | $3,756,000 | +6.0% | FDOT |
| T7592 | SR 39 (US 301 / GALL BLVD) FROM S OF WIRE RD TO N OF WIRE RD | District 7 | 6 | Cone & Graham, Inc. | $1,732,500 | $1,875,123 | +8.0% | FDOT |
| T7566 | SR 595 (ALT US 19 / BAYSHORE DR) FROM WILSON ST TO CURLEW ST | District 7 | 6 | Burgess Civil, LLC | $1,275,290 | $1,349,347 | +6.0% | FDOT |
| T1929 | SR 70 (15TH ST E) FROM 30TH AVE E TO 26TH AVE E | District 1 | 4 | Superior Asphalt, Inc. | $1,159,236 | $1,238,318 | +7.0% | FDOT |
| T4741 | SR 814 (ATLANTIC BLVD) AT LYONS RD | District 4 | 5 | Jva Engineering Contractor, Inc | $1,013,087 | $1,053,257 | +4.0% | FDOT |
| T2A46 | SR 212 (BEACH BLVD) AND SR 10 (ATLANTIC BLVD) AT FOSTER DR.. | District 2 | 5 | Preferred Materials Inc. | $992,131 | $1,051,115 | +6.0% | FDOT |
| T4721 | SR 811 (DIXIE HWY) FROM N OF SR 816 (OAKLAND PARK BLVD) TO.. | District 4 | 4 | Aum Construction Inc. | $825,000 | $926,909 | +12% | FDOT |
| T2A45 | SR 10 (US 90) AT SW HEATHRIDGE DR | District 2 | 4 | Whitehurst, V. E. & Sons, Inc. | $822,535 | $840,000 | +2.0% | FDOT |
| T4752 | SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW.. | District 4 | 5 | Aum Construction Inc. | $279,999 | $294,981 | +5.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.