Masci General Contractors, Inc submitted 99 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 35 of them (35%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $384,324,730
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 14 | 5 | 36% |
| 2019 | 10 | 3 | 30% |
| 2020 | 7 | 2 | 29% |
| 2021 | 12 | 3 | 25% |
| 2022 | 10 | 3 | 30% |
| 2023 | 13 | 4 | 31% |
| 2024 | 7 | 2 | 29% |
| 2025 | 8 | 3 | 38% |
| 2026 | 18 | 10 | 56% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 91 | 35 | 38% |
| District 2 | 8 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Performance turf, sod | 0570-1-2 | SY | 90 | 41 (46%) | $3.85 | $5.00 |
| Removal of existing concrete | 0110-4-10 | SY | 85 | 41 (48%) | $21.35 | $33.96 |
| Type B stabilization | 0160-4 | SY | 73 | 37 (51%) | $10.00 | $15.00 |
| Regular excavation | 0120-1 | CY | 84 | 35 (42%) | $17.63 | $25.47 |
| Asphalt concrete friction course,traffic C, FC-12.5, PG | 0337-7-83 | TN | 68 | 34 (50%) | $159.45 | $185.00 |
| Superpave asphaltic conc, traffic C | 0334-1-13 | TN | 67 | 32 (48%) | $132.40 | $169.55 |
| Milling existing asphalt pavement, 1 1/2" avg depth | 0327-70-6 | SY | 46 | 32 (70%) | $2.57 | $4.61 |
| Embankment | 0120-6 | CY | 86 | 31 (36%) | $22.92 | $30.04 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 157 | 29 (18%) | $1,570.67 | $1,150.00 |
| Inlet protection system | 0104-18 | EACH | 85 | 29 (34%) | $110.00 | $150.00 |
| Litter removal | 0107-1 | ACRE | 91 | 28 (31%) | $40.00 | $52.98 |
| Traffic control officer | 0102-14 | HR | 63 | 28 (44%) | $90.00 | $80.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| P & S Paving, Inc. | 39 | 23 of 39 |
| Hubbard Construction Company | 38 | 17 of 38 |
| Ranger Construction Industries, Inc. | 34 | 17 of 34 |
| Preferred Materials Inc. | 30 | 15 of 30 |
| Halifax Paving, Inc. | 28 | 18 of 28 |
| Southland Construction, Inc. | 23 | 8 of 23 |
| Watson Civil Construction, Inc. | 19 | 7 of 19 |
| C.W. Roberts Contracting, Inc. | 15 | 7 of 15 |
| Ohla USA Inc | 13 | 6 of 13 |
| Atlantic Civil Constructors Corp | 12 | 7 of 12 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A73 | District 2 | SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE | 7 of 8 | $24,465,702 | +50% |
| 28 OCT 2026 | T5914 | District 5 | SR 9 (I-95) FROM VIERA BLVD TO SR 519 (FISKE BLVD) | 1 of 4 | $20,411,474 | Low, 1.0% under the second |
| 30 SEP 2026 | T5893 | District 5 | SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 600 | 1 of 8 | $5,641,959 | Low, 5.0% under the second |
| 26 AUG 2026 | T5890 | District 5 | SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE | 6 of 6 | $9,475,265 | +74% |
| 29 JUL 2026 | T5883 | District 5 | SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.544 | 1 of 9 | $19,820,019 | Low, 2.0% under the second |
| 29 JUL 2026 | T5889 | District 5 | SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA | 1 of 5 | $2,981,009 | Low, 13% under the second |
| 29 JUL 2026 | T5891 | District 5 | SR 9 (I-95) FROM CITRUS BLVD TO ADDISON CANAL | 1 of 4 | $14,950,330 | Low, 3.0% under the second |
| 15 JUN 2026 | T5885 | District 5 | SR 400 (I-4) FROM MP 21.540 TO MP 22.558 | 2 of 4 | $44,188,167 | +4.0% |
| 10 JUN 2026 | T5884 | District 5 | SR 400 FROM MP 22.660 TO MP 23.475 | 2 of 6 | $39,757,750 | +4.0% |
| 20 MAY 2026 | T5863 | District 5 | SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92) | 1 of 6 | $5,972,774 | Low, 11% under the second |
| 20 MAY 2026 | T5882 | District 5 | ELLIS RD FROM J RODES BLVD TO WICKHAM RD | 1 of 10 | $31,904,104 | Low, 16% under the second |
| 29 APR 2026 | T5880 | District 5 | SR 5A (NOVA RD) FROM FLOMICH ST TO US 1 | 2 of 3 | $10,393,428 | +3.0% |
| 29 APR 2026 | T5881 | District 5 | SR 5 (US 1) FROM SR 400 (BEVILLE RD) TO N OF FAIRVIEW AVE | 1 of 2 | $9,229,481 | Low, 3.0% under the second |
| 25 MAR 2026 | T5876 | District 5 | SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST | 6 of 6 | $47,241,229 | +77% |
| 25 MAR 2026 | T5877 | District 5 | SR 44 FROM W OF I-95 TO E OF S WALKER DR | 1 of 3 | $5,958,391 | Low, 10% under the second |
| 25 FEB 2026 | T2A33 | District 2 | SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL | 7 of 8 | $9,238,517 | +47% |
| 28 JAN 2026 | T5874 | District 5 | SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ... | 1 of 5 | $9,523,246 | Low, 8.0% under the second |
| 28 JAN 2026 | T5875 | District 5 | SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 730077 | 4 of 6 | $14,376,122 | +14% |
| 03 DEC 2025 | T2A53 | District 2 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | 8 of 8 | $43,592,112 | +118% |
| 29 OCT 2025 | T5861 | District 5 | SR A1A (OCEAN SHORE BLVD) FROM N OF ROBERTA RD TO FLAGLER... | 1 of 4 | $12,993,380 | Low, 4.0% under the second |
| 30 JUL 2025 | T5860 | District 5 | SR 9 (I-95) FROM S OF SR 50 TO SR 46 | 1 of 5 | $29,845,663 | Low, 10% under the second |
| 11 JUN 2025 | T5851 | District 5 | SR 500 (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS | 5 of 5 | $39,625,060 | +13% |
| 11 JUN 2025 | T5852 | District 5 | SR 500 (US 441) FROM MILLS ST TO COLLEGE DR | 4 of 5 | $10,112,994 | +21% |
| 28 MAY 2025 | T5844 | District 5 | SR 513 FROM SR 518 TO PATRICK SPACE FORCE BASE | 2 of 3 | $10,265,951 | +1.0% |
| 30 APR 2025 | T5793 | District 5 | SR 9 (I-95) FROM MP 18.355 TO MP 19.552 | 6 of 7 | $76,255,055 | +27% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.