Halifax Paving, Inc.: FDOT bid record

Halifax Paving, Inc. submitted 48 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 20 of them (42%). When it was not low, its total sat a median +12% above the low bid.

Owner
Florida DOT
Low bid volume
$128,840,243
Latest bid
28 OCT 2026
Data through
28 OCT 2026
48Bids
20Low bids
42Win rate, percent
+12%Median gap to the low bid when not low, 28 bids

By year

YearBidsLow bidsWin rate
20182150%
20198225%
20204375%
20215360%
20224375%
20235240%
20246233%
20254250%
202610220%
Halifax Paving, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 5271244%
District 221838%
Halifax Paving, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Conduit, furnish & install, directional bore0630-2-12LF5240 (77%)$25.00$30.82
Work zone sign0102-60ED4532 (71%)$0.21$0.25
Conduit, furnish & install, open trench0630-2-11LF5831 (53%)$15.00$16.54
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED4531 (69%)$0.10$0.13
Thermoplastic, standard, arrow0711-11170EACH4129 (71%)$75.00$80.00
Portable changeable message sign, temporary0102-99ED4527 (60%)$10.00$12.00
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH5226 (50%)$1,178.26$1,150.00
Raised pavement marker, type B0706-1-3EACH5323 (43%)$4.75$5.00
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM4023 (57%)$1,100.00$1,350.00
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM4322 (51%)$4,450.00$5,220.00
Thermoplastic, standard-other surfaces, yellow, solid, 6"0711-16201GM4322 (51%)$4,425.00$5,200.00
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF4022 (55%)$5.88$6.09
Halifax Paving, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Halifax Paving, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T2A73District 2SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE2 of 8$16,334,2250.0%
28 OCT 2026T2A84District 2SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA3 of 7$10,147,264+10%
28 OCT 2026T2A86District 2SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT4 of 8$9,844,951+17%
30 SEP 2026T5893District 5SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 6002 of 8$5,934,449+5.0%
29 JUL 2026T5889District 5SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA4 of 5$3,687,793+24%
15 JUN 2026T5885District 5SR 400 (I-4) FROM MP 21.540 TO MP 22.5584 of 4$47,557,933+12%
10 JUN 2026T5884District 5SR 400 FROM MP 22.660 TO MP 23.4756 of 6$44,655,697+17%
29 APR 2026T5880District 5SR 5A (NOVA RD) FROM FLOMICH ST TO US 11 of 3$10,094,241Low, 3.0% under the second
25 MAR 2026T5877District 5SR 44 FROM W OF I-95 TO E OF S WALKER DR3 of 3$6,987,234+17%
25 FEB 2026T2A33District 2SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL1 of 8$6,270,148Low, 14% under the second
29 OCT 2025T5861District 5SR A1A (OCEAN SHORE BLVD) FROM N OF ROBERTA RD TO FLAGLER...2 of 4$13,556,130+4.0%
27 AUG 2025T2A35District 2SR 16 FROM SR 13 TO CR 16A4 of 8$1,690,921+18%
26 FEB 2025T5857District 5SR 600 (US 92) AND SR 44 FROM ON RAMP TO I-4 AND AT W OF G..1 of 5$117,123Low, 28% under the second
29 JAN 2025T2A14District 2SR 5 (US 1) FROM MOULTRIE CREEK BRIDGE TO N OF SR 2071 of 3$11,151,720Low, 5.0% under the second
04 DEC 2024T2A09District 2SR 13 FROM SR 16 TO RAFTER TAIL LN2 of 4$4,908,062+5.0%
13 NOV 2024T2A06District 2SR 19 FROM CROSS FLORIDA BARGE CANAL BRIDGETO S OF NICOLE DR1 of 3$6,571,980Low, 37% under the second
25 SEP 2024T5833District 5SR 5 (S RIDGEWOOD AVE) AT SPRUCE CREEK BRIDGES AND FROM ...2 of 3$2,193,774+4.0%
22 MAY 2024T5825District 5SR 5 (US 1) FROM RIDGEWOOD AVE TO N OF PALM COAST PKWY1 of 3$15,197,167Low, 7.0% under the second
28 FEB 2024T2950District 2SR 100 FROM US 17 TO FLAGER CO LINE2 of 2$3,757,773+12%
28 FEB 2024T5822District 5SR 44 (E NEW YORK AVE) AT KEPLER RD, FROM KEPLER RD TO...2 of 4$10,045,517+19%
27 SEP 2023T5801District 5SR 100 FROM N PALMETTO ST TO E OF OLD KINGS RD S1 of 3$15,286,323Low, 17% under the second
14 JUN 2023T2914District 2SR 5 (US 1)2 of 3$16,386,781+12%
17 MAY 2023T2918District 2SR15 (US 17)1 of 2$8,269,281Low, 1.0% under the second
22 FEB 2023T2879District 2SR 2062 of 5$5,579,614+11%
25 JAN 2023T5781District 5SR 15/SR 600/US 17/US 924 of 4$3,173,709+73%
Halifax Paving, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy