Superior Asphalt, Inc.: FDOT bid record

Superior Asphalt, Inc. submitted 57 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 OCT 2026, and was the low bidder on 12 of them (21%). When it was not low, its total sat a median +14% above the low bid.

Owner
Florida DOT
Low bid volume
$108,233,189
Latest bid
28 OCT 2026
Data through
28 OCT 2026
57Bids
12Low bids
21Win rate, percent
+14%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
2018400%
20192150%
2020100%
2021100%
2022200%
202333100%
20248338%
202519316%
202617212%
Superior Asphalt, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 128829%
District 716213%
District 59222%
District 2400%
Superior Asphalt, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Raised pavement marker, type B0706-1-3EACH8222 (27%)$4.90$5.00
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM5217 (33%)$1,627.50$1,350.00
Painted pavement markings, standard, white, solid, 6"0710-11101GM5316 (30%)$1,700.00$1,350.00
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF5216 (31%)$7.12$6.09
Litter removal0107-1ACRE5413 (24%)$58.25$52.98
Thermoplastic, standard, arrow0711-11170EACH5213 (25%)$86.33$80.00
Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6"0710-11141GM3913 (33%)$763.00$705.00
Ground-in rumble strips, 8" sinusoidal0546-72-3GM2613 (50%)$1,610.00$2,367.50
Type B stabilization0160-4SY3112 (39%)$26.00$15.00
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH7311 (15%)$1,575.00$1,150.00
Milling existing asphalt pavement, 3" avg depth0327-70-4SY2611 (42%)$3.02$4.56
Performance turf, sod0570-1-2SY5210 (19%)$6.85$5.00
Superior Asphalt, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Superior Asphalt, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T1937District 1446204152012 of 4$23,274,274+6.0%
28 OCT 2026T2A82District 2SR 24A / SR 226 (SW 16TH AVE) FROM SR 24 (ARCHER RD) TO SR 331 (SE WILLISTON5 of 5$3,726,001+28%
28 OCT 2026T7591District 7SR 600 (US 92) FROM EUREKA SPRINGS RD TO THONOTOSASSA RD5 of 5$19,913,001+19%
26 AUG 2026T1945District 1SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF3 of 5$18,997,617+21%
26 AUG 2026T7614District 7SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD2 of 6$5,576,001+1.0%
29 JUL 2026T1942District 1SR 64 FROM W OF CR 675 TO WINGATE RD3 of 4$10,214,148+23%
29 JUL 2026T7599District 7SR 45 (US 41) FROM S OF COUNTY LINE RD TO S OF POWELL RD2 of 4$8,119,001+2.0%
20 MAY 2026T7576District 7FOREST RIDGE BLVD FROM W LAKE BEVERLY DR TO W COLBERT CT3 of 3$4,027,001+36%
20 MAY 2026T7587District 7SR 597 (N DALE MABRY HWY) FROM N OF W SOUTH AVE TO N OF W...5 of 5$12,612,001+70%
25 MAR 2026T1925District 1SR 683 (US 301) FROM US 41 TO S OF 10TH ST3 of 3$3,867,849+23%
25 MAR 2026T2A70District 2SR 121 FROM SR 55 (US 19) TO SR 45 (US 41 / SW 7TH ST)5 of 5$12,341,001+16%
25 FEB 2026T1813District 1SR 45 (US 41) FROM N OF EDWARDS DR TO N MAGELLAN...1 of 4$15,369,593Low, 1.0% under the second
25 FEB 2026T1916District 1SR 72 FROM SR 45 (US 41) TO SAWYER RD5 of 5$16,749,613+13%
25 FEB 2026T2A59District 2SR 500 (US 27) FROM NE 10TH ST TO MARION CO LINE5 of 6$5,189,001+32%
25 FEB 2026T7583District 7SR 56 AND CR 581 (BRUCE B DOWNS BLVD) FROM BRUCE B DOWNS BL.3 of 5$20,549,001+4.0%
25 FEB 2026T7601District 7SR 60 FROM W OF BEN T DAVIS BEACH ENTRACE TO E OF BAYPORT DR5 of 6$8,738,001+23%
28 JAN 2026T1922District 1SR 684 (CORTEZ RD) FROM 86TH ST W TO W OF 30TH ST W1 of 4$12,497,735Low, 3.0% under the second
03 DEC 2025T7572District 7SR 93 (I-275) FROM WILLOW AVE TO W OF GREEN ST2 of 5$2,213,001+41%
29 OCT 2025T1924District 1SR 776 FROM CHARLOTTE CO LINE TO S OF US 412 of 4$14,745,650+1.0%
29 OCT 2025T5869District 5SR 40 (E SILVER SPRINGS BLVD) FROM US 441 TO SE 196 TERRACE3 of 3$18,448,001+11%
24 SEP 2025T1929District 1SR 70 (15TH ST E) FROM 30TH AVE E TO 26TH AVE E1 of 4$1,159,236Low, 7.0% under the second
24 SEP 2025T7567District 7SR 55 (US 19/US 98/N SUNCOAST BLVD) FROM S OF NE 1ST TERR...1 of 3$4,438,001Low, 1.0% under the second
30 JUL 2025T5819District 5SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH3 of 8$5,972,001+20%
11 JUN 2025T5852District 5SR 500 (US 441) FROM MILLS ST TO COLLEGE DR3 of 5$8,821,001+6.0%
11 JUN 2025T5855District 5SR 530 (US 192) FROM SR 25 (US 27) TO ORANGE CO LINE7 of 7$7,374,001+21%
Superior Asphalt, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy