FDOT contract T5852 bid tabulation
SR 500 (US 441) FROM MILLS ST TO COLLEGE DR. Let by Florida DOT on June 11, 2025, Lake, District 5. 5 bids received; low bid $8,337,454 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 11 JUN 2025
- Pay items
- 144
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $8,337,454 | Low |
| 2 | Ranger Construction Industries, Inc. | $8,394,558 | +1.0% |
| 3 | Superior Asphalt, Inc. | $8,821,001 | +6.0% |
| 4 | Masci General Contractors, Inc | $10,112,994 | +21% |
| 5 | Anderson Columbia Co., Inc. | $11,286,787 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Ranger Construction Industries, Inc. | 3. Superior Asphalt, Inc. | 4. Masci General Contractors, Inc | 5. Anderson Columbia Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $723,955 | $625,000 | $636,224 | $887,000 | $1,116,095 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $407,353 | $279,100 | $555,000 | $332,100 | $497,176 |
| 0015 | Commercial material for temporary driveway maintenance (0102-3) | CY | 5.30 | $190.00 | $109.90 | $245.00 | $99.50 | $756.60 |
| 0020 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $11,000 | $1,000.00 | $8,135.00 | $8,774.50 | $13,533 |
| 0025 | Traffic control officer (0102-14) | HR | 136 | $100.00 | $93.40 | $115.00 | $97.50 | $155.05 |
| 0030 | Pedestrian escort operation (0102-25100) | HR | 1,008 | $33.00 | $29.80 | $38.00 | $72.50 | $124.22 |
| 0035 | Work zone sign (0102-60) | ED | 23,976 | $0.25 | $0.25 | $0.30 | $0.24 | $0.28 |
| 0040 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 474 | $43.50 | $42.85 | $47.75 | $43.00 | $52.58 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 33,716 | $0.11 | $0.10 | $0.15 | $0.14 | $0.13 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 2,296 | $0.06 | $0.05 | $0.10 | $0.09 | $0.07 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 808 | $5.60 | $5.50 | $5.25 | $6.00 | $6.74 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 568 | $11.00 | $11.00 | $11.40 | $14.00 | $13.48 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 540 | $21.00 | $17.35 | $60.00 | $18.98 | $21.31 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 540 | $21.00 | $17.35 | $39.00 | $18.98 | $21.31 |
| 0075 | Type III barricade (0102-115) | ED | 72 | $0.40 | $0.40 | $1.10 | $1.00 | $0.47 |
| 0080 | Sediment barrier (0104-10-3) | LF | 4,448 | $3.05 | $2.90 | $1.35 | $1.50 | $4.67 |
| 0085 | Soil tracking prevention device (0104-15) | EACH | 2 | $1,900.00 | $1,500.00 | $5,205.00 | $2,900.00 | $8,414.90 |
| 0090 | Inlet protection system (0104-18) | EACH | 216 | $155.00 | $214.30 | $135.50 | $200.00 | $202.23 |
| 0095 | Litter removal (0107-1) | ACRE | 600 | $22.50 | $22.00 | $47.75 | $25.89 | $26.96 |
| 0100 | Mowing (0107-2) | ACRE | 600 | $67.50 | $65.90 | $84.75 | $80.89 | $87.63 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $91,450 | $10,170 | $81,000 | $45,430 | $73,311 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 836 | $43.00 | $21.15 | $37.80 | $37.50 | $116.10 |
| 0115 | Mailbox, F&I single (0110-7-1) | EACH | 3 | $825.00 | $236.50 | $196.75 | $300.00 | $269.64 |
| 0120 | Regular excavation (0120-1) | CY | 407.30 | $57.00 | $20.05 | $54.00 | $29.50 | $139.78 |
| 0125 | Embankment (0120-6) | CY | 451.60 | $65.00 | $22.45 | $48.75 | $31.20 | $126.83 |
| 0130 | Type B stabilization (0160-4) | SY | 2,931 | $25.00 | $20.40 | $30.25 | $23.50 | $22.91 |
| 0135 | Optional base, base group 01 (0285-701) | SY | 431 | $75.50 | $25.90 | $33.25 | $59.30 | $68.56 |
| 0140 | Optional base, base group 03 (0285-703) | SY | 28 | $88.75 | $39.25 | $38.50 | $59.30 | $91.66 |
| 0145 | Optional base, base group 09 (0285-709) | SY | 1,542 | $42.25 | $30.85 | $41.75 | $45.20 | $52.08 |
| 0150 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 200,534 | $1.75 | $2.45 | $2.35 | $2.95 | $4.50 |
| 0155 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 5,726 | $3.35 | $1.00 | $2.20 | $2.59 | $3.11 |
| 0160 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 21,854 | $3.55 | $4.70 | $3.15 | $4.15 | $6.06 |
| 0165 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 3,134.50 | $120.00 | $122.80 | $141.45 | $185.52 | $166.24 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 24,551.20 | $143.75 | $155.50 | $155.40 | $193.52 | $172.62 |
| 0175 | Miscellaneous asphalt (0339-1) | TN | 1.50 | $4,300.00 | $514.50 | $415.00 | $1,320.00 | $661.82 |
| 0180 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 1 | $12,000 | $14,800 | $10,260 | $15,645 | $15,023 |
| 0185 | Inlets, ditch bottom, type C, partial (0425-1525) | EACH | 1 | $4,800.00 | $4,980.00 | $11,880 | $4,523.00 | $7,934.12 |
| 0190 | Manhole, adjust (0425-5) | EACH | 19 | $280.00 | $722.50 | $1,300.00 | $1,230.00 | $1,756.05 |
| 0195 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 100 | $235.00 | $209.40 | $324.00 | $299.56 | $201.69 |
| 0200 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 18 | $500.00 | $640.00 | $378.00 | $459.60 | $446.38 |
| 0205 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 12 | $4,000.00 | $3,180.00 | $324.00 | $4,500.00 | $3,166.23 |
| 0210 | Pedestrian / bicycle railing, NS, 42" type 1 (0515-2111) | LF | 15 | $225.00 | $527.50 | $162.75 | $217.00 | $269.64 |
| 0215 | Concrete curb & gutter, type E (0520-1-7) | LF | 340 | $69.00 | $102.80 | $54.00 | $50.90 | $95.45 |
| 0220 | Concrete curb & gutter, type F (0520-1-10) | LF | 963 | $65.00 | $74.90 | $59.50 | $50.90 | $93.47 |
| 0225 | Concrete curb, type D (0520-2-4) | LF | 5 | $120.00 | $280.80 | $48.50 | $112.50 | $274.84 |
| 0230 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 155 | $110.75 | $79.60 | $243.00 | $110.50 | $248.74 |
| 0235 | Median concrete barrier, tall grade-separated (0521-1-13) | LF | 311 | $625.00 | $560.00 | $675.00 | $720.00 | $1,219.93 |
| 0240 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 772 | $87.50 | $75.00 | $75.75 | $99.65 | $189.57 |
| 0245 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 628 | $155.00 | $160.90 | $97.25 | $121.50 | $200.79 |
| 0250 | Detectable warnings (0527-2) | SF | 1,004 | $33.50 | $48.35 | $23.00 | $33.29 | $52.58 |
| 0255 | Guardrail -roadway, general (0536-1-1) | LF | 67 | $28.00 | $70.60 | $27.25 | $40.00 | $53.93 |
| 0260 | Pipe rail for guardrail (0536-6) | LF | 37 | $28.00 | $43.70 | $27.25 | $35.00 | $40.44 |
| 0265 | Guardrail removal (0536-73) | LF | 76 | $5.60 | $21.90 | $5.50 | $10.00 | $13.48 |
| 0270 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $4,650.00 | $5,490.00 | $4,500.00 | $5,200.00 | $6,740.96 |
| 0275 | Performance turf, sod (0570-1-2) | SY | 4,388 | $16.00 | $11.40 | $4.50 | $4.75 | $9.44 |
| 0280 | Conduit, furnish & install, open trench (0630-2-11) | LF | 6 | $50.00 | $26.40 | $50.00 | $28.84 | $32.39 |
| 0285 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 207 | $50.00 | $29.90 | $50.00 | $32.63 | $36.65 |
| 0290 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $1,425.00 | $1,820.00 | $1,410.00 | $1,982.29 | $2,227.09 |
| 0295 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 1 | $13,900 | $11,200 | $13,550 | $12,282 | $13,799 |
| 0300 | Aluminum pole- index 695-001, furnish & install, 20' (0646-2120) | EACH | 1 | $5,850.00 | $4,230.00 | $5,670.00 | $4,619.04 | $5,189.46 |
| 0305 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $3,100.00 | $2,790.00 | $3,035.00 | $3,050.84 | $3,427.59 |
| 0310 | Traffic monitoring site solar power unit, furnish & install (0695-5-1) | EACH | 1 | $2,700.00 | $4,950.00 | $2,660.00 | $5,407.79 | $6,075.61 |
| 0315 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $2,500.00 | $2,510.00 | $2,470.00 | $2,740.93 | $3,079.41 |
| 0320 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 1 | $8,000.00 | $8,450.00 | $7,840.00 | $9,228.74 | $10,368 |
| 0325 | Traffic monitoring site cabinet, furnish & install, type 4, 2 plane back, polemount (0695-7173) | EACH | 1 | $7,900.00 | $9,090.00 | $7,735.00 | $9,925.70 | $11,151 |
| 0330 | Traffic monitoring site communications modem furnish install (0695-8-11) | EACH | 1 | $1,300.00 | $3,290.00 | $1,285.00 | $3,588.00 | $4,031.10 |
| 0335 | Raised pavement marker, type B (0706-1-3) | EACH | 418 | $4.75 | $4.95 | $4.60 | $5.00 | $5.73 |
| 0340 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 13.94 | $2,200.00 | $1,100.00 | $2,170.00 | $1,300.00 | $2,696.39 |
| 0345 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 4,310 | $1.15 | $0.55 | $1.10 | $1.00 | $1.35 |
| 0350 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 889 | $2.25 | $1.10 | $2.20 | $1.50 | $2.70 |
| 0355 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 15.57 | $785.00 | $549.00 | $760.00 | $710.00 | $943.73 |
| 0360 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 15 | $60.00 | $38.45 | $54.25 | $57.50 | $67.41 |
| 0365 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 178 | $43.00 | $27.45 | $41.25 | $30.00 | $51.24 |
| 0370 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.89 | $5,600.00 | $1,100.00 | $5,425.00 | $1,300.00 | $6,740.96 |
| 0375 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.38 | $1,000.00 | $547.00 | $975.00 | $710.00 | $1,213.37 |
| 0380 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $105,000 | $105,000 | $105,000 | $105,000 | $105,000 |
| 0385 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 2.66 | $3,200.00 | $2,200.00 | $2,170.00 | $3,955.00 | $11,943 |
| 0390 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 100 | $480.00 | $588.50 | $575.00 | $600.00 | $714.54 |
| 0395 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 46 | $1,500.00 | $1,830.00 | $2,170.00 | $2,120.00 | $2,696.39 |
| 0400 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 20 | $1,800.00 | $2,370.00 | $2,385.00 | $2,500.00 | $2,966.02 |
| 0405 | Single column ground sign assembly, relocate (0700-1500) | EACH | 3 | $1,100.00 | $379.00 | $1,085.00 | $1,100.00 | $1,348.19 |
| 0410 | Single column ground sign assembly, remove (0700-1600) | EACH | 147 | $120.00 | $126.40 | $27.15 | $40.00 | $33.70 |
| 0415 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 8 | $5,000.00 | $8,350.00 | $7,050.00 | $7,500.00 | $8,763.25 |
| 0420 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $7,000.00 | $9,730.00 | $7,590.00 | $8,000.00 | $9,437.35 |
| 0425 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 12 | $1,200.00 | $2,020.00 | $2,170.00 | $2,300.00 | $2,696.39 |
| 0430 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 14 | $390.00 | $344.50 | $380.00 | $450.00 | $471.86 |
| 0435 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 55 | $200.00 | $410.50 | $54.25 | $75.00 | $67.41 |
| 0440 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 14 | $55.00 | $252.80 | $27.25 | $95.00 | $33.70 |
| 0445 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 24 | $110.00 | $173.70 | $135.50 | $145.00 | $168.53 |
| 0450 | Tubular marker, 36" white post (0704-1-3) | EACH | 38 | $195.00 | $247.30 | $425.00 | $250.00 | $303.34 |
| 0455 | Tubular marker, 36" yellow (0704-1-4) | EACH | 41 | $200.00 | $247.30 | $245.00 | $250.00 | $303.34 |
| 0460 | Object marker, type 1 (0705-10-1) | EACH | 12 | $200.00 | $185.90 | $325.00 | $350.00 | $404.45 |
| 0465 | Raised pavement marker, type B (0706-1-3) | EACH | 3,527 | $4.75 | $4.95 | $4.60 | $5.00 | $5.73 |
| 0470 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 337 | $5.60 | $5.50 | $5.45 | $5.75 | $6.74 |
| 0475 | Painted pavement markings, surface (0710-90) | LS | 1 | $89,150 | $133,000 | $86,330 | $115,000 | $107,323 |
| 0480 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,310 | $3.90 | $4.40 | $3.80 | $4.35 | $4.72 |
| 0485 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 605 | $5.05 | $6.60 | $4.90 | $6.45 | $6.07 |
| 0490 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 889 | $7.30 | $8.80 | $7.05 | $8.54 | $8.76 |
| 0495 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.38 | $1,650.00 | $2,740.00 | $1,626.00 | $2,700.00 | $2,022.28 |
| 0500 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 15 | $165.00 | $137.40 | $162.75 | $165.00 | $202.23 |
| 0505 | Thermoplastic, standard, arrow (0711-11170) | EACH | 178 | $106.00 | $109.90 | $103.00 | $109.50 | $128.08 |
| 0510 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 256 | $5.05 | $6.60 | $4.90 | $6.45 | $6.07 |
| 0515 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.74 | $1,670.00 | $2,730.00 | $1,625.00 | $2,700.00 | $2,022.28 |
| 0520 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,948 | $15.60 | $15.40 | $15.25 | $15.40 | $18.87 |
| 0525 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 47 | $223.00 | $219.80 | $217.00 | $215.00 | $269.64 |
| 0530 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 47 | $106.00 | $109.90 | $103.00 | $109.50 | $128.08 |
| 0535 | Thermoplastic, preformed, color, in pavement warning (0711-14760) | EACH | 2 | $783.00 | $1,980.00 | $760.00 | $1,950.00 | $943.73 |
| 0540 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 13.94 | $5,597.00 | $5,270.00 | $5,425.00 | $5,120.00 | $6,740.96 |
| 0545 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.76 | $6,023.00 | $10,100 | $5,850.00 | $9,500.00 | $7,280.24 |
| 0550 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 15.57 | $1,477.00 | $1,650.00 | $1,430.00 | $1,650.00 | $1,779.61 |
| 0555 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.78 | $1,664.00 | $1,630.00 | $1,625.00 | $1,650.00 | $2,022.28 |
| 0560 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.89 | $5,599.00 | $5,270.00 | $5,425.00 | $5,120.00 | $6,740.96 |
| 0565 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 921 | $2.80 | $5.50 | $2.70 | $5.50 | $8.09 |
| 0570 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 4.21 | $2,000.00 | $4,420.00 | $1,875.00 | $4,830.00 | $5,426.47 |
| 0575 | Itsfm location documentation- intersection (0611-2-1) | EACH | 2 | $2,000.00 | $2,020.00 | $1,875.00 | $2,208.00 | $2,480.68 |
| 0580 | Conduit, furnish & install, open trench (0630-2-11) | LF | 349 | $31.50 | $22.60 | $31.00 | $24.70 | $27.74 |
| 0585 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 634 | $48.75 | $27.35 | $47.25 | $29.87 | $33.55 |
| 0590 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $13,500 | $13,800 | $13,140 | $14,975 | $16,911 |
| 0595 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $1,770.00 | $3,540.00 | $1,715.00 | $3,864.00 | $4,341.17 |
| 0600 | Fiber optic cable, relocate, underground (0633-1420) | LF | 31 | $11.75 | $5.35 | $11.40 | $5.87 | $6.59 |
| 0605 | Fiber optic connection, install, termination (0633-2-32) | EACH | 24 | $110.00 | $61.00 | $107.50 | $66.59 | $74.81 |
| 0610 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 2 | $125.00 | $103.80 | $121.50 | $113.30 | $127.29 |
| 0615 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 2 | $1,675.00 | $2,210.00 | $1,625.00 | $2,415.00 | $2,713.24 |
| 0620 | Fiber optic cable locator (0633-6) | DA | 270 | $265.00 | $227.50 | $256.00 | $220.00 | $279.08 |
| 0625 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 32 | $1,450.00 | $1,820.00 | $1,410.00 | $1,982.29 | $2,227.09 |
| 0630 | Electrical service wire, & install (0639-2-1) | LF | 55 | $9.15 | $6.15 | $8.90 | $6.70 | $7.54 |
| 0635 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $2,800.00 | $3,850.00 | $2,785.00 | $4,120.00 | $4,726.61 |
| 0640 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 3 | $2,500.00 | $2,780.00 | $2,485.00 | $3,041.05 | $3,416.61 |
| 0645 | Aluminum signals pole, remove (0646-1-60) | EACH | 3 | $350.00 | $758.00 | $345.00 | $828.00 | $930.25 |
| 0650 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 24 | $750.00 | $1,040.00 | $730.00 | $1,015.00 | $1,271.22 |
| 0655 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $1,050.00 | $1,440.00 | $1,020.00 | $1,573.68 | $1,768.02 |
| 0660 | Vehicle detection system - microwave, remove, complete system (0660-3-60) | EACH | 1 | $1,400.00 | $2,530.00 | $1,370.00 | $2,760.00 | $3,100.84 |
| 0665 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 2 | $24,000 | $20,600 | $23,300 | $22,491 | $25,268 |
| 0670 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 8 | $10,600 | $9,750.00 | $10,330 | $10,648 | $11,963 |
| 0675 | Vehicle detection system- remove (0660-4-60) | EACH | 1 | $1,750.00 | $2,530.00 | $1,715.00 | $2,760.00 | $3,100.84 |
| 0680 | Signal priority & preemption system, relocate (0663-1400) | EACH | 2 | $1,590.00 | $3,100.00 | $1,540.00 | $3,381.00 | $3,798.53 |
| 0685 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 16 | $1,890.00 | $2,080.00 | $1,835.00 | $2,267.69 | $2,547.73 |
| 0690 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 8 | $58.75 | $63.20 | $57.00 | $69.00 | $77.52 |
| 0695 | Traffic controller, relocate- without cabinet (0671-2-50) | EACH | 2 | $2,290.00 | $2,530.00 | $2,225.00 | $2,760.00 | $3,100.84 |
| 0700 | Traffic signal controller cabinet, furnish & install without controller, NEMA 44" W X 52" H X 24" D (0676-1116) | EACH | 2 | $61,000 | $32,400 | $59,070 | $35,347 | $39,712 |
| 0705 | Traffic signal controller cabinet, remove (0676-1600) | EACH | 2 | $1,180.00 | $2,460.00 | $1,145.00 | $2,691.00 | $3,023.32 |
| 0710 | Managed field ethernet switch, relocate (0684-1-4) | EACH | 2 | $1,190.00 | $1,070.00 | $1,154.00 | $1,173.00 | $1,317.85 |
| 0715 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 2 | $11,050 | $11,600 | $10,720 | $12,100 | $14,255 |
| 0720 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 2 | $2,250.00 | $1,050.00 | $2,190.00 | $1,147.19 | $1,288.87 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 11, 2025. Compiled by Mirage Metrics.