Masci General Contractors, Inc: FDOT bid record

Masci General Contractors, Inc submitted 99 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 35 of them (35%). When it was not low, its total sat a median +18% above the low bid.

Owner
Florida DOT
Low bid volume
$384,324,730
Latest bid
28 OCT 2026
Data through
28 OCT 2026
99Bids
35Low bids
35Win rate, percent
+18%Median gap to the low bid when not low, 64 bids

By year

YearBidsLow bidsWin rate
201814536%
201910330%
20207229%
202112325%
202210330%
202313431%
20247229%
20258338%
2026181056%
Masci General Contractors, Inc, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 5913538%
District 2800%
Masci General Contractors, Inc, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Performance turf, sod0570-1-2SY9041 (46%)$3.85$5.00
Removal of existing concrete0110-4-10SY8541 (48%)$21.35$33.96
Type B stabilization0160-4SY7337 (51%)$10.00$15.00
Regular excavation0120-1CY8435 (42%)$17.63$25.47
Asphalt concrete friction course,traffic C, FC-12.5, PG0337-7-83TN6834 (50%)$159.45$185.00
Superpave asphaltic conc, traffic C0334-1-13TN6732 (48%)$132.40$169.55
Milling existing asphalt pavement, 1 1/2" avg depth0327-70-6SY4632 (70%)$2.57$4.61
Embankment0120-6CY8631 (36%)$22.92$30.04
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH15729 (18%)$1,570.67$1,150.00
Inlet protection system0104-18EACH8529 (34%)$110.00$150.00
Litter removal0107-1ACRE9128 (31%)$40.00$52.98
Traffic control officer0102-14HR6328 (44%)$90.00$80.00
Masci General Contractors, Inc, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Masci General Contractors, Inc, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T2A73District 2SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE7 of 8$24,465,702+50%
28 OCT 2026T5914District 5SR 9 (I-95) FROM VIERA BLVD TO SR 519 (FISKE BLVD)1 of 4$20,411,474Low, 1.0% under the second
30 SEP 2026T5893District 5SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 6001 of 8$5,641,959Low, 5.0% under the second
26 AUG 2026T5890District 5SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE6 of 6$9,475,265+74%
29 JUL 2026T5883District 5SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.5441 of 9$19,820,019Low, 2.0% under the second
29 JUL 2026T5889District 5SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA1 of 5$2,981,009Low, 13% under the second
29 JUL 2026T5891District 5SR 9 (I-95) FROM CITRUS BLVD TO ADDISON CANAL1 of 4$14,950,330Low, 3.0% under the second
15 JUN 2026T5885District 5SR 400 (I-4) FROM MP 21.540 TO MP 22.5582 of 4$44,188,167+4.0%
10 JUN 2026T5884District 5SR 400 FROM MP 22.660 TO MP 23.4752 of 6$39,757,750+4.0%
20 MAY 2026T5863District 5SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92)1 of 6$5,972,774Low, 11% under the second
20 MAY 2026T5882District 5ELLIS RD FROM J RODES BLVD TO WICKHAM RD1 of 10$31,904,104Low, 16% under the second
29 APR 2026T5880District 5SR 5A (NOVA RD) FROM FLOMICH ST TO US 12 of 3$10,393,428+3.0%
29 APR 2026T5881District 5SR 5 (US 1) FROM SR 400 (BEVILLE RD) TO N OF FAIRVIEW AVE1 of 2$9,229,481Low, 3.0% under the second
25 MAR 2026T5876District 5SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST6 of 6$47,241,229+77%
25 MAR 2026T5877District 5SR 44 FROM W OF I-95 TO E OF S WALKER DR1 of 3$5,958,391Low, 10% under the second
25 FEB 2026T2A33District 2SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL7 of 8$9,238,517+47%
28 JAN 2026T5874District 5SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ...1 of 5$9,523,246Low, 8.0% under the second
28 JAN 2026T5875District 5SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 7300774 of 6$14,376,122+14%
03 DEC 2025T2A53District 2SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO...8 of 8$43,592,112+118%
29 OCT 2025T5861District 5SR A1A (OCEAN SHORE BLVD) FROM N OF ROBERTA RD TO FLAGLER...1 of 4$12,993,380Low, 4.0% under the second
30 JUL 2025T5860District 5SR 9 (I-95) FROM S OF SR 50 TO SR 461 of 5$29,845,663Low, 10% under the second
11 JUN 2025T5851District 5SR 500 (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS5 of 5$39,625,060+13%
11 JUN 2025T5852District 5SR 500 (US 441) FROM MILLS ST TO COLLEGE DR4 of 5$10,112,994+21%
28 MAY 2025T5844District 5SR 513 FROM SR 518 TO PATRICK SPACE FORCE BASE2 of 3$10,265,951+1.0%
30 APR 2025T5793District 5SR 9 (I-95) FROM MP 18.355 TO MP 19.5526 of 7$76,255,055+27%
Masci General Contractors, Inc: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy