FDOT contract T1929 bid tabulation
SR 70 (15TH ST E) FROM 30TH AVE E TO 26TH AVE E. Let by Florida DOT on September 24, 2025, Manatee, District 1. 4 bids received; low bid $1,159,236 by Superior Asphalt, Inc..
- Owner
- Florida DOT
- Letting
- 24 SEP 2025
- Pay items
- 75
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Superior Asphalt, Inc. | $1,159,236 | Low |
| 2 | Signal Technology and Installation Corp. | $1,238,318 | +7.0% |
| 3 | Traffic Management Solutions, LLC | $1,411,790 | +22% |
| 4 | Ajax Paving Industries of Florida LLC | $1,664,203 | +44% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Superior Asphalt, Inc. | 2. Signal Technology and Installation Corp. | 3. Traffic Management Solutions, LLC | 4. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $152,000 | $207,802 | $140,000 | $314,019 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $78,000 | $105,593 | $175,617 | $313,683 |
| 0015 | Traffic control officer (0102-14) | HR | 96 | $114.00 | $104.84 | $134.82 | $131.68 |
| 0020 | Work zone sign (0102-60) | ED | 3,587 | $0.30 | $0.30 | $0.33 | $0.31 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 2,600 | $0.14 | $0.14 | $0.15 | $0.15 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 260 | $7.20 | $6.72 | $7.49 | $7.52 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 288 | $13.20 | $13.44 | $14.98 | $13.79 |
| 0040 | Temporary signalization and maintenance, intersection (0102-104) | ED | 260 | $24.60 | $17.60 | $38.30 | $37.62 |
| 0045 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 260 | $1.20 | $33.85 | $71.69 | $31.35 |
| 0050 | Type III barricade (0102-115) | ED | 69 | $0.42 | $0.48 | $0.52 | $0.44 |
| 0055 | Sediment barrier (0104-10-3) | LF | 1,353 | $3.15 | $4.79 | $5.37 | $1.25 |
| 0060 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 51 | $34.77 | $12.86 | $16.73 | $5.02 |
| 0065 | Inlet protection system (0104-18) | EACH | 9 | $180.00 | $268.69 | $272.57 | $62.70 |
| 0070 | Litter removal (0107-1) | ACRE | 5.42 | $100.00 | $95.19 | $306.05 | $81.52 |
| 0075 | Mowing (0107-2) | ACRE | 5.29 | $1,000.00 | $123.94 | $291.27 | $81.52 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $16,800 | $5,415.04 | $20,972 | $52,221 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 126 | $92.00 | $40.62 | $113.85 | $70.23 |
| 0090 | Regular excavation (0120-1) | CY | 1,198.20 | $51.35 | $15.75 | $85.39 | $48.28 |
| 0095 | Embankment (0120-6) | CY | 770.80 | $52.50 | $25.05 | $88.38 | $38.88 |
| 0100 | Geosynthetic reinforced embankment (0145-3) | SY | 88 | $50.50 | $118.19 | $97.37 | $45.77 |
| 0105 | Type B stabilization (0160-4) | SY | 367 | $28.50 | $83.88 | $52.43 | $58.31 |
| 0110 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 3,313 | $6.50 | $5.38 | $9.89 | $10.10 |
| 0115 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 273.40 | $225.00 | $255.30 | $341.55 | $338.29 |
| 0120 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 1 | $14,525 | $9,640.91 | $18,126 | $26,963 |
| 0125 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 59 | $500.00 | $172.08 | $611.19 | $250.82 |
| 0130 | Straight concrete endwalls, single, 30 degrees, round (0430-524120) | EACH | 1 | $12,250 | $5,643.46 | $15,280 | $16,930 |
| 0135 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 506 | $96.00 | $62.60 | $119.84 | $73.36 |
| 0140 | Detectable warnings (0527-2) | SF | 111 | $73.00 | $76.14 | $91.38 | $47.03 |
| 0145 | Performance turf, sod (0570-1-2) | SY | 4,021 | $3.70 | $6.10 | $11.98 | $4.24 |
| 0150 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0155 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $630.00 | $705.44 | $910.86 | $909.21 |
| 0160 | Single column ground sign assembly, relocate (0700-1500) | EACH | 8 | $240.00 | $268.74 | $2,173.35 | $627.04 |
| 0165 | Raised pavement marker, type B (0706-1-3) | EACH | 33 | $5.00 | $5.38 | $11.98 | $9.87 |
| 0170 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 5 | $12.00 | $13.44 | $29.96 | $24.68 |
| 0175 | Painted pavement markings, surface (0710-90) | LS | 1 | $12,700 | $14,170 | $9,737.06 | $8,020.90 |
| 0180 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 996 | $4.15 | $4.64 | $8.99 | $7.40 |
| 0185 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 235 | $8.50 | $9.28 | $14.98 | $12.34 |
| 0190 | Thermoplastic, standard, arrow (0711-11170) | EACH | 2 | $89.00 | $99.44 | $224.70 | $185.10 |
| 0195 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.03 | $4,200.00 | $4,712.60 | $6,741.04 | $5,552.93 |
| 0200 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 870 | $18.40 | $20.60 | $32.96 | $27.15 |
| 0205 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.18 | $11,200 | $12,499 | $14,980 | $12,340 |
| 0210 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.08 | $10,300 | $11,490 | $14,980 | $12,340 |
| 0215 | Conduit, furnish & install, open trench (0630-2-11) | LF | 364 | $33.00 | $18.04 | $18.50 | $22.94 |
| 0220 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,584 | $26.40 | $47.03 | $32.50 | $32.76 |
| 0225 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 15 | $2,900.00 | $1,721.59 | $1,474.83 | $2,083.22 |
| 0230 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 6,770 | $3.70 | $2.65 | $3.11 | $3.70 |
| 0235 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 4 | $2,070.00 | $1,562.39 | $1,485.91 | $1,913.10 |
| 0240 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 6 | $12,700 | $12,631 | $9,832.87 | $11,709 |
| 0245 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 3 | $13,100 | $13,340 | $10,503 | $12,595 |
| 0250 | Light pole complete, F&I, standard pole special foundation, 30' mounting height, 8' arm length (0715-62111) | EACH | 1 | $18,000 | $12,917 | $15,988 | $20,932 |
| 0255 | Light pole complete, relocate (0715-68000) | EACH | 1 | $9,000.00 | $5,817.44 | $7,921.23 | $4,389.28 |
| 0260 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 10 | $1,100.00 | $1,089.06 | $1,143.69 | $1,271.58 |
| 0265 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.25 | $5,475.00 | $13,572 | $14,980 | $15,425 |
| 0270 | Conduit, furnish & install, open trench (0630-2-11) | LF | 500 | $26.50 | $27.08 | $25.15 | $44.18 |
| 0275 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 25 | $26.40 | $135.38 | $40.74 | $62.70 |
| 0280 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $8,150.00 | $10,447 | $5,794.04 | $13,994 |
| 0285 | Fiber optic cable, relocate, underground (0633-1420) | LF | 495 | $5.80 | $140.08 | $5.24 | $6.52 |
| 0290 | Fiber optic connection, install, splice (0633-2-31) | EACH | 12 | $75.00 | $195.85 | $67.41 | $67.72 |
| 0295 | Fiber optic connection hardware, adjust/modify splice tray (0633-3-52) | EACH | 1 | $42.00 | $168.98 | $37.45 | $37.62 |
| 0300 | Fiber optic connection hardware, adjust/modify patch panel (0633-3-56) | EACH | 1 | $1,218.00 | $1,109.55 | $1,086.06 | $1,091.05 |
| 0305 | Fiber optic cable locator (0633-6) | DA | 130 | $384.00 | $255.55 | $242.36 | $344.87 |
| 0310 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 2 | $4,440.00 | $1,721.60 | $2,844.12 | $3,613.22 |
| 0315 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $3,500.00 | $3,389.09 | $2,813.07 | $3,726.21 |
| 0320 | Aluminum signals pole, remove (0646-1-60) | EACH | 2 | $400.00 | $178.29 | $557.93 | $627.04 |
| 0325 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 3 | $2,600.00 | $1,620.57 | $2,389.41 | $2,460.39 |
| 0330 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 1 | $330.00 | $135.38 | $329.89 | $564.34 |
| 0335 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 7 | $1,140.00 | $502.01 | $1,391.30 | $1,534.81 |
| 0340 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,190.00 | $746.42 | $1,039.74 | $1,366.63 |
| 0345 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 2 | $133.00 | $135.38 | $179.48 | $313.52 |
| 0350 | Loop assembly, F&I, type B (0660-2102) | AS | 1 | $1,760.00 | $5,244.40 | $1,314.75 | $2,002.77 |
| 0355 | Loop assembly, F&I, type F (0660-2106) | AS | 4 | $1,580.00 | $4,442.21 | $1,464.56 | $2,915.74 |
| 0360 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 4 | $350.00 | $558.53 | $348.24 | $379.82 |
| 0365 | Traffic controller, modify (0671-2-40) | EACH | 2 | $2,625.00 | $8,248.53 | $1,035.09 | $5,894.18 |
| 0370 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 2 | $2,625.00 | $8,967.39 | $1,035.09 | $6,207.70 |
| 0375 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 6 | $1,100.00 | $941.43 | $1,183.84 | $1,428.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.