P & S Paving, Inc.: FDOT bid record
P & S Paving, Inc. submitted 59 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 27 AUG 2025, and was the low bidder on 21 of them (36%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $262,103,228
- Latest bid
- 27 AUG 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 1 | 20% |
| 2019 | 10 | 4 | 40% |
| 2020 | 6 | 0 | 0% |
| 2021 | 9 | 2 | 22% |
| 2022 | 8 | 3 | 38% |
| 2023 | 8 | 4 | 50% |
| 2024 | 8 | 5 | 63% |
| 2025 | 5 | 2 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 40 | 14 | 35% |
| District 2 | 19 | 7 | 37% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 78 | 21 (27%) | $16.00 | $16.54 |
| Detectable warnings | 0527-2 | SF | 42 | 21 (50%) | $29.50 | $35.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 55 | 19 (35%) | $0.11 | $0.13 |
| Mowing | 0107-2 | ACRE | 55 | 18 (33%) | $70.00 | $80.65 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 47 | 15 (32%) | $90.00 | $86.00 |
| Single post sign, remove | 0700-1-60 | AS | 41 | 14 (34%) | $33.00 | $31.94 |
| Litter removal | 0107-1 | ACRE | 54 | 13 (24%) | $31.50 | $52.98 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 35 | 13 (37%) | $35.00 | $42.32 |
| Pipe culvert,optional material,round, 18"S/CD | 0430-175118 | LF | 30 | 13 (43%) | $122.50 | $154.00 |
| Thermoplastic, standard, solid, 18" for diagonals and chevrons | 0711-11124 | LF | 48 | 12 (25%) | $4.45 | $4.58 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 33 | 12 (36%) | $52.00 | $65.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 77 | 11 (14%) | $27.50 | $30.82 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Masci General Contractors, Inc | 39 | 16 of 39 |
| Halifax Paving, Inc. | 33 | 18 of 33 |
| Preferred Materials Inc. | 20 | 5 of 20 |
| Hubbard Construction Company | 19 | 8 of 19 |
| Ranger Construction Industries, Inc. | 13 | 5 of 13 |
| Southland Construction, Inc. | 10 | 6 of 10 |
| Watson Civil Construction, Inc. | 10 | 2 of 10 |
| Duval Asphalt Products, Inc. | 9 | 3 of 9 |
| Anderson Columbia Co., Inc. | 7 | 4 of 7 |
| Sema Construction, Inc. | 6 | 1 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2025 | T2A35 | District 2 | SR 16 FROM SR 13 TO CR 16A | 1 of 8 | $1,427,276 | Low, 3.0% under the second |
| 30 JUL 2025 | T5860 | District 5 | SR 9 (I-95) FROM S OF SR 50 TO SR 46 | 5 of 5 | $37,431,007 | +25% |
| 30 APR 2025 | T2A28 | District 2 | SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO... | 6 of 8 | $15,860,889 | +18% |
| 30 APR 2025 | T5793 | District 5 | SR 9 (I-95) FROM MP 18.355 TO MP 19.552 | 1 of 7 | $60,251,683 | Low, 8.0% under the second |
| 29 JAN 2025 | T2A14 | District 2 | SR 5 (US 1) FROM MOULTRIE CREEK BRIDGE TO N OF SR 207 | 2 of 3 | $11,721,638 | +5.0% |
| 04 DEC 2024 | T5841 | District 5 | SR 401 FROM SR 528 TO CAPE CANAVERAL SPACE FORCE STATION | 2 of 3 | $6,001,008 | +8.0% |
| 30 OCT 2024 | T5834 | District 5 | SR 9 (I-95) FROM S OF SR 514 (MALBAR RD) TO N OF SR 519 (... | 1 of 5 | $63,268,311 | Low, 7.0% under the second |
| 25 SEP 2024 | T5833 | District 5 | SR 5 (S RIDGEWOOD AVE) AT SPRUCE CREEK BRIDGES AND FROM ... | 1 of 3 | $2,100,000 | Low, 4.0% under the second |
| 28 AUG 2024 | T5830 | District 5 | SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 790255 | 1 of 8 | $5,590,573 | Low, 24% under the second |
| 22 MAY 2024 | T5825 | District 5 | SR 5 (US 1) FROM RIDGEWOOD AVE TO N OF PALM COAST PKWY | 2 of 3 | $16,233,433 | +7.0% |
| 24 APR 2024 | T5824 | District 5 | SR 46 (W 1ST ST) FROM E OF I-4 TO SR 15 (US 17/92) | 2 of 7 | $17,850,682 | +7.0% |
| 28 FEB 2024 | T2950 | District 2 | SR 100 FROM US 17 TO FLAGER CO LINE | 1 of 2 | $3,345,256 | Low, 12% under the second |
| 28 FEB 2024 | T5822 | District 5 | SR 44 (E NEW YORK AVE) AT KEPLER RD, FROM KEPLER RD TO... | 1 of 4 | $8,471,031 | Low, 19% under the second |
| 25 OCT 2023 | T5799 | District 5 | SR 15 (US 17) FROM SR 15A TO S OF SPRING ST | 3 of 3 | $8,522,324 | +22% |
| 27 SEP 2023 | T5801 | District 5 | SR 100 FROM N PALMETTO ST TO E OF OLD KINGS RD S | 3 of 3 | $18,173,590 | +19% |
| 27 SEP 2023 | T5809 | District 5 | SR 11 (PERKINS HWY) AT CR 304 AND FROM VOLUSIA CO LINE TO | 2 of 2 | $20,870,934 | +10% |
| 14 JUN 2023 | T2914 | District 2 | SR 5 (US 1) | 1 of 3 | $14,592,365 | Low, 12% under the second |
| 14 JUN 2023 | T5792 | District 5 | SR 15 (US 17) | 1 of 4 | $15,097,285 | Low, 24% under the second |
| 17 MAY 2023 | T2918 | District 2 | SR15 (US 17) | 2 of 2 | $8,317,656 | +1.0% |
| 22 FEB 2023 | T2879 | District 2 | SR 206 | 1 of 5 | $5,044,796 | Low, 11% under the second |
| 25 JAN 2023 | T5781 | District 5 | SR 15/SR 600/US 17/US 92 | 1 of 4 | $1,838,831 | Low, 16% under the second |
| 07 DEC 2022 | T2897 | District 2 | SR 207 | 2 of 5 | $8,039,200 | +1.0% |
| 07 DEC 2022 | T5767 | District 5 | SR 528 | 2 of 3 | $13,661,551 | +26% |
| 26 OCT 2022 | T5773 | District 5 | SR 520 | 1 of 3 | $9,455,786 | Low, 5.0% under the second |
| 31 AUG 2022 | T5763 | District 5 | SR A1A | 3 of 4 | $2,012,362 | +19% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.